Development of Zsáka’s rainwater drainage system Stage III 2020 (Q3949430): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
Further reduction of the risk of rainwater and inland water in the inner area of Zsáka Municipality Specific objectives: Improvement of the infrastructure conditions for rainwater drainage in the north of the settlement The rapid discharge of rainwater from the internal area in order to reduce damage events Detailed content of the project: Zsáka lies in the middle of an inland water-threatening area with a dense sewer network, and the Zsáka-Furta border canal which drains the rainwater from the inner area passes through the settlement. For economic and technical reasons, water reservoirs are not possible at the present pace, so the project focuses on the main problem, i.e. the rapid and efficient draining of significant water surpluses that appear periodically. As part of the project, canals and related artefacts are constructed and reconstructed in such a way that the drained inland water can leave the receiving channel free of damage. Zsáka intends to solve the drainage of the inland water in line with the previous phases, taking into account the principle of backward construction from the host, so the construction of the SPA part of the settlement is being carried out at this stage. The development of the central part of the settlement for the protection of rainwater during this phase III includes the infrastructural interventions of the following streets: 1) D-1 drainage channel (Bessenyei street), 110 m covered open channel is built, hosted by the Zsáka-Furta border channel. 2) D-2 drainage channel (Bezerédi street, Bessenyei street), 480 m canal is built, of which 425 m covered open channel, 55 m closed channel due to the proximity of the building and embankment, hosted by the Zsáka-Furta border canal. 3) This drainage channel (Goldany János Street), 340 m paved open channel is being built, hosted by the Zsáka-Furta border canal. 4) E-1 drainage channel (Goldany János street), 275 m covered open channel is built, hosted by the E drainage channel. 5) E-2 drainage channel (Máté János utca), 40 m covered open channel is being built, hosted by the Zsáka-Furta border canal. 6) F drainage channel (Jókai Mór street), 350 m covered open channel is built, hosted by the Zsáka-Furta border channel. 7) F-1 drainage channel (Jókai Mór street), 210 m covered open channel is built, receiving the F drainage channel. 8) F-1-1 drainage channel (Jókai Mór utca), 50 m covered open channel is built, hosted by the F-1 drainage channel.9) Main collection channel No. 8 in section 0+ 030-0+ 226. (Táncsics M. street), 196 m covered open channel is built, receiving the 8th main collector. As part of the project, a total of 2 051 m of paved sewers will be built (of which 1 996 m open, 55 m covered), 8 perimeters or 88 gateway or electric poles will be protected. The development of Stage III has a planning documentation with a permit for the establishment of water rights. Water rights permit No 6974/6/2013, which was extended under No 35900/8304-9/2015. The awareness-raising action planned in the framework of this project is linked to the management of water and the awareness of water as a value. Mandatory publicity and project management activities will be implemented. (English)
Property / summary: Further reduction of the risk of rainwater and inland water in the inner area of Zsáka Municipality Specific objectives: Improvement of the infrastructure conditions for rainwater drainage in the north of the settlement The rapid discharge of rainwater from the internal area in order to reduce damage events Detailed content of the project: Zsáka lies in the middle of an inland water-threatening area with a dense sewer network, and the Zsáka-Furta border canal which drains the rainwater from the inner area passes through the settlement. For economic and technical reasons, water reservoirs are not possible at the present pace, so the project focuses on the main problem, i.e. the rapid and efficient draining of significant water surpluses that appear periodically. As part of the project, canals and related artefacts are constructed and reconstructed in such a way that the drained inland water can leave the receiving channel free of damage. Zsáka intends to solve the drainage of the inland water in line with the previous phases, taking into account the principle of backward construction from the host, so the construction of the SPA part of the settlement is being carried out at this stage. The development of the central part of the settlement for the protection of rainwater during this phase III includes the infrastructural interventions of the following streets: 1) D-1 drainage channel (Bessenyei street), 110 m covered open channel is built, hosted by the Zsáka-Furta border channel. 2) D-2 drainage channel (Bezerédi street, Bessenyei street), 480 m canal is built, of which 425 m covered open channel, 55 m closed channel due to the proximity of the building and embankment, hosted by the Zsáka-Furta border canal. 3) This drainage channel (Goldany János Street), 340 m paved open channel is being built, hosted by the Zsáka-Furta border canal. 4) E-1 drainage channel (Goldany János street), 275 m covered open channel is built, hosted by the E drainage channel. 5) E-2 drainage channel (Máté János utca), 40 m covered open channel is being built, hosted by the Zsáka-Furta border canal. 6) F drainage channel (Jókai Mór street), 350 m covered open channel is built, hosted by the Zsáka-Furta border channel. 7) F-1 drainage channel (Jókai Mór street), 210 m covered open channel is built, receiving the F drainage channel. 8) F-1-1 drainage channel (Jókai Mór utca), 50 m covered open channel is built, hosted by the F-1 drainage channel.9) Main collection channel No. 8 in section 0+ 030-0+ 226. (Táncsics M. street), 196 m covered open channel is built, receiving the 8th main collector. As part of the project, a total of 2 051 m of paved sewers will be built (of which 1 996 m open, 55 m covered), 8 perimeters or 88 gateway or electric poles will be protected. The development of Stage III has a planning documentation with a permit for the establishment of water rights. Water rights permit No 6974/6/2013, which was extended under No 35900/8304-9/2015. The awareness-raising action planned in the framework of this project is linked to the management of water and the awareness of water as a value. Mandatory publicity and project management activities will be implemented. (English) / rank
 
