Energy modernisation of municipal buildings in Nagykanisa (Q3953555): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
By developing public buildings in the City of Nagykanizsa for energy purposes, it aims to promote an increase in energy efficiency and the use of renewable energy sources, both in order to achieve the transition to a low-carbon economy and as a means of demonstrating awareness-raising towards the population. The applicant intends to apply with the following development elements in the following locations: 8800 Nagykanizsa Rozgonyi Street: 1244, Batthyány Lajos High School, Main Building — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation, 26 cm rock wool suspended ceiling thermal insulation — 3.1.1 a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.2.2 (a) Heating upgrade: Installation of condensation gas boiler, Installation of thermostatic valve heads — 3.1.2.2 e) Lighting upgrade: Installation of LED light sources 8800 Nagykanizsa Rózsa u. 7. 3046/5, Central Rose Nursery — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.1 (d) Solar panel system: 15 kW connection power 8800 Nagykanizsa Rózsa u. 17/B. hrsz.: 3053/2, Central Rose Kindergarten Hevesi School — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.2.2 (a) Heating upgrade: Installation of 4 radiators — 3.1.2.2 (c) Installation of the heat pump: Installation of air-to-water heat pump — 3.1.1 (d) Solar panel system: 35 kW connection power 8800 Nagykanizsa Attila u. 7. hrsz.: 2986/1, Central Rose Kindergarten, Attila Member School — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation? 3.1.1 (a) Opening closure replacement: Installation of insulated doors and windows with 3 layers of glazing? 3.1.1.(d) Solar panel system: 12.5 kW connection power (including the crèche) 8800 Nagykanizsa Attila u. 7. hrsz.: 2986/2, Nagykanizsa Unified Cradle House Bölcsőde — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.1 (d) Solar panel system: 12.5 kW connection power (including Attila Membership) 8800 Nagykanizsa Csokonai u. 5. hrsz.: 3076/2, Central Rose Kindergarten Garden City School — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.2.2 a) Heating upgrade: Installation of condensation gas boiler, Installation of thermostatic valve heads 8800 Nagykanizsa Csokonai u. 5. 3076/1, Nagykanizsa Unified Cradle of Napraforgó Bölcsőde — 3.1.1 (b) Heating modernisation: Installation of condensation gas boiler, Thermostatic valve heads 8800 Nagykanizsa Teleki u. 19/B. hrsz.: 3110/8, Nagykanizsa Consolidated Social Institution: — 3.1.1 (d) Solar panel system: 45 kW connection power 8800 Nagykanizsa Széchenyi tér 5. 2449/2, Sándor Hevesi Cultural Centre: — 3.1.1 (d) Solar panel system: 50 kW connection power 8800 Nagykanizsa Kálvin tér 5. Hr.: 1204, Halis István City Library: — 3.1.1 (d) Solar panel system: 12.5 kW connection power 8800 Nagykanizsa Corvin u. 2.hrsz.: 823/32, Central Rose Nursery School Seven Color Flowers Membership: — 3.1.1 (d) Solar panel system: 10 kW connection power 8800 Nagykanizsa Kisfaludy Sándor u. 19. hrsz.: 2311, Nagykanizsa unified Bóbita Bóbita Cradle: — 3.1.1 (d) Solar panel system: 10 kW connection power The following monitoring indicators are available with the above improvements: — Reduction of greenhouse gas emissions (t/year): 452,851 — Reduction of primary energy use achieved by energy efficiency improvements (GJ/year): 5087,376 — Reduction in annual primary energy consumption of buildings (kWh/year): 1959150,000 — Additional capacity for renewable energy generation (kW): 257,856 — Amount of energy from renewable sources (GJ/year): 786,264 The project is expected to start on 1 September 2020 and be completed on 1 February 2022. The project promoter set 8 milestones during the implementation. Within the framework of the project, in accordance with point 3.1.1(g) of the call, the transformation of the Municipal Sustainable Energy Action Plan (SEAP) of the Municipality of Nagykanizsa into a Sustainable Energy and Climate Action Plan (SECAP) is planned. For the buildings involved in the development, proportional accessibility to the project, including ICT accessibility, is planned, except for locations with solar-only development. (English) | |||||||||||||||
