Property / summary
 
the purpose of the project is the energy renovation of the Mayor’s Office of the Municipality of Borsodbóta (b)Programmed self-eligible activities: — Building owned by local government is being built in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for Transport and Rural Development. — Replacement of fossil fuel-based heat generating equipment: replacing the existing boiler with a condensing boiler is not self-eligible, mandatory activities — accessibility: project-proportional accessibility (with the help of previous developments, access to accessible toilets is already ensured for customer traffic, the building is protected locally) — asbestos removal: not relevant — Providing publicity: based on Beneficiary’s Information Obligations, ‘Arculati Manual’ — elaboration of training materials and training: the provision of training by an energy expert will be a prerequisite for the technical handover-take-over. — the preservation of locally protected values will be taken into account during the project. C) fulfilling the conditions set out in point 3.2 of the call 1) we comply with the environmental and equal opportunities legislation applicable to the project, we preserve the protected natural and cultural values in the area covered by the project, 2) The Municipality expresses a sense of opportunity: it does not mediate segregation, reduces existing prejudices for groups. 3) Building forming an independent energy system 4) The project is based on an energy-centric survey and calculation 5) There is no foreseeable climate risk 6) Office institution performing administrative function 7) Proportionalisation is not required 8) The planning values comply with the technical-technical regulations and the relevant requirements of the call, the energy certificate showing the starting state 9) is not relevant 10) 176/2008 (VI.30.) Government Decree 11) non-complex project 12) building energy screening is not required 13) No modernisation 14) if necessary, the SZÉS5 or equivalent expert 15) value inventory will be prepared 16-18) in the final construction documentation the above questions will be specified in detail 19-23) see above 24) the project plan will be attached 25) it is met that -4 %<BMR<+ 4 % 26) the technical inspector costs are planned among the eligible costs of the project 28) the project will absolutely reduce national GHG emissions 29) the condition is met 30) the energy certificate will be prepared even after implementation. 31) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 32) invertren measurement achievable 33) weather tracking regulations will be included 34) weekly time programming will be ensured 35) connection to the system will be possible 36-38) the conditions will be met 39-41) the project is in line with the county SEAP objectives, contains at least A+ category heating equipment, lighting modernisation is not relevant. 42-53) the technical content contained in the investment corresponds to these points of the call. 54-64) non-relevant47) non-relevant d) fulfilment of the content assessment criteria of the call based on the project data sheet and it has been shown in the project plan that the project complies with the content aspects e) area-specific assessment criteria 1.1.) alignment with the ITP priorities through the following measures 1.2, 2, 3.2, 4.1 and 5.2 1.2) does not reach 10 % 2.1.) Yes 2.2.) Yes 3.1.) 1 public building 3.2.) Yes 4.1.) The building was previously renovated and accessible from an AEMOP source, improvement of this development 4.2.) the decrease exceeds 10 % (expected to cause a decrease of more than 50 %) 5.) non-technical-professional results: Describe the technical/professional content, results and units of measurement planned by the project by specifying the most important parameters. Please provide the name, description, non-quantifiable and other characteristics of the technical/professional result to be achieved. The project will achieve fossil energy savings of 231.15 GJ/year through the building energy development, and it is expected that 2 750 kWh/year will be produced by the solar system for own use. The project consists of 18 cm thick 279,3nm facade insulation and 357,3nm floor insulation, as well as 44,6 sqm external window, 8.9 nm door surface will be replaced, 12 solar panel systems with 260Wp capacity will be installed and 24 kW condensing boiler + 4 radiators will be installed in the existing heating system. (English)