Normal rank
Property / summary: Further reduction of the risk of rainwater and inland water in the inner area of Zsáka Municipality Specific objectives: Improvement of the infrastructure conditions for rainwater drainage in the north of the settlement The rapid discharge of rainwater from the internal area in order to reduce damage events Detailed content of the project: Zsáka lies in the middle of an inland water-threatening area with a dense sewer network, and the Zsáka-Furta border canal which drains the rainwater from the inner area passes through the settlement. For economic and technical reasons, water reservoirs are not possible at the present pace, so the project focuses on the main problem, i.e. the rapid and efficient draining of significant water surpluses that appear periodically. As part of the project, canals and related artefacts are constructed and reconstructed in such a way that the drained inland water can leave the receiving channel free of damage. Zsáka intends to solve the drainage of the inland water in line with the previous phases, taking into account the principle of backward construction from the host, so the construction of the SPA part of the settlement is being carried out at this stage. The development of the central part of the settlement for the protection of rainwater during this phase III includes the infrastructural interventions of the following streets: 1) D-1 drainage channel (Bessenyei street), 110 m covered open channel is built, hosted by the Zsáka-Furta border channel. 2) D-2 drainage channel (Bezerédi street, Bessenyei street), 480 m canal is built, of which 425 m covered open channel, 55 m closed channel due to the proximity of the building and embankment, hosted by the Zsáka-Furta border canal. 3) This drainage channel (Goldany János Street), 340 m paved open channel is being built, hosted by the Zsáka-Furta border canal. 4) E-1 drainage channel (Goldany János street), 275 m covered open channel is built, hosted by the E drainage channel. 5) E-2 drainage channel (Máté János utca), 40 m covered open channel is being built, hosted by the Zsáka-Furta border canal. 6) F drainage channel (Jókai Mór street), 350 m covered open channel is built, hosted by the Zsáka-Furta border channel. 7) F-1 drainage channel (Jókai Mór street), 210 m covered open channel is built, receiving the F drainage channel. 8) F-1-1 drainage channel (Jókai Mór utca), 50 m covered open channel is built, hosted by the F-1 drainage channel.9) Main collection channel No. 8 in section 0+ 030-0+ 226. (Táncsics M. street), 196 m covered open channel is built, receiving the 8th main collector. As part of the project, a total of 2 051 m of paved sewers will be built (of which 1 996 m open, 55 m covered), 8 perimeters or 88 gateway or electric poles will be protected. The development of Stage III has a planning documentation with a permit for the establishment of water rights. Water rights permit No 6974/6/2013, which was extended under No 35900/8304-9/2015. The awareness-raising action planned in the framework of this project is linked to the management of water and the awareness of water as a value. Mandatory publicity and project management activities will be implemented. (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:35, 9 February 2022

