Energy modernisation of the Kossuth Film Theatre building (Q3950698): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
The Municipality of Mohács considers the rationalisation of the energy use of municipal institutions a top priority. The city has recently made a number of energy rationalisation investments: modernisation of public lighting, construction of biomass power plants and energy modernisation of several municipal buildings. The present project is part of this line, as part of this project, the Kossuth Film Theatre in Mohács will be upgraded to energy. As part of the project, the energy modernisation of the Kossuth Film Theatre will be realised. The primary objective is to significantly reduce the annual energy use and operating costs of the building, as well as greenhouse gas emissions, thereby reducing the municipal energy costs. The project is in line with the development directions set out in measure 3.2 of the TOP: energy efficiency-oriented rehabilitation of municipal-owned buildings, institutions, infrastructure, and improvement of the thermal insulation of buildings will be achieved, and the energy modernisation of municipal-owned buildings and infrastructure will be achieved. The project is also in line with the objectives of the call for proposals derived from the TOP: the development of a municipal-owned building aimed at energy efficiency and the increased use of domestic renewable energy sources will also be achieved, thus contributing to the fulfilment of the indicators set out in the call and the TOP. The institution which is the subject of the project is located in Mohács’s administrative area at 7,700 Mohács, Deák tér 3. The external boundaries of the building do not meet the requirements of thermal engineering, resulting in very high energy consumption and energy costs. The chosen measures are based on the proposals of the building energy expert involved in the energy assessment, according to which the thermal characteristics of the building structures will comply with the requirements of the 7/2006 as of 01.01.2016 following the implementation of the planned developments. The nearly zero level requirements of Decree TNM. During the project, a complete building structure renovation will be carried out. 3.1.1. (a) modernisation of external boundaries:Instead of poorly closing metal doors and windows, doors and windows with 3 layers of thermal insulation glazing are installed and a shielding system is installed. The flat roof is designed to insulate in a thickness of 20 cm. The arcade slab also receives 25 cm thermal insulation. The facade walls are designed to be insulated with 14 cm and 16 cm thick rock wool material or technically equivalent; 10 cm expanded polystyrene foam or technically equivalent is attached to the plinth wall. 3.1.1.(d) Installation of solar panels: Solar panels will be installed as part of the project. The thermal characteristics of the building structures will be in accordance with Article 7/2006 following the completion of the planned developments. The “nearly zero” level requirements of Decree No 30/2000 of 24 May 2005 of the Minister for National Development (V.24.) In the framework of this project, the mandatory activities to be carried out include 3.1.2.1 (a) accessibility (based on the declaration of the specialist rehabilitation engineer), 3.1.2.1 (b) publicity (according to the mandatory requirements laid down in the document entitled ‘Information obligations for beneficiaries’) and 3.1.2.1 d) training for building users. The total duration of the project is 20 months: 2018.01.01. — 2019.08.31. The project owner is the owner of the building concerned by the development, the Municipality of Mohács. The operation of the new heating system to be developed in the framework of the project will be carried out by the owner municipality, and no external service provider or other operating company will be involved in the operation. (English)
Property / summary: The Municipality of Mohács considers the rationalisation of the energy use of municipal institutions a top priority. The city has recently made a number of energy rationalisation investments: modernisation of public lighting, construction of biomass power plants and energy modernisation of several municipal buildings. The present project is part of this line, as part of this project, the Kossuth Film Theatre in Mohács will be upgraded to energy. As part of the project, the energy modernisation of the Kossuth Film Theatre will be realised. The primary objective is to significantly reduce the annual energy use and operating costs of the building, as well as greenhouse gas emissions, thereby reducing the municipal energy costs. The project is in line with the development directions set out in measure 3.2 of the TOP: energy efficiency-oriented rehabilitation of municipal-owned buildings, institutions, infrastructure, and improvement of the thermal insulation of buildings will be achieved, and the energy modernisation