Property / summary: By developing public buildings in the City of Nagykanizsa for energy purposes, it aims to promote an increase in energy efficiency and the use of renewable energy sources, both in order to achieve the transition to a low-carbon economy and as a means of demonstrating awareness-raising towards the population. The applicant intends to apply with the following development elements in the following locations: 8800 Nagykanizsa Rozgonyi Street: 1244, Batthyány Lajos High School, Main Building — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation, 26 cm rock wool suspended ceiling thermal insulation — 3.1.1 a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.2.2 (a) Heating upgrade: Installation of condensation gas boiler, Installation of thermostatic valve heads — 3.1.2.2 e) Lighting upgrade: Installation of LED light sources 8800 Nagykanizsa Rózsa u. 7. 3046/5, Central Rose Nursery — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.1 (d) Solar panel system: 15 kW connection power 8800 Nagykanizsa Rózsa u. 17/B. hrsz.: 3053/2, Central Rose Kindergarten Hevesi School — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.2.2 (a) Heating upgrade: Installation of 4 radiators — 3.1.2.2 (c) Installation of the heat pump: Installation of air-to-water heat pump — 3.1.1 (d) Solar panel system: 35 kW connection power 8800 Nagykanizsa Attila u. 7. hrsz.: 2986/1, Central Rose Kindergarten, Attila Member School — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation? 3.1.1 (a) Opening closure replacement: Installation of insulated doors and windows with 3 layers of glazing? 3.1.1.(d) Solar panel system: 12.5 kW connection power (including the crèche) 8800 Nagykanizsa Attila u. 7. hrsz.: 2986/2, Nagykanizsa Unified Cradle House Bölcsőde — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.1 (d) Solar panel system: 12.5 kW connection power (including Attila Membership) 8800 Nagykanizsa Csokonai u. 5. hrsz.: 3076/2, Central Rose Kindergarten Garden City School — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.2.2 a) Heating upgrade: Installation of condensation gas boiler, Installation of thermostatic valve heads 8800 Nagykanizsa Csokonai u. 5. 3076/1, Nagykanizsa Unified Cradle of Napraforgó Bölcsőde — 3.1.1 (b) Heating modernisation: Installation of condensation gas boiler, Thermostatic valve heads 8800 Nagykanizsa Teleki u. 19/B. hrsz.: 3110/8, Nagykanizsa Consolidated Social Institution: — 3.1.1 (d) Solar panel system: 45 kW connection power 8800 Nagykanizsa Széchenyi tér 5. 2449/2, Sándor Hevesi Cultural Centre: — 3.1.1 (d) Solar panel system: 50 kW connection power 8800 Nagykanizsa Kálvin tér 5. Hr.: 1204, Halis István City Library: — 3.1.1 (d) Solar panel system: 12.5 kW connection power 8800 Nagykanizsa Corvin u. 2.hrsz.: 823/32, Central Rose Nursery School Seven Color Flowers Membership: — 3.1.1 (d) Solar panel system: 10 kW connection power 8800 Nagykanizsa Kisfaludy Sándor u. 19. hrsz.: 2311, Nagykanizsa unified Bóbita Bóbita Cradle: — 3.1.1 (d) Solar panel system: 10 kW connection power The following monitoring indicators are available with the above improvements: — Reduction of greenhouse gas