Energy modernisation of the City Hall of Kunszentmárton (Q3950371): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
The project costs will be charged from the indicative allocation for the districts of Jászapáti, Karcagi, Kunhegyesi, Kunszentmárton, Törökszentmiklós. The Project fulfils the conditions set out in point 3.2 of the call. The project fulfils the conditions set out in point 4.4 of the call for proposals, and the area-specific assessment criteria are met. 2. Description of the purpose and justification of the project (max. 2000 characters) 2.1. The problem to be solved, the need for development. (Why is the development needed? Fit to the goals of the TOP, professional justification, demand and justification.) In the present project, Kunszentmárton City Hall (Republic Square 1.) Hrv. 2039.) the energy renovation of its building is under construction. The aim of the project is to modernise the City Hall in energy. The state of the building is used up, its energy system is outdated, the significant maintenance costs of the energy use are outstanding, therefore energy modernisation is necessary. During the implementation of the project, the following activities should be carried out: — partial façade thermal insulation, — thermal insulation of attic floors, — replacement of facade doors, In the framework of the project submitted for tender TOP 3.2.1, the Municipality decided to rationalise the energy of the Office’s building. The aim of the project is to partially insulate the building according to state-of-the-art standards and replace its doors and windows. a) The degree of integration of the implemented development with the current Jász-Nagykun-Szolnok County Regional Development Programme: JNSZ County Assembly 75/2014. (VIII.29.) adopted the Jász-Nagykun-Szolnok County Regional Development Programme, in which the topic of the development on page 35 is described in point 4.1: Creating the conditions for a green economy, including 4.1.1 Developments for renewable and alternative energy production. In the framework of the present project, the thermal insulation of the facade and slab of the building and the replacement of the facade doors will be implemented. This development fully complies with the objectives of the Territorial Development Programme. B) When was the last time the energy modernisation of the property affected by the development took place? As the photo documentation attached as an annex to the Project Plan shows the complete energy modernisation of the building involved in the development (which was earlier than 10 years before the submission of the application), there has been no partial development, which did not affect the factors causing the largest energy deficit of the building, the thermal insulation of the building and the area of its outdated windows. C) The project is the Government Decree on the classification of the beneficiary districts or 105/2015. (IV. 23.) According to the Government Decree, it is implemented in districts that are to be developed or developed by a complex programme: Kunszentmárton is located in the district of Kunszentmárton. The gait is 290/2014. (XI. 26) Government Decree No 26/2001 on the classification of the beneficiary districts has been classified in the district to be developed in accordance with the Act. D) The amount of energy savings achieved as a result of the development compared to the average over the last 3 years. Energy consumption is reduced from the current 740.97 GJ to 382,28 GJ, and savings are 358,68 GJ e) Whether the planned development is related to the production of the energy carrier, other live-labour intensive local development linked to the processing of the energy carrier is not linked to the production of the energy carrier 2.2. The long-term direct and indirect objectives and expected results of the project. The long-term goals set in Kunszentmárton City are on the one hand to ensure the security of energy supply of the building under development and to increase employment through cost savings and to promote green awareness through the use of alternative energy sources and energy-efficient solutions for the catching up of the area. On the other hand, developing a sustainable development trend, especially in the economic and social sphere, through energy renovation of the building and the use of renewable energy technology. The development will concern 1 institution under the current investment framework. The project elements and their performance are currently identified to meet specific needs. The impact of the project is to improve employment in qualitative and quantitative terms, to introduce high energy efficiency processes in the micro-region, and to improve demographic and migration indicators. The green economy, green-collar jobs, the social level of green thinking are rising, living standards and environmental quality are constantly improving. Success, experience can easily spread to other county and regional areas, which are transferred due to lack of space to the additional data contained in the Project Plan (English)