of municipal-owned buildings and infrastructure will be achieved. The project is also in line with the objectives of the call for proposals derived from the TOP: the development of a municipal-owned building aimed at energy efficiency and the increased use of domestic renewable energy sources will also be achieved, thus contributing to the fulfilment of the indicators set out in the call and the TOP. The institution which is the subject of the project is located in Mohács’s administrative area at 7,700 Mohács, Deák tér 3. The external boundaries of the building do not meet the requirements of thermal engineering, resulting in very high energy consumption and energy costs. The chosen measures are based on the proposals of the building energy expert involved in the energy assessment, according to which the thermal characteristics of the building structures will comply with the requirements of the 7/2006 as of 01.01.2016 following the implementation of the planned developments. The nearly zero level requirements of Decree TNM. During the project, a complete building structure renovation will be carried out. 3.1.1. (a) modernisation of external boundaries:Instead of poorly closing metal doors and windows, doors and windows with 3 layers of thermal insulation glazing are installed and a shielding system is installed. The flat roof is designed to insulate in a thickness of 20 cm. The arcade slab also receives 25 cm thermal insulation. The facade walls are designed to be insulated with 14 cm and 16 cm thick rock wool material or technically equivalent; 10 cm expanded polystyrene foam or technically equivalent is attached to the plinth wall. 3.1.1.(d) Installation of solar panels: Solar panels will be installed as part of the project. The thermal characteristics of the building structures will be in accordance with Article 7/2006 following the completion of the planned developments. The “nearly zero” level requirements of Decree No 30/2000 of 24 May 2005 of the Minister for National Development (V.24.) In the framework of this project, the mandatory activities to be carried out include 3.1.2.1 (a) accessibility (based on the declaration of the specialist rehabilitation engineer), 3.1.2.1 (b) publicity (according to the mandatory requirements laid down in the document entitled ‘Information obligations for beneficiaries’) and 3.1.2.1 d) training for building users. The total duration of the project is 20 months: 2018.01.01. — 2019.08.31. The project owner is the owner of the building concerned by the development, the Municipality of Mohács. The operation of the new heating system to be developed in the framework of the project will be carried out by the owner municipality, and no external service provider or other operating company will be involved in the operation. (English) / rank
 
Normal rank
Property / summary: The Municipality of Mohács considers the rationalisation of the energy use of municipal institutions a top priority. The city has recently made a number of energy rationalisation investments: modernisation of public lighting, construction of biomass power plants and energy modernisation of several municipal buildings. The present project is part of this line, as part of this project, the Kossuth Film Theatre in Mohács will be upgraded to energy. As part of the project, the energy modernisation of the Kossuth Film Theatre will be realised. The primary objective is to significantly reduce the annual energy use and operating costs of the building, as well as greenhouse gas emissions, thereby reducing the municipal energy costs. The project is in line with the development directions set out in measure 3.2 of the TOP: energy efficiency-oriented rehabilitation of municipal-owned buildings, institutions, infrastructure, and improvement of the thermal insulation of buildings will be achieved, and the energy modernisation of municipal-owned buildings and infrastructure will be achieved. The project is also in line with the objectives of the call for proposals derived from the TOP: the development of a municipal-owned building aimed at energy efficiency and the increased use of domestic renewable energy sources will also be achieved, thus contributing to the fulfilment of the indicators set out in the call and the TOP. The institution which is the subject of the project is located in Mohács’s administrative area at 7,700 Mohács, Deák tér 3. The external boundaries of the building do not meet the requirements of thermal engineering, resulting in very high energy consumption and energy costs. The chosen measures are based on the proposals of the building energy expert involved in the energy assessment, according to which the thermal characteristics of the building structures will comply with the requirements of the 7/2006 as of 01.01.2016 following the implementation of the planned developments. The nearly zero level requirements of Decree TNM. During the project, a complete building structure renovation will be carried out. 3.1.1. (a) modernisation of external boundaries:Instead of poorly closing metal doors and windows, doors and windows with 3 layers of thermal insulation glazing are installed and a shielding system is installed. The flat roof is designed to insulate in a thickness of 20 cm. The arcade slab also receives 25 cm thermal insulation. The facade walls are designed to be insulated with 14 cm and 16 cm thick rock wool material or technically equivalent; 10 cm expanded polystyrene foam or technically equivalent is attached to the plinth wall. 3.1.1.