Property / summary: the purpose of the project is the energy renovation of the Mayor’s Office of the Municipality of Borsodbóta (b)Programmed self-eligible activities: — Building owned by local government is being built in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for Transport and Rural Development. — Replacement of fossil fuel-based heat generating equipment: replacing the existing boiler with a condensing boiler is not self-eligible, mandatory activities — accessibility: project-proportional accessibility (with the help of previous developments, access to accessible toilets is already ensured for customer traffic, the building is protected locally) — asbestos removal: not relevant — Providing publicity: based on Beneficiary’s Information Obligations, ‘Arculati Manual’ — elaboration of training materials and training: the provision of training by an energy expert will be a prerequisite for the technical handover-take-over. — the preservation of locally protected values will be taken into account during the project. C) fulfilling the conditions set out in point 3.2 of the call 1) we comply with the environmental and equal opportunities legislation applicable to the project, we preserve the protected natural and cultural values in the area covered by the project, 2) The Municipality expresses a sense of opportunity: it does not mediate segregation, reduces existing prejudices for groups. 3) Building forming an independent energy system 4) The project is based on an energy-centric survey and calculation 5) There is no foreseeable climate risk 6) Office institution performing administrative function 7) Proportionalisation is not required 8) The planning values comply with the technical-technical regulations and the relevant requirements of the call, the energy certificate showing the starting state 9) is not relevant 10) 176/2008 (VI.30.) Government Decree 11) non-complex project 12) building energy screening is not required 13) No modernisation 14) if necessary, the SZÉS5 or equivalent expert 15) value inventory will be prepared 16-18) in the final construction documentation the above questions will be specified in detail 19-23) see above 24) the project plan will be attached 25) it is met that -4 %<BMR<+ 4 % 26) the technical inspector costs are planned among the eligible costs of the project 28) the project will absolutely reduce national GHG emissions 29) the condition is met 30) the energy certificate will be prepared even after implementation. 31) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 32) invertren measurement achievable 33) weather tracking regulations will be included 34) weekly time programming will be ensured 35) connection to the system will be possible 36-38) the conditions will be met 39-41) the project is in line with the county SEAP objectives, contains at least A+ category heating equipment, lighting modernisation is not relevant. 42-53) the technical content contained in the investment corresponds to these points of the call. 54-64) non-relevant47) non-relevant d) fulfilment of the content assessment criteria of the call based on the project data sheet and it has been shown in the project plan that the project complies with the content aspects e) area-specific assessment criteria 1.1.) alignment with the ITP priorities through the following measures 1.2, 2, 3.2, 4.1 and 5.2 1.2) does not reach 10 % 2.1.) Yes 2.2.) Yes 3.1.) 1 public building 3.2.) Yes 4.1.) The building was previously renovated and accessible from an AEMOP source, improvement of this development 4.2.) the decrease exceeds 10 % (expected to cause a decrease of more than 50 %) 5.) non-technical-professional results: Describe the technical/professional content, results and units of measurement planned by the project by specifying the most important parameters. Please provide the name, description, non-quantifiable and other characteristics of the technical/professional result to be achieved. The project will achieve fossil energy savings of 231.15 GJ/year through the building energy development, and it is expected that 2 750 kWh/year will be produced by the solar system for own use. The project consists of 18 cm thick 279,3nm facade insulation and 357,3nm floor insulation, as well as 44,6 sqm external window, 8.9 nm door surface will be replaced, 12 solar panel systems with 260Wp capacity will be installed and 24 kW condensing boiler + 4 radiators will be installed in the existing heating system. (English) / rank
 
Normal rank