Property / summary: The project costs will be charged from the indicative allocation for the districts of Jászapáti, Karcagi, Kunhegyesi, Kunszentmárton, Törökszentmiklós. The Project fulfils the conditions set out in point 3.2 of the call. The project fulfils the conditions set out in point 4.4 of the call for proposals, and the area-specific assessment criteria are met. 2. Description of the purpose and justification of the project (max. 2000 characters) 2.1. The problem to be solved, the need for development. (Why is the development needed? Fit to the goals of the TOP, professional justification, demand and justification.) In the present project, Kunszentmárton City Hall (Republic Square 1.) Hrv. 2039.) the energy renovation of its building is under construction. The aim of the project is to modernise the City Hall in energy. The state of the building is used up, its energy system is outdated, the significant maintenance costs of the energy use are outstanding, therefore energy modernisation is necessary. During the implementation of the project, the following activities should be carried out: — partial façade thermal insulation, — thermal insulation of attic floors, — replacement of facade doors, In the framework of the project submitted for tender TOP 3.2.1, the Municipality decided to rationalise the energy of the Office’s building. The aim of the project is to partially insulate the building according to state-of-the-art standards and replace its doors and windows. a) The degree of integration of the implemented development with the current Jász-Nagykun-Szolnok County Regional Development Programme: JNSZ County Assembly 75/2014. (VIII.29.) adopted the Jász-Nagykun-Szolnok County Regional Development Programme, in which the topic of the development on page 35 is described in point 4.1: Creating the conditions for a green economy, including 4.1.1 Developments for renewable and alternative energy production. In the framework of the present project, the thermal insulation of the facade and slab of the building and the replacement of the facade doors will be implemented. This development fully complies with the objectives of the Territorial Development Programme. B) When was the last time the energy modernisation of the property affected by the development took place? As the photo documentation attached as an annex to the Project Plan shows the complete energy modernisation of the building involved in the development (which was earlier than 10 years before the submission of the application), there has been no partial development, which did not affect the factors causing the largest energy deficit of the building, the thermal insulation of the building and the area of its outdated windows. C) The project is the Government Decree on the classification of the beneficiary districts or 105/2015. (IV. 23.) According to the Government Decree, it is implemented in districts that are to be developed or developed by a complex programme: Kunszentmárton is located in the district of Kunszentmárton. The gait is 290/2014. (XI. 26) Government Decree No 26/2001 on the classification of the beneficiary districts has been classified in the district to be developed in accordance with the Act. D) The amount of energy savings achieved as a result of the development compared to the average over the last 3 years. Energy consumption is reduced from the current 740.97 GJ to 382,28 GJ, and savings are 358,68 GJ e) Whether the planned development is related to the production of the energy carrier, other live-labour intensive local development linked to the processing of the energy carrier is not linked to the production of the energy carrier 2.2. The long-term direct and indirect objectives and expected results of the project. The long-term goals set in Kunszentmárton City are on the one hand to ensure the security of energy supply of the building under development and to increase employment through cost savings and to promote green awareness through the use of alternative energy sources and energy-efficient solutions for the catching up of the area. On the other hand, developing a sustainable development trend, especially in the economic and social sphere, through energy renovation of the building and the use of renewable energy technology. The development will concern 1 institution under the current investment framework. The project elements and their performance are currently identified to meet specific needs. The impact of the project is to improve employment in qualitative and quantitative terms, to introduce high energy efficiency processes in the micro-region, and to improve demographic and migration indicators. The green economy, green-collar jobs, the social level of green thinking are rising, living standards and environmental quality are constantly improving. Success, experience can easily spread to other county and regional areas, which are transferred due to lack of space to the additional data contained in the Project Plan (English) / rank
 
Normal rank