emissions (t/year): 452,851 — Reduction of primary energy use achieved by energy efficiency improvements (GJ/year): 5087,376 — Reduction in annual primary energy consumption of buildings (kWh/year): 1959150,000 — Additional capacity for renewable energy generation (kW): 257,856 — Amount of energy from renewable sources (GJ/year): 786,264 The project is expected to start on 1 September 2020 and be completed on 1 February 2022. The project promoter set 8 milestones during the implementation. Within the framework of the project, in accordance with point 3.1.1(g) of the call, the transformation of the Municipal Sustainable Energy Action Plan (SEAP) of the Municipality of Nagykanizsa into a Sustainable Energy and Climate Action Plan (SECAP) is planned. For the buildings involved in the development, proportional accessibility to the project, including ICT accessibility, is planned, except for locations with solar-only development. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: By developing public buildings in the City of Nagykanizsa for energy purposes, it aims to promote an increase in energy efficiency and the use of renewable energy sources, both in order to achieve the transition to a low-carbon economy and as a means of demonstrating awareness-raising towards the population. The applicant intends to apply with the following development elements in the following locations: 8800 Nagykanizsa Rozgonyi Street: 1244, Batthyány Lajos High School, Main Building — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation, 26 cm rock wool suspended ceiling thermal insulation — 3.1.1 a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.2.2 (a) Heating upgrade: Installation of condensation gas boiler, Installation of thermostatic valve heads — 3.1.2.2 e) Lighting upgrade: Installation of LED light sources 8800 Nagykanizsa Rózsa u. 7. 3046/5, Central Rose Nursery — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.1 (d) Solar panel system: 15 kW connection power 8800 Nagykanizsa Rózsa u. 17/B. hrsz.: 3053/2, Central Rose Kindergarten Hevesi School — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.2.2 (a) Heating upgrade: Installation of 4 radiators — 3.1.2.2 (c) Installation of the heat pump: Installation of air-to-water heat pump — 3.1.1 (d) Solar panel system: 35 kW connection power 8800 Nagykanizsa Attila u. 7. hrsz.: 2986/1, Central Rose Kindergarten, Attila Member School — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation? 3.1.1 (a) Opening closure replacement: Installation of insulated doors and windows with 3 layers of glazing? 3.1.1.(d) Solar panel system: 12.5 kW connection power (including the crèche) 8800 Nagykanizsa Attila u. 7. hrsz.: 2986/2, Nagykanizsa Unified Cradle House Bölcsőde — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.1 (d) Solar panel system: 12.5 kW connection power (including Attila Membership) 8800 Nagykanizsa Csokonai u. 5. hrsz.: 3076/2, Central Rose Kindergarten Garden City School — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.2.2 a) Heating upgrade: Installation of condensation gas boiler, Installation of thermostatic valve heads 8800 Nagykanizsa Csokonai u. 5. 3076/1, Nagykanizsa Unified Cradle of Napraforgó Bölcsőde — 3.1.1 (b) Heating modernisation: Installation of condensation gas boiler, Thermostatic valve heads 8800 Nagykanizsa Teleki u. 19/B. hrsz.: 3110/8, Nagykanizsa Consolidated Social Institution: — 3.1.1 (d) Solar panel system: 45 kW connection power 8800 Nagykanizsa Széchenyi tér 5. 