Property / summary: the purpose of the project is the energy renovation of the Mayor’s Office of the Municipality of Borsodbóta (b)Programmed self-eligible activities: — Building owned by local government is being built in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for Transport and Rural Development. — Replacement of fossil fuel-based heat generating equipment: replacing the existing boiler with a condensing boiler is not self-eligible, mandatory activities — accessibility: project-proportional accessibility (with the help of previous developments, access to accessible toilets is already ensured for customer traffic, the building is protected locally) — asbestos removal: not relevant — Providing publicity: based on Beneficiary’s Information Obligations, ‘Arculati Manual’ — elaboration of training materials and training: the provision of training by an energy expert will be a prerequisite for the technical handover-take-over. — the preservation of locally protected values will be taken into account during the project. C) fulfilling the conditions set out in point 3.2 of the call 1) we comply with the environmental and equal opportunities legislation applicable to the project, we preserve the protected natural and cultural values in the area covered by the project, 2) The Municipality expresses a sense of opportunity: it does not mediate segregation, reduces existing prejudices for groups. 3) Building forming an independent energy system 4) The project is based on an energy-centric survey and calculation 5) There is no foreseeable climate risk 6) Office institution performing administrative function 7) Proportionalisation is not required 8) The planning values comply with the technical-technical regulations and the relevant requirements of the call, the energy certificate showing the starting state 9) is not relevant 10) 176/2008 (VI.30.) Government Decree 11) non-complex project 12) building energy screening is not required 13) No modernisation 14) if necessary, the SZÉS5 or equivalent expert 15) value inventory will be prepared 16-18) in the final construction documentation the above questions will be specified in detail 19-23) see above 24) the project plan will be attached 25) it is met that -4 %<BMR<+ 4 % 26) the technical inspector costs are planned among the eligible costs of the project 28) the project will absolutely reduce national GHG emissions 29) the condition is met 30) the energy certificate will be prepared even after implementation. 31) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 32) invertren measurement achievable 33) weather tracking regulations will be included 34) weekly time programming will be ensured 35) connection to the system will be possible 36-38) the conditions will be met 39-41) the project is in line with the county SEAP objectives, contains at least A+ category heating equipment, lighting modernisation is not relevant. 42-53) the technical content contained in the investment corresponds to these points of the call. 54-64) non-relevant47) non-relevant d) fulfilment of the content assessment criteria of the call based on the project data sheet and it has been shown in the project plan that the project complies with the content aspects e) area-specific assessment criteria 1.1.) alignment with the ITP priorities through the following measures 1.2, 2, 3.2, 4.1 and 5.2 1.2) does not reach 10 % 2.1.) Yes 2.2.) Yes 3.1.) 1 public building 3.2.) Yes 4.1.) The building was previously renovated and accessible from an AEMOP source, improvement of this development 4.2.) the decrease exceeds 10 % (expected to cause a decrease of more than 50 %) 5.) non-technical-professional results: Describe the technical/professional content, results and units of measurement planned by the project by specifying the most important parameters. Please provide the name, description, non-quantifiable and other characteristics of the technical/professional result to be achieved. The project will achieve fossil energy savings of 231.15 GJ/year through the building energy development, and it is expected that 2 750 kWh/year will be produced by the solar system for own use. The project consists of 18 cm thick 279,3nm facade insulation and 357,3nm floor insulation, as well as 44,6 sqm external window, 8.9 nm door surface will be replaced, 12 solar panel systems with 260Wp capacity will be installed and 24 kW condensing boiler + 4 radiators will be installed in the existing heating system. (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:53, 9 February 2022

Project Q3950016 in Hungary
Language Label Description Also known as
English
Energy modernisation of Borsodbóta Mayor’s Office
Project Q3950016 in Hungary

    Statements

    0 references
    22,252,005 forint
    0 references
    61,531.47 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    71,563.118 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    26,178,829.412 forint
    0 references
    84.99999 percent
    0 references
    1 July 2017
    0 references
    31 December 2018
    0 references
    BORSODBÓTA KÖZSÉG ÖNKORMÁNYZATA
    0 references
    0 references

    48°12'44.64"N, 20°23'24.18"E
    0 references