(d) Installation of solar panels: Solar panels will be installed as part of the project. The thermal characteristics of the building structures will be in accordance with Article 7/2006 following the completion of the planned developments. The “nearly zero” level requirements of Decree No 30/2000 of 24 May 2005 of the Minister for National Development (V.24.) In the framework of this project, the mandatory activities to be carried out include 3.1.2.1 (a) accessibility (based on the declaration of the specialist rehabilitation engineer), 3.1.2.1 (b) publicity (according to the mandatory requirements laid down in the document entitled ‘Information obligations for beneficiaries’) and 3.1.2.1 d) training for building users. The total duration of the project is 20 months: 2018.01.01. — 2019.08.31. The project owner is the owner of the building concerned by the development, the Municipality of Mohács. The operation of the new heating system to be developed in the framework of the project will be carried out by the owner municipality, and no external service provider or other operating company will be involved in the operation. (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:55, 9 February 2022

Project Q3950698 in Hungary
Language Label Description Also known as
English
Energy modernisation of the Kossuth Film Theatre building
Project Q3950698 in Hungary

    Statements

    0 references
    0 references
    133,605,058 forint
    0 references
    369,446.04 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    447,186.559 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    163,587,346.949 forint
    0 references
    81.672411 percent
    0 references
    1 September 2018
    0 references
    31 August 2021
    0 references
    MOHÁCS VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    45°59'36.17"N, 18°40'55.60"E
    0 references
    Mohács Város Önkormányzata kiemelt prioritásként kezeli a települési intézmények energiafelhasználásának racionalizálását. Az elmúlt időszakban a városban számos energia racionalizációs célú beruházás valósult meg: közvilágítás korszerűsítés, biomassza erőmű kiépítése és több önkormányzati épület energetikai korszerűsítése. Jelen projekt e sorba illeszkedik, e projekt keretében a mohácsi Kossuth Filmszínház energetikai korszerűsítése történik meg. A projekt keretében a Kossuth Filmszínház energetikai korszerűsítése valósul meg. Elsődleges cél, hogy az épület éves energiafelhasználása és üzemeltetési költsége, valamint az üvegházhatású gázok kibocsátása jelentősen csökkenjen, ezáltal csökkenjenek az önkormányzat energiaköltségei. A projekt összhangban van a TOP 3.2 intézkedésében megfogalmazott fejlesztési irányokkal: az önkormányzati tulajdonú épületek, intézmények, infrastruktúra energiahatékonyság-központú rehabilitációja, az épületek hőszigetelésének javítása a cél, illetve önkormányzati tulajdonú épületek intézmények és infrastruktúra energetikai korszerűsítése valósul meg. A projekt összhangban van a pályázati felhívás TOP-ból levezetett céljaival is: önkormányzati tulajdonú épület energiahatékonyságot célzó fejlesztése, valamint a hazai megújuló energiaforrások fokozottabb használata is megvalósul, hozzájárulva ezáltal a felhívásban és a TOP-ban rögzített indikátorok teljesüléséhez. A projekt tárgyát képező intézmény Mohács közigazgatási területén, a 7700 Mohács, Deák tér 3. szám alatt található. Az épület külső határoló szerkezetei nem felelnek meg a hőtechnikai követelményeknek, ami igen magas energiafelhasználást és energiaköltséget eredményeznek. A választott intézkedések az energetikai felmérésbe bevont épületenergetikai szakértő javaslatain alapulnak, miszerint az épületszerkezetek hőtechnikai jellemzői a tervezett fejlesztések megvalósulását követően meg fognak felelni a 2016.01.01-től hatályos 7/2006. TNM rendelet közel nulla szint követelményeinek. A projekt során teljes épületszerkezeti felújítás valósul meg. 3.1.1. a) külső határoló szerkezetek korszerűsítése:A rosszul záródó fém nyílászárók helyett, 3 rétegű hőszigetelő üvegezéssel ellátott nyílászárók kerülnek beépítésre, valamint árnyékoló rendszer kerül kiépítésre. A lapostetőt 20 cm vastagságban tervezzük leszigetelni. Az árkád födém ugyancsak 25 cm hőszigetelést kap. A homlokzati falakat 14 cm és 16 cm vastag kőzetgyapot anyaggal vagy azzal műszakilag egyenértékű tervezzük szigetelni, a lábazati falra 10 cm expandált polisztirolhab vagy azzal műszakilag egyenértékű kerül felragasztásra. 