SMART GRID PROJECT ON THE ‘MONTEFALCONE’ PRIMARY STATION (Q2017728): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: import item from Italy)
(‎Removed claims)
Property / EU contribution
2,263,639.34 Euro
Amount2,263,639.34 Euro
UnitEuro
 
Property / EU contribution: 2,263,639.34 Euro / rank
Normal rank
 
Property / budget
3,064,108.56 Euro
Amount3,064,108.56 Euro
UnitEuro
 
Property / budget: 3,064,108.56 Euro / rank
Normal rank
 
Property / co-financing rate
73.88 percent
Amount73.88 percent
Unitpercent
 
Property / co-financing rate: 73.88 percent / rank
Normal rank
 

Revision as of 22:15, 9 February 2022

Project Q2017728 in Italy
Language Label Description Also known as
English
SMART GRID PROJECT ON THE ‘MONTEFALCONE’ PRIMARY STATION
Project Q2017728 in Italy

    Statements

    0 references
    26 March 2018
    0 references
    31 December 2020
    0 references
    E-DISTRIBUZIONE SPA
    0 references

    41°19'33.56"N, 15°0'32.62"E
    0 references
    IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITà SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO PREVEDE L'UTILIZZO DI DISPOSITIVI DI ULTIMA GENERAZIONE CHE PERMETTANO LA COMPLETA SMARTIZZAZIONE DELLA CABINA PRIMARIA, DELLE CABINE SECONDARIE E DEI CENTRI SATELLITE SOTTESI. INOLTRE VERRANNO IMPLEMENTATE NUOVE LINEE MT UTILIZZANDO I NUOVI CAVI IN ALLUMINIO E IN ALLUMINIO ELICORD. È PREVISTO ANCHE L'ACQUISTO DI UN NUOVO TRASFORMATORE AFFINCHé VENGA AMPLIATA LA CABINA PRIMARIA.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLEMEN (Italian)
    0 references
    THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE AIM OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE PLANT IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE PROJECT ENVISAGES THE USE OF STATE-OF-THE-ART DEVICES ENABLING THE COMPLETE SMARTISATION OF THE PRIMARY CABIN, SECONDARY AND UNDERLYING SATELLITE CENTRES. IN ADDITION, NEW MT LINES WILL BE IMPLEMENTED USING THE NEW ALUMINIUM AND ALUMINIUM WIRE ROPES. THIS WILL ALSO INCLUDE THE PURCHASE OF A NEW PROCESSOR, REFINING THE PROJECT, THE PROJECT QUALIFIES AS SMART GRIDS. IT PROVIDES FOR THE INSTALLATION OF SMART TECHNOLOGY DEVICES AND APPLIANCES FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY NETWORK, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. TO THIS END, PLEASE MAKE SURE THAT YOU DO NOT HESITATE TO CONTACT US. (English)
    0 references
    LE PROJET COMPREND À LA FOIS LA STRUCTURE ET LA MISE EN ŒUVRE DE FONCTIONNALITÉS DE RÉSEAU INTELLIGENT. LES INTERVENTIONS STRUCTURELLES VISENT À MODIFIER LA CONFIGURATION DU SYSTÈME AFIN D’AMÉLIORER LES CONDITIONS DE FONCTIONNEMENT ET LES PRESTATIONS.LE PROJET PRÉVOIT L’UTILISATION DES DISPOSITIFS DE DERNIÈRE GÉNÉRATION QUI PERMETTENT L’INTELLIGENCE COMPLÈTE DE LA CABINE PRIMAIRE, DES CABINES SECONDAIRES ET DES CENTRES SATELLITAIRES SOUS-JACENTS. EN OUTRE, DE NOUVELLES LIGNES MT SERONT MISES EN ŒUVRE À L’AIDE DES NOUVEAUX CÂBLES D’ÉLICORDE EN ALUMINIUM ET EN ALUMINIUM. IL EST ÉGALEMENT PRÉVU D’ACHETER UN NOUVEAU TRANSFORMATEUR AFIN D’AGRANDIR LA CABINE PRIMARIA.LE PROJET EST QUALIFIÉ DE RÉSEAU INTELLIGENT CAR IL PRÉVOIT L’INSTALLATION D’APPAREILS TECHNOLOGIQUES ET D’ÉQUIPEMENTS INTELLIGENTS DESTINÉS À UNE GESTION AVANCÉE DU RÉSEAU ÉLECTRIQUE, DANS LE BUT DE FACILITER L’AUGMENTATION DE LA PART DES BESOINS ÉNERGÉTIQUES COUVERTS PAR LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES. EN CE SENS, IL EST MIS EN ŒUVRE (French)