Project Q3949430 in Hungary
Language Label Description Also known as
English
Development of Zsáka’s rainwater drainage system Stage III 2020
Project Q3949430 in Hungary

    Statements

    0 references
    127,699,082 forint
    0 references
    353,114.78 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    387,868.311 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    141,887,868.889 forint
    0 references
    89.999994 percent
    0 references
    1 August 2020
    0 references
    31 October 2022
    0 references
    ZSÁKA NAGYKÖZSÉGI ÖNKORMÁNYZAT
    0 references
    0 references

    47°7'19.20"N, 21°24'2.88"E
    0 references
    Zsáka Nagyközség belterületén a csapadékvíz és belvíz veszélyeztetettség további csökkentése Specifikus célok: A település ÉK-i részén a csapadékvíz elvezetés infrastrukturális feltételeinek javítása A csapadékvizek belterületről történő mielőbbi elvezetése a káresemények csökkentése érdekében II. Projekt részletes tartalma: Zsáka egy belvízveszélyes, csatornahálózattal sűrűn ellátott terület közepén fekszik, és a belterületről a csapadékvizet levezető Zsáka-Furta határcsatorna a településen halad át. Víztározásra gazdasági és műszaki okokból jelen ütemben nincs lehetőség, így a projekt a fő problémára, azaz az időszakosan megjelenő jelentős víztöbblet gyors és hatékony elvezetésére koncentrál. A projekt keretében csatornák és kapcsolódó műtárgyak építése és rekonstrukciója történik úgy, hogy az elvezetett belvíz káresemény mentesen tudjon a befogadó csatornán eltávozni. Zsáka a belvíz elvezetését a már korábbi ütemekhez igazodóan kívánja megoldani, a befogadótól visszafelé történő kiépítés elvet is figyelembe véve, így jelen ütemben a település ÉK-i részének kiépítése történik. A település központi részének a jelen III. ütemben történő csapadékvíz-védelmi fejlesztése az alábbi utcák infrastrukturális beavatkozásait foglalja magában: 1) D-1 lecsapoló csatorna (Bessenyei utca), 110 m burkolt medrű nyílt csatorna kiépítése történik, befogadója a Zsáka-Furta határcsatorna. 2) D-2 lecsapoló csatorna (Bezerédi utca, Bessenyei utca), 480 m csatorna kiépítése történik, ebből 425 m burkolt medrű nyílt csatorna, 55 m zárt csatorna az épület és töltés közelsége miatt, befogadója a Zsáka-Furta határcsatorna. 3) E lecsapoló csatorna (Arany János utca), 340 m burkolt medrű nyílt csatorna kiépítése történik, befogadója a Zsáka-Furta határcsatorna. 4) E-1 lecsapoló csatorna (Arany János utca), 275 m burkolt medrű nyílt csatorna kiépítése történik, befogadója az E lecsapoló csatorna. 5) E-2 lecsapoló csatorna (Máté János utca), 40 m burkolt medrű nyílt csatorna kiépítése történik, befogadója a Zsáka-Furta határcsatorna. 6) F lecsapoló csatorna (Jókai Mór utca), 350 m burkolt medrű nyílt csatorna kiépítése történik, befogadója a Zsáka-Furta határcsatorna. 7) F-1 lecsapoló csatorna (Jókai Mór utca), 210 m burkolt medrű nyílt csatorna kiépítése történik, befogadója az F lecsapoló csatorna. 8) F-1-1 lecsapoló csatorna (Jókai Mór utca), 50 m burkolt medrű nyílt csatorna kiépítése történik, befogadója az F-1 lecsapoló csatorna.9) 8. sz. főgyűjtő csatorna 0+030-0+226. szelvényben (Táncsics M. utca), 196 m burkolt medrű nyílt csatorna kiépítése történik, befogadója a 8. sz. főgyűjtő. A projekt keretében kiépítésre kerül összesen 2051 m burkolt csatorna (ebből 1996 m nyílt, 55 m fedett), át- vagy kiépítésre kerül 8 db áteresz, illetve 88 db kapubejáró vagy villanyoszlop bevédés. A III. ütem fejlesztései vízjogi létesítési engedélyes tervdokumentációval rendelkeznek. A vízjogi létesítési engedély száma 6974/6/2013., amely 35900/8304-9/2015.Ált. számon meghosszabbításra került. Jelen projekt keretében tervezett szemléletformáló akció a vízzel való gazdálkodáshoz, a víz, mint érték tudatosításához kötődik. Megvalósul még kötelező nyilvánosság és projektmenedzsment tevékenység. (Hungarian)