3.1.1. d) Napelemek telepítése: A projekt keretében napelemek is telepítésre kerülnek. Az épületszerkezetek hőtechnikai jellemzői a tervezett fejlesztések megvalósulását követően meg fognak felelni a 7/2006. (V.24.) TNM rendelet „közel nulla” szint követelményeinek. Jelen projekt keretében a kötelezően megvalósítandó tevékenységek közül a 3.1.2.1 a) akadálymentesítés (a rehabilitációs szakmérnök nyilatkozata alapján), 3.1.2.1 b) nyilvánosság biztosítása (a „Kedvezményezettek tájékoztatási kötelezettségei” című dokumentumban kötelezően előírt követelményeknek megfelelően), és 3.1.2.1 d) az épületet használók képzése valósul meg. A projekt futamideje összesen 20 hónap: 2018.01.01. – 2019.08.31. A projektgazda a fejlesztéssel érintett épület tulajdonosa, Mohács Város Önkormányzata. A projekt keretében kialakításra kerülő új fűtési rendszer üzemeltetését a tulajdonos önkormányzat fogja végezni, az üzemeltetésbe külső szolgáltató, vagy egyéb üzemeltető cég nem kerül bevonásra. (Hungarian)
    0 references
    The Municipality of Mohács considers the rationalisation of the energy use of municipal institutions a top priority. The city has recently made a number of energy rationalisation investments: modernisation of public lighting, construction of biomass power plants and energy modernisation of several municipal buildings. The present project is part of this line, as part of this project, the Kossuth Film Theatre in Mohács will be upgraded to energy. As part of the project, the energy modernisation of the Kossuth Film Theatre will be realised. The primary objective is to significantly reduce the annual energy use and operating costs of the building, as well as greenhouse gas emissions, thereby reducing the municipal energy costs. The project is in line with the development directions set out in measure 3.2 of the TOP: energy efficiency-oriented rehabilitation of municipal-owned buildings, institutions, infrastructure, and improvement of the thermal insulation of buildings will be achieved, and the energy modernisation of municipal-owned buildings and infrastructure will be achieved. The project is also in line with the objectives of the call for proposals derived from the TOP: the development of a municipal-owned building aimed at energy efficiency and the increased use of domestic renewable energy sources will also be achieved, thus contributing to the fulfilment of the indicators set out in the call and the TOP. The institution which is the subject of the project is located in Mohács’s administrative area at 7,700 Mohács, Deák tér 3. The external boundaries of the building do not meet the requirements of thermal engineering, resulting in very high energy consumption and energy costs. The chosen measures are based on the proposals of the building energy expert involved in the energy assessment, according to which the thermal characteristics of the building structures will comply with the requirements of the 7/2006 as of 01.01.2016 following the implementation of the planned developments. The nearly zero level requirements of Decree TNM. During the project, a complete building structure renovation will be carried out. 3.1.1. (a) modernisation of external boundaries:Instead of poorly closing metal doors and windows, doors and windows with 3 layers of thermal insulation glazing are installed and a shielding system is installed. The flat roof is designed to insulate in a thickness of 20 cm. The arcade slab also receives 25 cm thermal insulation. The facade walls are designed to be insulated with 14 cm and 16 cm thick rock wool material or technically equivalent; 10 cm expanded polystyrene foam or technically equivalent is attached to the plinth wall. 3.1.1.(d) Installation of solar panels: Solar panels will be installed as part of the project. The thermal characteristics of the building structures will be in accordance with Article 7/2006 following the completion of the planned developments. The “nearly zero” level requirements of Decree No 30/2000 of 24 May 2005 of the Minister for National Development (V.24.) In the framework of this project, the mandatory activities to be carried out include 3.1.2.1 (a) accessibility (based on the declaration of the specialist rehabilitation engineer), 3.1.2.1 (b) publicity (according to the mandatory requirements laid down in the document entitled ‘Information obligations for beneficiaries’) and 3.1.2.1 d) training for building users. The total duration of the project is 20 months: 2018.01.01. — 2019.08.31. The project owner is the owner of the building concerned by the development, the Municipality of Mohács. The operation of the new heating system to be developed in the framework of the project will be carried out by the owner municipality, and no external service provider or other operating company will be involved in the operation. (English)
    9 February 2022
    0 references
    Mohács, Baranya
    0 references

    Identifiers

    TOP-3.2.1-16-BA1-2017-00010
    0 references