    a) projekt célja A Borsodbóta Községi Önkormányzat polgármesteri hivatalának energetikai felújítása b)Tervezett önállóan támogatható tevékenységek: - Önkormányzati tulajdonú épület teljes homlokzati és födémhőszigetelés és nyílászáró szerkezetek cseréje készül 7/2006 (V. 24.) TNM rendelet követelményeknek megfelelően - Fotovillamos rendszer kialakítása történik Tervezett önállóan nem támogatható, választható tevékenységek: - Fosszilis energiahordozó alapú hőtermelő berendezések cseréje: a meglévő kazán kondenzációs kazánra történő cseréje Önállóan nem támogatható, kötelezően megvalósítandó tevékenységek - akadálymentesítés: projektarányos akadálymentesítés (korábbi fejlesztések segítségével az ügyfélforgalom számára már biztosított az akadálymentes mellékhelyiséghez való hozzáférés, az épület helyi védettség alatt áll) - azbesztmentesítés: nem releváns - Nyilvánosság biztosítása: a „Kedvezményezettek tájékoztatási kötelezettségei” című dokumentum, "Arculati Kézikönyv” alapján készül - képzési anyagok kidolgozása, képzés tartása: a műszaki átadás-átvétel előfeltétele lesz a képzés megtartása energetikai szakértő által. - helyi védettséget megalapozó értékek megőrzése a projekt során figyelembe vételre kerül. c) a felhívás 3.2 pontjában előírt feltételek teljesülése 1) a projektre vonatkozó környezetvédelmi és esélyegyenlőségi jogszabályokat betartjuk, a projekt által érintett területen a védett természeti és kulturális értékeket megőrizzük, 2) Az Önkormányzat esélytudatosságot fejez ki: nem közvetít szegregációt, csökkenti a csoportokra vonatkozó meglévő előítéleteket. 3) Önálló energetikai rendszert alkotó épület 4) A projekt energetikai központú felmérésen és számításon alapszik 5) nincs előre látható klímakockázata 6) Közigazgatási funkciót ellátó hivatali intézmény 7) Arányosítás nem szükséges 8) A tervezési értékek megfelelnek a hatályos TNM rendeletben meghatározott szakmai-műszaki szabályozásnak és a Felhívás vonatkozó követelményeinek, létezik a kiinduló állapotot bemutató energetikai tanúsítvány 9) nem releváns 10) a 176/2008 (VI.30.) Kormányrendelet szerinti energetikai tanúsítvány készül 11) nem összetett projekt 12) épületenergetikai átvilágítás nem szükséges 13) világítástechnikai korszerűsítés nem készül 14) szükség esetén bevonásra kerül a SzÉS5 vagy egyenértékű szakértő 15) értékleltár készül 16-18) a végleges kivitelezői dokumentációban a fenti kérdések részletesen meg lesznek határozva 19-23) lásd feljebb 24) a projektterv csatolásra kerül 25) teljesül, hogy -4%<BMR<+4% 26) nem releváns 27) műszaki ellenőr költség betervezésre került a projekt elszámolható költségei között 28) a projekt abszolút mértékben csökkenti az országos ÜHG kibocsátást 29) a feltétel teljesül 30) az energetikai tanúsítvány készül a megvalósítást követően is. 31) a jogszabályi környezet változásából fakadó többletköltségeket a projektgazda állja. 32) inverteren mérés megvalósítható 33) időjárás-követő szabályozás épül be 34) heti időprogramozás biztosított lesz 35) rendszerhez való kapcsolódásra lehetőség lesz 36-38) a feltételek teljesítésre kerülnek 39-41) a projekt illeszkedik a megyei SEAP célkitűzésekhez, legalább A+ kategóriájú fűtési berendezést tartalmaz, világításkorszerűsítés nem releváns. 42-53) a beruházásban foglalt műszaki tartalom megfelel a felhívás ezen pontjainak. 54-64) nem releváns47) nem releváns d) a felhívás tartalmi értékelési szempontok teljesülése projektadatlap alapján és projekttervben bemutatásra került, hogy a projekt megfelel a tartalmi felételeknek e) terület-specifikus értékelési szempontok 1.1.) illeskedés az ITP prioritásokhoz az alábbi intézkedéseken keresztül 1.2, 2., 3.2, 4.1 és 5.2 1.2.) nem éri el a 10%-ot 2.1.) igen 2.2.) igen 3.1.) 1 középület 3.2.) igen 4.1.) ÉMOP forrásból korábban felújításra és akadálymentesítésre került az épület, jelen fejlesztés ennek továbbfejlesztése 4.2.) a csökkenés meghaladja a 10%-ot (várhatóan 50% feletti csökkenést okoz) 5.) nem Műszaki-szakmai eredmények: A legfontosabb paraméterek megadásával jellemezze a projekt által megvalósítani tervezett műszaki/szakmai tartalmat, eredményeket, mértékegységeket. Kérjük, adja meg a megvalósítandó műszaki/szakmai eredmény megnevezését, leírását, az eredmény nem számszerűsíthető, egyéb tulajdonságait. A projekt keretében 231,15 GJ/év mértékű fosszilis energiamegtakarítást érünk el az épületenergetikai fejlesztés segítségével, valamint várhatóan 2750 kWh/év saját használatra felhasznált villamosenergiát fog termelni a napelemes rendszer. A projekt keretében 18cm vastag 279,3nm-nyi homlokzati, és 357,3nm födémszigetelés készül, valamint 44,6 nm külső ablak, 8,9 nm ajtó felület kerül cserére, 12 db 260Wp teljesítményű napelemes rendszer kerül telepítésre valamint 24 kW-os teljesítményű kondenzációs kazán + 4 db radiátor kerül beépítésre a meglévő fűtési rendszerbe. (Hungarian)
