Energy renovation of the building of the Mayor’s Office of Sarkadi. (Q3950984): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
The exterior facade of the building shall be insulated. External doors and windows shall be replaced by doors and windows in accordance with the applicable thermal standards. During the replacement of doors and windows, the necessary additional work shall also be carried out. Due to thermal insulation, tin structures need to be rebuilt. Internal damaged surfaces due to the replacement of doors and windows need to be repaired and painting works carried out. Thermal insulation of the attic ceiling according to standard shall be solved with a thermal insulation of mineral wool. The solar panel system is placed on the D-NY roof surface, however, according to the static opinion, the roof structure reinforcement needs to be replaced in order to securely position the solar panels. A complete refurbishment of the power grid is necessary, as old lines and luminaires cannot ensure safe compliance with existing specifications. The car parks required by the OTÉK for operation are provided in the car parks in front and next to the building, including its accessibility. Within the framework of the project, we ensure the realisation of physical and information-communication accessibility. (English) | |||||||||||||||
Property / summary: The exterior facade of the building shall be insulated. External doors and windows shall be replaced by doors and windows in accordance with the applicable thermal standards. During the replacement of doors and windows, the necessary additional work shall also be carried out. Due to thermal insulation, tin structures need to be rebuilt. Internal damaged surfaces due to the replacement of doors and windows need to be repaired and painting works carried out. Thermal insulation of the attic ceiling according to standard shall be solved with a thermal insulation of mineral wool. The solar panel system is placed on the D-NY roof surface, however, according to the static opinion, the roof structure reinforcement needs to be replaced in order to securely position the solar panels. A complete refurbishment of the power grid is necessary, as old lines and luminaires cannot ensure safe compliance with existing specifications. The car parks required by the OTÉK for operation are provided in the car parks in front and next to the building, including its accessibility. Within the framework of the project, we ensure the realisation of physical and information-communication accessibility. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The exterior facade of the building shall be insulated. External doors and windows shall be replaced by doors and windows in accordance with the applicable thermal standards. During the replacement of doors and windows, the necessary additional work shall also be carried out. Due to thermal insulation, tin structures need to be rebuilt. Internal damaged surfaces due to the replacement of doors and windows need to be repaired and painting works carried out. Thermal insulation of the attic ceiling according to standard shall be solved with a thermal insulation of mineral wool. The solar panel system is placed on the D-NY roof surface, however, according to the static opinion, the roof structure reinforcement needs to be replaced in order to securely position the solar panels. A complete refurbishment of the power grid is necessary, as old lines and luminaires cannot ensure safe compliance with existing specifications. The car parks required by the OTÉK for operation are provided in the car parks in front and next to the building, including its accessibility. Within the framework of the project, we ensure the realisation of physical and information-communication accessibility. (English) / qualifier | |||||||||||||||
point in time: 9 February 2022
|
Revision as of 12:06, 9 February 2022
Project Q3950984 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of the building of the Mayor’s Office of Sarkadi. |
Project Q3950984 in Hungary |
Statements
98,003,803 forint
0 references
315,183.182 Euro
0.0027336256 Euro
15 December 2021
0 references
115,298,591.765 forint
0 references
84.999994 percent
0 references
1 February 2018
0 references
30 November 2019
0 references
SARKAD VÁROS ÖNKORMÁNYZATA
0 references
Az épület külső homlokzatát hőszigetelni kell. A külső nyílászáró szerkezeteket az érvényben lévő hőtechnikai szabványnak megfelelő nyílászárókra kell cserélni. A nyílászáró csere során a szükséges kiegészítő munkálatokat is el kell végezni. A hőszigetelés miatt az épületbádogos szerkezeteket újra kell építeni. A nyílászáró csere miatti belső rongálódott felületeket javítani szükséges és a festési munkálatokat el kell végezni. A padlásfödém szabvány szerinti hőszigetelését ásványgyapot hőszigetelővel meg kell oldani. A napelem rendszer a D-NY-i tetőfelületre kerül, azonban a statikai szakvélemény szerint a tetőszerkezet megerősítése tetőhéjazat cseréje szükséges, hogy biztonságosan el lehessen helyezni a napelemeket. Az elektromos hálózat teljes felújítása szükséges, mivel a régi vezetékek és világítótestek nem tudják biztosítani a biztonságos a rendelkező előírásoknak való megfelelést. A működéshez szükséges OTÉK által előírt parkolók az épület előtti és melletti parkolókban biztosítottak, beleértve az akadálymentes kialakítását is. A projekt keretén belül biztosítjuk a fizikai és infó-kommunikációs akadálymentesítés megvalósulását. (Hungarian)
0 references
The exterior facade of the building shall be insulated. External doors and windows shall be replaced by doors and windows in accordance with the applicable thermal standards. During the replacement of doors and windows, the necessary additional work shall also be carried out. Due to thermal insulation, tin structures need to be rebuilt. Internal damaged surfaces due to the replacement of doors and windows need to be repaired and painting works carried out. Thermal insulation of the attic ceiling according to standard shall be solved with a thermal insulation of mineral wool. The solar panel system is placed on the D-NY roof surface, however, according to the static opinion, the roof structure reinforcement needs to be replaced in order to securely position the solar panels. A complete refurbishment of the power grid is necessary, as old lines and luminaires cannot ensure safe compliance with existing specifications. The car parks required by the OTÉK for operation are provided in the car parks in front and next to the building, including its accessibility. Within the framework of the project, we ensure the realisation of physical and information-communication accessibility. (English)
9 February 2022
0 references
Sarkad, Békés
0 references
Identifiers
TOP-3.2.1-16-BS1-2017-00020
0 references