    0 references
    Further reduction of the risk of rainwater and inland water in the inner area of Zsáka Municipality Specific objectives: Improvement of the infrastructure conditions for rainwater drainage in the north of the settlement The rapid discharge of rainwater from the internal area in order to reduce damage events Detailed content of the project: Zsáka lies in the middle of an inland water-threatening area with a dense sewer network, and the Zsáka-Furta border canal which drains the rainwater from the inner area passes through the settlement. For economic and technical reasons, water reservoirs are not possible at the present pace, so the project focuses on the main problem, i.e. the rapid and efficient draining of significant water surpluses that appear periodically. As part of the project, canals and related artefacts are constructed and reconstructed in such a way that the drained inland water can leave the receiving channel free of damage. Zsáka intends to solve the drainage of the inland water in line with the previous phases, taking into account the principle of backward construction from the host, so the construction of the SPA part of the settlement is being carried out at this stage. The development of the central part of the settlement for the protection of rainwater during this phase III includes the infrastructural interventions of the following streets: 1) D-1 drainage channel (Bessenyei street), 110 m covered open channel is built, hosted by the Zsáka-Furta border channel. 2) D-2 drainage channel (Bezerédi street, Bessenyei street), 480 m canal is built, of which 425 m covered open channel, 55 m closed channel due to the proximity of the building and embankment, hosted by the Zsáka-Furta border canal. 3) This drainage channel (Goldany János Street), 340 m paved open channel is being built, hosted by the Zsáka-Furta border canal. 4) E-1 drainage channel (Goldany János street), 275 m covered open channel is built, hosted by the E drainage channel. 5) E-2 drainage channel (Máté János utca), 40 m covered open channel is being built, hosted by the Zsáka-Furta border canal. 6) F drainage channel (Jókai Mór street), 350 m covered open channel is built, hosted by the Zsáka-Furta border channel. 7) F-1 drainage channel (Jókai Mór street), 210 m covered open channel is built, receiving the F drainage channel. 8) F-1-1 drainage channel (Jókai Mór utca), 50 m covered open channel is built, hosted by the F-1 drainage channel.9) Main collection channel No. 8 in section 0+ 030-0+ 226. (Táncsics M. street), 196 m covered open channel is built, receiving the 8th main collector. As part of the project, a total of 2 051 m of paved sewers will be built (of which 1 996 m open, 55 m covered), 8 perimeters or 88 gateway or electric poles will be protected. The development of Stage III has a planning documentation with a permit for the establishment of water rights. Water rights permit No 6974/6/2013, which was extended under No 35900/8304-9/2015. The awareness-raising action planned in the framework of this project is linked to the management of water and the awareness of water as a value. Mandatory publicity and project management activities will be implemented. (English)
    9 February 2022
    0 references
    Zsáka, Hajdú-Bihar
    0 references

    Identifiers

    TOP-2.1.3-16-HB1-2019-00003
    0 references