Property / summary: The project costs will be charged from the indicative allocation for the districts of Jászapáti, Karcagi, Kunhegyesi, Kunszentmárton, Törökszentmiklós. The Project fulfils the conditions set out in point 3.2 of the call. The project fulfils the conditions set out in point 4.4 of the call for proposals, and the area-specific assessment criteria are met. 2. Description of the purpose and justification of the project (max. 2000 characters) 2.1. The problem to be solved, the need for development. (Why is the development needed? Fit to the goals of the TOP, professional justification, demand and justification.) In the present project, Kunszentmárton City Hall (Republic Square 1.) Hrv. 2039.) the energy renovation of its building is under construction. The aim of the project is to modernise the City Hall in energy. The state of the building is used up, its energy system is outdated, the significant maintenance costs of the energy use are outstanding, therefore energy modernisation is necessary. During the implementation of the project, the following activities should be carried out: — partial façade thermal insulation, — thermal insulation of attic floors, — replacement of facade doors, In the framework of the project submitted for tender TOP 3.2.1, the Municipality decided to rationalise the energy of the Office’s building. The aim of the project is to partially insulate the building according to state-of-the-art standards and replace its doors and windows. a) The degree of integration of the implemented development with the current Jász-Nagykun-Szolnok County Regional Development Programme: JNSZ County Assembly 75/2014. (VIII.29.) adopted the Jász-Nagykun-Szolnok County Regional Development Programme, in which the topic of the development on page 35 is described in point 4.1: Creating the conditions for a green economy, including 4.1.1 Developments for renewable and alternative energy production. In the framework of the present project, the thermal insulation of the facade and slab of the building and the replacement of the facade doors will be implemented. This development fully complies with the objectives of the Territorial Development Programme. B) When was the last time the energy modernisation of the property affected by the development took place? As the photo documentation attached as an annex to the Project Plan shows the complete energy modernisation of the building involved in the development (which was earlier than 10 years before the submission of the application), there has been no partial development, which did not affect the factors causing the largest energy deficit of the building, the thermal insulation of the building and the area of its outdated windows. C) The project is the Government Decree on the classification of the beneficiary districts or 105/2015. (IV. 23.) According to the Government Decree, it is implemented in districts that are to be developed or developed by a complex programme: Kunszentmárton is located in the district of Kunszentmárton. The gait is 290/2014. (XI. 26) Government Decree No 26/2001 on the classification of the beneficiary districts has been classified in the district to be developed in accordance with the Act. D) The amount of energy savings achieved as a result of the development compared to the average over the last 3 years. Energy consumption is reduced from the current 740.97 GJ to 382,28 GJ, and savings are 358,68 GJ e) Whether the planned development is related to the production of the energy carrier, other live-labour intensive local development linked to the processing of the energy carrier is not linked to the production of the energy carrier 2.2. The long-term direct and indirect objectives and expected results of the project. The long-term goals set in Kunszentmárton City are on the one hand to ensure the security of energy supply of the building under development and to increase employment through cost savings and to promote green awareness through the use of alternative energy sources and energy-efficient solutions for the catching up of the area. On the other hand, developing a sustainable development trend, especially in the economic and social sphere, through energy renovation of the building and the use of renewable energy technology. The development will concern 1 institution under the current investment framework. The project elements and their performance are currently identified to meet specific needs. The impact of the project is to improve employment in qualitative and quantitative terms, to introduce high energy efficiency processes in the micro-region, and to improve demographic and migration indicators. The green economy, green-collar jobs, the social level of green thinking are rising, living standards and environmental quality are constantly improving. Success, experience can easily spread to other county and regional areas, which are transferred due to lack of space to the additional data contained in the Project Plan (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:07, 9 February 2022

Project Q3950371 in Hungary
Language Label Description Also known as
English
Energy modernisation of the City Hall of Kunszentmárton
Project Q3950371 in Hungary

    Statements

    0 references
    38,835,720 forint
    0 references
    107,388.92 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    124,896.845 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    45,689,082.353 forint