    14 December 2021
    0 references
    HET PROJECT OMVAT ZOWEL DE STRUCTUUR ALS DE IMPLEMENTATIE VAN SLIMME NETWERKFUNCTIES. DE STRUCTURELE INTERVENTIES ZIJN BEDOELD OM DE CONFIGURATIE VAN HET SYSTEEM TE WIJZIGEN OM DE BEDRIJFSOMSTANDIGHEDEN TE VERBETEREN EN HET PROJECT PRESTATIONS.THE VOORZIET IN HET GEBRUIK VAN DE NIEUWSTE GENERATIE APPARATEN DIE DE VOLLEDIGE SLIMMER MAKEN VAN DE PRIMAIRE CABINE, SECUNDAIRE CABINES EN SATELLIETCENTRA DIE ERAAN TEN GRONDSLAG LIGGEN. DAARNAAST ZULLEN NIEUWE MT-LIJNEN WORDEN GEÏMPLEMENTEERD MET BEHULP VAN DE NIEUWE ALUMINIUM EN ALUMINIUM ELICORD KABELS. HET IS OOK DE BEDOELING EEN NIEUWE TRANSFORMATOR AAN TE SCHAFFEN OM DE CABINE PRIMARIA UIT TE BREIDEN. HET PROJECT KWALIFICEERT ALS SLIM NET, AANGEZIEN HET VOORZIET IN DE INSTALLATIE VAN TECHNOLOGISCHE APPARATEN EN INTELLIGENTE APPARATUUR DIE GERICHT ZIJN OP EEN GEAVANCEERD BEHEER VAN HET ELEKTRICITEITSNET, TENEINDE DE TOENAME VAN HET AANDEEL VAN ENERGIEBEHOEFTEN DIE WORDEN GEDEKT DOOR OPWEKKING UIT HERNIEUWBARE BRONNEN TE VERGEMAKKELIJKEN. IN DIE ZIN WORDT HET TEN UITVOER GELEGD. (Dutch)
    22 December 2021
    0 references
    DAS PROJEKT UMFASST SOWOHL DIE STRUKTUR ALS AUCH DIE UMSETZUNG VON SMART GRID-FUNKTIONEN. DIE STRUKTURINTERVENTIONEN ZIELEN DARAUF AB, DIE KONFIGURATION DES SYSTEMS ZU ÄNDERN, UM DIE BETRIEBSBEDINGUNGEN ZU VERBESSERN, UND DAS PROJEKT PRESTATIONS.THE SIEHT DIE VERWENDUNG VON GERÄTEN DER NEUESTEN GENERATION VOR, DIE EINE VOLLSTÄNDIGE INTELLIGENTE GESTALTUNG DER PRIMÄREN KABINE, SEKUNDÄRKABINEN UND SATELLITENZENTREN ERMÖGLICHEN, DIE IHNEN ZUGRUNDE LIEGEN. DARÜBER HINAUS WERDEN NEUE MT-LINIEN MIT DEN NEUEN ALUMINIUM- UND ALUMINIUMELICORDKABELN REALISIERT. ES IST AUCH GEPLANT, EINEN NEUEN TRANSFORMATOR ZU ERWERBEN, UM DIE KABINE PRIMARIA ZU ERWEITERN.DAS PROJEKT QUALIFIZIERT ALS INTELLIGENTES NETZ, DA ES DIE INSTALLATION VON TECHNOLOGISCHEN GERÄTEN UND INTELLIGENTEN GERÄTEN FÜR EINE FORTSCHRITTLICHE VERWALTUNG DES STROMNETZES VORSIEHT, UM DEN ANSTIEG DES ANTEILS DES ENERGIEBEDARFS ZU ERLEICHTERN, DER DURCH DIE ERZEUGUNG GEDECKT WIRD, DIE AUS ERNEUERBAREN QUELLEN VERTEILT WIRD. IN DIESEM SINNE WIRD ES UMGESETZT (German)
    24 December 2021
    0 references
    EL PROYECTO INCLUYE TANTO LA ESTRUCTURA COMO LA IMPLEMENTACIÓN DE CARACTERÍSTICAS DE RED INTELIGENTE. LAS INTERVENCIONES ESTRUCTURALES TIENEN COMO OBJETIVO MODIFICAR LA CONFIGURACIÓN DEL SISTEMA CON EL FIN DE MEJORAR LAS CONDICIONES DE FUNCIONAMIENTO Y LAS PRESTACIONES. EL PROYECTO PREVÉ EL USO DE LOS DISPOSITIVOS DE ÚLTIMA GENERACIÓN QUE PERMITAN LA TOTAL INTELIGENTEIZACIÓN DE LA CABINA PRIMARIA, CABINAS SECUNDARIAS Y CENTROS SATELITALES SUBYACENTES. ADEMÁS, SE IMPLEMENTARÁN NUEVAS LÍNEAS MT UTILIZANDO LOS NUEVOS CABLES DE ELICORD DE ALUMINIO Y ALUMINIO. TAMBIÉN ESTÁ PREVISTO ADQUIRIR UN NUEVO TRANSFORMADOR PARA AMPLIAR LA CABINA PRIMARIA. EL PROYECTO SE CALIFICA COMO RED INTELIGENTE YA QUE PREVÉ LA INSTALACIÓN DE DISPOSITIVOS TECNOLÓGICOS Y EQUIPOS INTELIGENTES DESTINADOS A UNA GESTIÓN AVANZADA DE LA RED ELÉCTRICA, CON EL OBJETIVO DE FACILITAR EL AUMENTO DE LA CUOTA DE LAS NECESIDADES ENERGÉTICAS CUBIERTAS POR LA GENERACIÓN DISTRIBUIDA A PARTIR DE FUENTES RENOVABLES. EN ESTE SENTIDO, SE IMPLEMENTA (Spanish)
    24 January 2022
    0 references
    MONTEFALCONE DI VAL F
    0 references

    Identifiers

    F68D18000000006
    0 references