2449/2, Sándor Hevesi Cultural Centre: — 3.1.1 (d) Solar panel system: 50 kW connection power 8800 Nagykanizsa Kálvin tér 5. Hr.: 1204, Halis István City Library: — 3.1.1 (d) Solar panel system: 12.5 kW connection power 8800 Nagykanizsa Corvin u. 2.hrsz.: 823/32, Central Rose Nursery School Seven Color Flowers Membership: — 3.1.1 (d) Solar panel system: 10 kW connection power 8800 Nagykanizsa Kisfaludy Sándor u. 19. hrsz.: 2311, Nagykanizsa unified Bóbita Bóbita Cradle: — 3.1.1 (d) Solar panel system: 10 kW connection power The following monitoring indicators are available with the above improvements: — Reduction of greenhouse gas emissions (t/year): 452,851 — Reduction of primary energy use achieved by energy efficiency improvements (GJ/year): 5087,376 — Reduction in annual primary energy consumption of buildings (kWh/year): 1959150,000 — Additional capacity for renewable energy generation (kW): 257,856 — Amount of energy from renewable sources (GJ/year): 786,264 The project is expected to start on 1 September 2020 and be completed on 1 February 2022. The project promoter set 8 milestones during the implementation. Within the framework of the project, in accordance with point 3.1.1(g) of the call, the transformation of the Municipal Sustainable Energy Action Plan (SEAP) of the Municipality of Nagykanizsa into a Sustainable Energy and Climate Action Plan (SECAP) is planned. For the buildings involved in the development, proportional accessibility to the project, including ICT accessibility, is planned, except for locations with solar-only development. (English) / qualifier | |||||||||||||||
point in time: 9 February 2022
|
Revision as of 16:54, 9 February 2022
Project Q3953555 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of municipal buildings in Nagykanisa |
Project Q3953555 in Hungary |
Statements
1,308,999,999 forint
0 references
4,066,268.077 Euro
0.0027336256 Euro
15 December 2021
0 references
1,487,499,998.864 forint
0 references
88.0 percent
0 references
1 January 2021
0 references
30 September 2022
0 references
NAGYKANIZSA MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA
0 references
Nagykanizsa Város középületeinek energetikai célú fejlesztésével, az energiahatékonyság és a megújuló energiaforrások felhasználásának növekedését kívánja előmozdítani, egyrészt az alacsony széndioxid-kibocsátású gazdaságra való áttérés megvalósítása érdekében, másrészt a lakosság felé történő szemléletformálás demonstrációs eszköze érdekében. A pályázó az alábbi helyszíneken az alábbi fejlesztési elemekkel kíván pályázni: 8800 Nagykanizsa Rozgonyi u. 23. hrsz.: 1244, Batthyány Lajos Gimnázium, Főépület - 3.1.1 a) Hőszigetelés: 14 cm Grafitos EPS homlokzati hőszigetelés, 20 cm EPS lapostető hőszigetelés, 26 cm kőzetgyapot álmennyezet hőszigetelés - 3.1.1 a) Nyílászáró csere: 3 rétegű üvegezéssel ellátott, hőszigetelt nyílászárók beépítése - 3.1.2.2 a) Fűtés korszerűsítés: Kondenzációs gázkazán beépítése, Termosztatikus szelepfejek felszerelése - 3.1.2.2 e) Világítás korszerűsítés: LED-es fényforrások beépítése 8800 Nagykanizsa Rózsa u. 7. hrsz.: 3046/5, Központi Rózsa Óvoda - 3.1.1 a) Hőszigetelés: 14 cm Grafitos EPS homlokzati hőszigetelés, 20 cm EPS lapostető hőszigetelés - 3.1.1 a) Nyílászáró csere: 3 rétegű üvegezéssel ellátott, hőszigetelt nyílászárók beépítése - 3.1.1. d) Napelemes rendszer: 15 kW csatlakozási teljesítmény 8800 Nagykanizsa Rózsa u. 17/B. hrsz.: 3053/2, Központi Rózsa Óvoda Hevesi Tagóvodája - 3.1.1 a) Hőszigetelés: 14 cm Grafitos EPS homlokzati hőszigetelés, 20 cm EPS lapostető hőszigetelés - 3.1.1 a) Nyílászáró csere: 3 rétegű üvegezéssel ellátott, hőszigetelt nyílászárók beépítése - 3.1.2.2 a) Fűtés korszerűsítés: 4 db radiátor beépítése - 3.1.2.2 c) Hőszivattyú telepítése: Levegő-víz hőszivattyú telepítése - 3.1.1. d) Napelemes rendszer: 35 kW csatlakozási teljesítmény 8800 Nagykanizsa Attila u. 7. hrsz.: 2986/1, Központi Rózsa Óvoda Attila Tagóvodája - 3.1.1 a) Hőszigetelés: 14 cm Grafitos EPS homlokzati hőszigetelés, 20 cm EPS lapostető hőszigetelés ? 