    0 references
    84.999995 percent
    0 references
    1 September 2017
    0 references
    31 March 2019
    0 references
    KUNSZENTMÁRTON VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    46°50'45.20"N, 20°17'2.44"E
    0 references
    A Projekt költségeit a Jászapáti, Karcagi, Kunhegyesi, Kunszentmártoni, Törökszentmiklósi járások számára elkülönített indikatív keretösszeg terhére kívánjuk elszámolni. A Projekt teljesíti a felhívás 3.2 pontjában előírt feltételeket. A Projekt teljesíti a felhívás 4.4 tartalmi értékelési szempontok pontjában előírt feltételeket , továbbá teljesülnek a terület-specifikus értékelési szempontok. 2. A projekt céljának, indokoltságának bemutatása (max. 2000 karakter) 2.1. A megoldandó probléma, a fejlesztési igény bemutatása. (Miért van szükség a fejlesztésre? Illeszkedés a TOP céljaihoz, szakmai indokoltság, igény, megalapozottság.) Jelen projektben a Kunszentmárton Városháza (Köztársaság tér 1. Hrsz. 2039.) épületének energetikai korszerűsítése épül. A projekt célja a Városháza energetikai korszerűsítése. Az épület állapota elhasznált, energetikai rendszere elavult, az energiafelhasználás jelentős, fenntartási költségei kimagaslóak, ezért szükséges az energetikai korszerűsítés. A projekt megvalósítása során az alábbi tevékenységek elvégzése indokolt: - részleges homlokzati hőszigetelése, - padlásfödém hőszigetelése, - homlokzati nyílászárók cseréje, A TOP 3.2.1. pályázati kiírásra benyújtott projekt keretében az Önkormányzat a Hivatal épületének energetikai racionalizálásáról döntött. A projekt célja, az épület korszerű szabványoknak megfelelő részleges hőszigetelése és nyílászáróinak cseréje. a) A megvalósuló fejlesztés illeszkedésének mértéke a hatályos Jász-Nagykun-Szolnok Megyei Területfejlesztési Programhoz: JNSZ Megyei Közgyűlés 75/2014. (VIII.29.) számú határozatával elfogadta a Jász-Nagykun-Szolnok Megyei Területfejlesztési Programot, melyben a 35. oldalon jelen fejlesztés témaköre megnevezésre kerül a 4.1. pontban: Zöldgazdaság feltételeinek megteremtése, azon belül a 4.1.1 Megújuló és alternatív energiatermelést szolgáló fejlesztések. Jelen projekt keretében megvalósításra kerül az épület homlokzati és födém hőszigetelése, valamint a homlokzati nyílászárók cseréje valósul meg. A Területfejlesztési Program céljainak jelen fejlesztés teljes mértékben megfelel. b) A fejlesztéssel érintett ingatlan energetikai korszerűsítésére mikor került utoljára sor? Mint a Projektterv mellékleteként csatolt fotódokumentáció is mutatja a fejlesztésbe bevont épület teljes körű energetikai korszerűsítésére építése óta (mely korábbi, mint a pályázat benyújtását megelőző 10 év) nem került sor, csupán részleges fejlesztés valósult meg, mely nem érintette az épület legnagyobb energetikai deficitjét okozó faktorokat, az épület hőszigetelését és elavult nyílászáróinak területét. c) A projekt a kedvezményezett járások besorolásáról szóló Kormányrendelet, vagy a kedvezményezett települések besorolásáról szóló 105/2015. (IV. 23.) Kormányrendelet értelmében kedvezményezett, fejlesztendő vagy komplex programmal fejlesztendő járásban valósul meg: Kunszentmárton a Kunszentmártoni járásban található. A járás a 290/2014. (XI. 26.) Korm. rendelet a kedvezményezett járások besorolásáról törvény értelmében a Fejlesztendő járásba sorolt. d) A fejlesztés eredményeként elért energiamegtakarítás mértéke az elmúlt 3 év átlagához viszonyítva Az energia megtakarítás mintegy fele a kiindulási értéknek. A jelenlegi 740,97 GJ-ról 382,28 GJ-ra csökken az energiafelhasználás, a megtakarítás 358,68 GJ e) A tervezett fejlesztéshez kapcsolódik-e az energiahordozó előállításához, feldolgozásához köthető élőmunkaigényes egyéb helyi fejlesztés Jelen fejlesztés tekintetében nem köthető élőmunkaigényes fejlesztés az energiahordozó előállításához 2.2. A projekt hosszú távú közvetlen és közvetett céljai és elvárt eredményei. A kitűzött hosszú távú célok Kunszentmárton Városban egyrészt a fejlesztés tárgyát képező ingatlan/intézmény épületének energiaellátás biztonságának megteremtése és a költségmegtakarítások révén a foglalkoztatottságának növelése, valamint zöld szemléletformálásának elősegítése alternatív energiaforrások és energiahatékony megoldások alkalmazásával a térség felzárkóztatásáért. Másrészt egy fenntartható fejlődési tendencia kialakítása elsősorban a gazdasági és társadalmi szférában, az épület energetikai korszerűsítése illetve a megújuló energiaforrást hasznosító technológia alkalmazása révén. A fejlesztés jelen beruházási keretek között 1 intézményt fog érinteni. A projektelemek és azok teljesítményei jelenleg adott igények kielégítésére kerültek megállapításra. A projekt hatásaként javul a foglalkoztatottság minőségi és mennyiségi szempontból, magas energia hatékonyságú eljárások honosodnak meg a kistérségben, a demográfiai és vándorlási mutatók javulnak. A zöld gazdaság, a zöldgalléros munkahelyek, a zöld gondolkodás társadalmi szintje megemelkedik, tartósan feljavul az életszínvonal és a környezetminősége. A siker, a tapasztalatok könnyen elterjednek más megyei és regionális területekre, amelyek át Helyhiány miatt a további adatokat a Projektterv tartalmazza (Hungarian)