    0 references
    the purpose of the project is the energy renovation of the Mayor’s Office of the Municipality of Borsodbóta (b)Programmed self-eligible activities: — Building owned by local government is being built in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for Transport and Rural Development. — Replacement of fossil fuel-based heat generating equipment: replacing the existing boiler with a condensing boiler is not self-eligible, mandatory activities — accessibility: project-proportional accessibility (with the help of previous developments, access to accessible toilets is already ensured for customer traffic, the building is protected locally) — asbestos removal: not relevant — Providing publicity: based on Beneficiary’s Information Obligations, ‘Arculati Manual’ — elaboration of training materials and training: the provision of training by an energy expert will be a prerequisite for the technical handover-take-over. — the preservation of locally protected values will be taken into account during the project. C) fulfilling the conditions set out in point 3.2 of the call 1) we comply with the environmental and equal opportunities legislation applicable to the project, we preserve the protected natural and cultural values in the area covered by the project, 2) The Municipality expresses a sense of opportunity: it does not mediate segregation, reduces existing prejudices for groups. 3) Building forming an independent energy system 4) The project is based on an energy-centric survey and calculation 5) There is no foreseeable climate risk 6) Office institution performing administrative function 7) Proportionalisation is not required 8) The planning values comply with the technical-technical regulations and the relevant requirements of the call, the energy certificate showing the starting state 9) is not relevant 10) 176/2008 (VI.30.) Government Decree 11) non-complex project 12) building energy screening is not required 13) No modernisation 14) if necessary, the SZÉS5 or equivalent expert 15) value inventory will be prepared 16-18) in the final construction documentation the above questions will be specified in detail 19-23) see above 24) the project plan will be attached 25) it is met that -4 %<BMR<+ 4 % 26) the technical inspector costs are planned among the eligible costs of the project 28) the project will absolutely reduce national GHG emissions 29) the condition is met 30) the energy certificate will be prepared even after implementation. 31) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 32) invertren measurement achievable 33) weather tracking regulations will be included 34) weekly time programming will be ensured 35) connection to the system will be possible 36-38) the conditions will be met 39-41) the project is in line with the county SEAP objectives, contains at least A+ category heating equipment, lighting modernisation is not relevant. 42-53) the technical content contained in the investment corresponds to these points of the call. 54-64) non-relevant47) non-relevant d) fulfilment of the content assessment criteria of the call based on the project data sheet and it has been shown in the project plan that the project complies with the content aspects e) area-specific assessment criteria 1.1.) alignment with the ITP priorities through the following measures 1.2, 2, 3.2, 4.1 and 5.2 1.2) does not reach 10 % 2.1.) Yes 2.2.) Yes 3.1.) 1 public building 3.2.) Yes 4.1.) The building was previously renovated and accessible from an AEMOP source, improvement of this development 4.2.) the decrease exceeds 10 % (expected to cause a decrease of more than 50 %) 5.) non-technical-professional results: Describe the technical/professional content, results and units of measurement planned by the project by specifying the most important parameters. Please provide the name, description, non-quantifiable and other characteristics of the technical/professional result to be achieved. The project will achieve fossil energy savings of 231.15 GJ/year through the building energy development, and it is expected that 2 750 kWh/year will be produced by the solar system for own use. The project consists of 18 cm thick 279,3nm facade insulation and 357,3nm floor insulation, as well as 44,6 sqm external window, 8.9 nm door surface will be replaced, 12 solar panel systems with 260Wp capacity will be installed and 24 kW condensing boiler + 4 radiators will be installed in the existing heating system. (English)
    9 February 2022
    0 references
    Borsodbóta, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    TOP-3.2.1-15-BO1-2016-00070
    0 references