3.1.1 a) Nyílászáró csere: 3 rétegű üvegezéssel ellátott, hőszigetelt nyílászárók beépítése ? 3.1.1. d) Napelemes rendszer: 12,5 kW csatlakozási teljesítmény (Meseház Bölcsődével együtt) 8800 Nagykanizsa Attila u. 7. hrsz.: 2986/2, Nagykanizsai Egyesített Bölcsőde Meseház Bölcsőde - 3.1.1 a) Hőszigetelés: 14 cm Grafitos EPS homlokzati hőszigetelés, 20 cm EPS lapostető hőszigetelés - 3.1.1 a) Nyílászáró csere: 3 rétegű üvegezéssel ellátott, hőszigetelt nyílászárók beépítése - 3.1.1. d) Napelemes rendszer: 12,5 kW csatlakozási teljesítmény (Attila Tagóvodával együtt) 8800 Nagykanizsa Csokonai u. 5. hrsz.: 3076/2, Központi Rózsa Óvoda Kertvárosi Tagóvodája - 3.1.1 a) Hőszigetelés: 14 cm Grafitos EPS homlokzati hőszigetelés, 20 cm EPS lapostető hőszigetelés - 3.1.2.2 a) Fűtés korszerűsítés: Kondenzációs gázkazán beépítése, Termosztatikus szelepfejek felszerelése 8800 Nagykanizsa Csokonai u. 5. hrsz.: 3076/1, Nagykanizsai Egyesített Bölcsőde Napraforgó Bölcsőde - 3.1.1 b) Fűtés korszerűsítés: Kondenzációs gázkazán beépítése, Termosztatikus szelepfejek 8800 Nagykanizsa Teleki u. 19/B. hrsz.: 3110/8, Nagykanizsa Egyesített Szociális Intézmény: - 3.1.1. d) Napelemes rendszer: 45 kW csatlakozási teljesítmény 8800 Nagykanizsa Széchenyi tér 5. hrsz.: 2449/2, Hevesi Sándor Művelődési Központ: - 3.1.1. d) Napelemes rendszer: 50 kW csatlakozási teljesítmény 8800 Nagykanizsa Kálvin tér 5. hrsz.: 1204, Halis István Városi Könyvtár: - 3.1.1. d) Napelemes rendszer: 12,5 kW csatlakozási teljesítmény 8800 Nagykanizsa Corvin u. 2.hrsz.: 823/32, Központi Rózsa Óvoda Hétszínvirág Tagóvodája: - 3.1.1. d) Napelemes rendszer: 10 kW csatlakozási teljesítmény 8800 Nagykanizsa Kisfaludy Sándor u. 19. hrsz.: 2311, Nagykanizsai Egyesített Bölcsőde Belvárosi Bóbita Bölcsőde: - 3.1.1. d) Napelemes rendszer: 10 kW csatlakozási teljesítmény A fenti fejlesztésekkel az alábbi monitoring mutatók érhetőek el: - Az üvegházhatású gázok kibocsátás csökkenése (t/év): 452,851 - Energiahatékonysági fejlesztések által elért primer energiafelhasználás csökkenés (GJ/év): 5087,376 - Épületek éves elsődleges energia-fogyasztásának csökkenése (kWh/év): 1959150,000 - A megújuló-energiatermelés további kapacitása (kW): 257,856 - A megújuló energiaforrásból előállított energiamennyiség (GJ/év): 786,264 A projekt várhatóan 2020. szeptember 1-jén indul és 2022. február 1-jén fejeződik be. A projektgazda a megvalósítás során 8 mérföldkövet tűzött ki. A projekt keretein belül a Felhívás 3.1.1. g) pontjának megfelelően Nagykanizsa Megyei Jogú Város Önkormányzati Fenntartható Energia Akciótervének (SEAP) átdolgozása tervezett Fenntartható Energia és Klíma Akciótervvé (SECAP). A fejlesztésbe bevont épületek vonatkozásában projektarányos akadálymentesítés, beleértve az infokommunikációs akadálymentesítést tervezett, kivéve a csak napelemes fejlesztést tartalmazó megval.helyszíneket. (Hungarian)
0 references
By developing public buildings in the City of Nagykanizsa for energy purposes, it aims to promote an increase in energy efficiency and the use of renewable energy sources, both in order to achieve the transition to a low-carbon economy and as a means of demonstrating awareness-raising towards the population. The applicant intends to apply with the following development elements in the following locations: 8800 Nagykanizsa Rozgonyi Street: 1244, Batthyány Lajos High School, Main Building — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation, 26 cm rock wool suspended ceiling thermal insulation — 3.1.1 a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.2.2 (a) Heating upgrade: Installation of condensation gas boiler, Installation of thermostatic valve heads — 3.1.2.2 e) Lighting upgrade: Installation of LED light sources 8800 Nagykanizsa Rózsa u. 7. 