    0 references
    The project costs will be charged from the indicative allocation for the districts of Jászapáti, Karcagi, Kunhegyesi, Kunszentmárton, Törökszentmiklós. The Project fulfils the conditions set out in point 3.2 of the call. The project fulfils the conditions set out in point 4.4 of the call for proposals, and the area-specific assessment criteria are met. 2. Description of the purpose and justification of the project (max. 2000 characters) 2.1. The problem to be solved, the need for development. (Why is the development needed? Fit to the goals of the TOP, professional justification, demand and justification.) In the present project, Kunszentmárton City Hall (Republic Square 1.) Hrv. 2039.) the energy renovation of its building is under construction. The aim of the project is to modernise the City Hall in energy. The state of the building is used up, its energy system is outdated, the significant maintenance costs of the energy use are outstanding, therefore energy modernisation is necessary. During the implementation of the project, the following activities should be carried out: — partial façade thermal insulation, — thermal insulation of attic floors, — replacement of facade doors, In the framework of the project submitted for tender TOP 3.2.1, the Municipality decided to rationalise the energy of the Office’s building. The aim of the project is to partially insulate the building according to state-of-the-art standards and replace its doors and windows. a) The degree of integration of the implemented development with the current Jász-Nagykun-Szolnok County Regional Development Programme: JNSZ County Assembly 75/2014. (VIII.29.) adopted the Jász-Nagykun-Szolnok County Regional Development Programme, in which the topic of the development on page 35 is described in point 4.1: Creating the conditions for a green economy, including 4.1.1 Developments for renewable and alternative energy production. In the framework of the present project, the thermal insulation of the facade and slab of the building and the replacement of the facade doors will be implemented. This development fully complies with the objectives of the Territorial Development Programme. B) When was the last time the energy modernisation of the property affected by the development took place? As the photo documentation attached as an annex to the Project Plan shows the complete energy modernisation of the building involved in the development (which was earlier than 10 years before the submission of the application), there has been no partial development, which did not affect the factors causing the largest energy deficit of the building, the thermal insulation of the building and the area of its outdated windows. C) The project is the Government Decree on the classification of the beneficiary districts or 105/2015. (IV. 23.) According to the Government Decree, it is implemented in districts that are to be developed or developed by a complex programme: Kunszentmárton is located in the district of Kunszentmárton. The gait is 290/2014. (XI. 26) Government Decree No 26/2001 on the classification of the beneficiary districts has been classified in the district to be developed in accordance with the Act. D) The amount of energy savings achieved as a result of the development compared to the average over the last 3 years. Energy consumption is reduced from the current 740.97 GJ to 382,28 GJ, and savings are 358,68 GJ e) Whether the planned development is related to the production of the energy carrier, other live-labour intensive local development linked to the processing of the energy carrier is not linked to the production of the energy carrier 2.2. The long-term direct and indirect objectives and expected results of the project. The long-term goals set in Kunszentmárton City are on the one hand to ensure the security of energy supply of the building under development and to increase employment through cost savings and to promote green awareness through the use of alternative energy sources and energy-efficient solutions for the catching up of the area. On the other hand, developing a sustainable development trend, especially in the economic and social sphere, through energy renovation of the building and the use of renewable energy technology. The development will concern 1 institution under the current investment framework. The project elements and their performance are currently identified to meet specific needs. The impact of the project is to improve employment in qualitative and quantitative terms, to introduce high energy efficiency processes in the micro-region, and to improve demographic and migration indicators. The green economy, green-collar jobs, the social level of green thinking are rising, living standards and environmental quality are constantly improving. Success, experience can easily spread to other county and regional areas, which are transferred due to lack of space to the additional data contained in the Project Plan (English)
    9 February 2022
    0 references
    Kunszentmárton, Jász-Nagykun-Szolnok
    0 references

    Identifiers

    TOP-3.2.1-15-JN1-2016-00089
    0 references