3046/5, Central Rose Nursery — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.1 (d) Solar panel system: 15 kW connection power 8800 Nagykanizsa Rózsa u. 17/B. hrsz.: 3053/2, Central Rose Kindergarten Hevesi School — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.2.2 (a) Heating upgrade: Installation of 4 radiators — 3.1.2.2 (c) Installation of the heat pump: Installation of air-to-water heat pump — 3.1.1 (d) Solar panel system: 35 kW connection power 8800 Nagykanizsa Attila u. 7. hrsz.: 2986/1, Central Rose Kindergarten, Attila Member School — 3.1.1 a) Heat insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation? 3.1.1 (a) Opening closure replacement: Installation of insulated doors and windows with 3 layers of glazing? 3.1.1.(d) Solar panel system: 12.5 kW connection power (including the crèche) 8800 Nagykanizsa Attila u. 7. hrsz.: 2986/2, Nagykanizsa Unified Cradle House Bölcsőde — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.1 (a) Opening barrier replacement: Installation of insulated doors and windows with 3 layers of glazing — 3.1.1 (d) Solar panel system: 12.5 kW connection power (including Attila Membership) 8800 Nagykanizsa Csokonai u. 5. hrsz.: 3076/2, Central Rose Kindergarten Garden City School — 3.1.1 a) Thermal insulation: 14 cm graphite EPS facade thermal insulation, 20 cm EPS flat roof thermal insulation — 3.1.2.2 a) Heating upgrade: Installation of condensation gas boiler, Installation of thermostatic valve heads 8800 Nagykanizsa Csokonai u. 5. 3076/1, Nagykanizsa Unified Cradle of Napraforgó Bölcsőde — 3.1.1 (b) Heating modernisation: Installation of condensation gas boiler, Thermostatic valve heads 8800 Nagykanizsa Teleki u. 19/B. hrsz.: 3110/8, Nagykanizsa Consolidated Social Institution: — 3.1.1 (d) Solar panel system: 45 kW connection power 8800 Nagykanizsa Széchenyi tér 5. 2449/2, Sándor Hevesi Cultural Centre: — 3.1.1 (d) Solar panel system: 50 kW connection power 8800 Nagykanizsa Kálvin tér 5. Hr.: 1204, Halis István City Library: — 3.1.1 (d) Solar panel system: 12.5 kW connection power 8800 Nagykanizsa Corvin u. 2.hrsz.: 823/32, Central Rose Nursery School Seven Color Flowers Membership: — 3.1.1 (d) Solar panel system: 10 kW connection power 8800 Nagykanizsa Kisfaludy Sándor u. 19. hrsz.: 2311, Nagykanizsa unified Bóbita Bóbita Cradle: — 3.1.1 (d) Solar panel system: 10 kW connection power The following monitoring indicators are available with the above improvements: — Reduction of greenhouse gas emissions (t/year): 452,851 — Reduction of primary energy use achieved by energy efficiency improvements (GJ/year): 5087,376 — Reduction in annual primary energy consumption of buildings (kWh/year): 1959150,000 — Additional capacity for renewable energy generation (kW): 257,856 — Amount of energy from renewable sources (GJ/year): 786,264 The project is expected to start on 1 September 2020 and be completed on 1 February 2022. The project promoter set 8 milestones during the implementation. Within the framework of the project, in accordance with point 3.1.1(g) of the call, the transformation of the Municipal Sustainable Energy Action Plan (SEAP) of the Municipality of Nagykanizsa into a Sustainable Energy and Climate Action Plan (SECAP) is planned. For the buildings involved in the development, proportional accessibility to the project, including ICT accessibility, is planned, except for locations with solar-only development. (English)
9 February 2022
0 references
Nagykanizsa, Zala
0 references
Identifiers
TOP-6.5.1-19-NA1-2020-00001
0 references