Development of industrial area in Szakmár (Q3946675): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
The applicant is the Municipality of the Commune of Professionals. The aim of the project is 3.1.1. B) the construction of industrial areas and the development of existing areas, brownfield and greenfield investments — Construction, conversion, renovation, extension and modernisation of the basic infrastructure of industrial areas (gas, water, sewerage, road, siding, car park, electrical wiring system, energy network, telecommunications and communication network, waste management facilities) — Construction of transport surfaces and basic infrastructure investments outside the boundary. The above objective is a self-eligible activity (3.4.1.1(a)) and the mandatory self-eligible activity is the provision of publicity. The development is a greenfield investment, which is necessary because there is no brownfield area available in the village, which can be used for similar purposes (3.4.1.1.b). 3.4.1.1 (c) the area affected by the development is owned by the Municipality and will be owned by the Municipality until milestone 1. Points 3.4.4.1.1(d), (e) are not relevant. 3.4.1.1 f) will be submitted by the first milestone. The development of the industrial area, the technical content of which is described in detail in the technical specifications and business plan: • Construction of a new road section 565 m long, of which 221 m with asphalt, 334 m mart asphalt, • 565 m long grassland drainage ditches, • 1 transformer station, total cost of the investment: 45 000.000 HUF. The Municipality plans to implement the project between 01.06.2018 and 31.01.2019. The refurbishment of the affected road section improves the availability of 19.45 ha of industrial space, where there are currently 12 enterprises and 3 settlers are expected to settle to 25 % of the industrial area so far. (subject to 3.4.1.1 (g), (i)). The transformer station is intended to meet the electricity needs of the installed and expected undertakings. The construction works are contracted through a public procurement procedure. The installation of the transformer station is carried out by Démász Zrt. Development in the industrial area will lead to the creation of new jobs and economic growth in the region. 3.4.1.1 k) together with the full technical documentation, the detailed planning budget will be attached until the first milestone. 3.4.1.1 (p) the business plan and the cost-benefit analysis will be submitted. 3.4.1.2 Equal opportunities and environmental aspects have been taken into account in the planning. The applicant has a local equal opportunities programme. 3.4.2 4 milestones have been planned, milestone 1, planning documentation, permits, public procurement, 50 % of the works by milestone 2, 100 % of the construction by milestone 3, milestone 4 is the project closure. The indicator indicators have been described in detail. Project management is to be implemented by the project promoter with the involvement of his own employees or by subcontracting. (detailed description in chapter 2.3 of the business plan). The merits of the development demand are described in detail in Chapter 3 of the business plan. In Chapter 4 of the business plan, the description of the case without the project, the technical content, the technical and personnel conditions of the operation, the action schedule and the potential risks and their management were described in detail. In addition to providing mandatory publicity, the project promoter plans marketing activities to inform potential settlers, which is described in Chapter 5 of the business plan. The development is in line with the economic and employment recovery priority of the county regional development programme. 1.2. The industrial area developed under the project is 19.45 ha. 2.1. The project is carried out in the beneficiary district. 2.2. Project No 105/2015 (IV.23.) Other municipalities within the meaning of the Government Decree. 2.3 The development does not take place in a sandback or free business zone. 3.2 The beneficiary undertakes to cooperate with local employment pacts in the county during implementation. A detailed description is attached due to the character limitation. (English) | |||||||||||||||
Property / summary: The applicant is the Municipality of the Commune of Professionals. The aim of the project is 3.1.1. B) the construction of industrial areas and the development of existing areas, brownfield and greenfield investments — Construction, conversion, renovation, extension and modernisation of the basic infrastructure of industrial areas (gas, water, sewerage, road, siding, car park, electrical wiring system, energy network, telecommunications and communication network, waste management facilities) — Construction of transport surfaces and basic infrastructure investments outside the boundary. The above objective is a self-eligible activity (3.4.1.1(a)) and the mandatory self-eligible activity is the provision of publicity. The development is a greenfield investment, which is necessary because there is no brownfield area available in the village, which can be used for similar purposes (3.4.1.1.b). 3.4.1.1 (c) the area affected by the development is owned by the Municipality and will be owned by the Municipality until milestone 1. Points 3.4.4.1.1(d), (e) are not relevant. 3.4.1.1 f) will be submitted by the first milestone. The development of the industrial area, the technical content of which is described in detail in the technical specifications and business plan: • Construction of a new road section 565 m long, of which 221 m with asphalt, 334 m mart asphalt, • 565 m long grassland drainage ditches, • 1 transformer station, total cost of the investment: 45 000.000 HUF. The Municipality plans to implement the project between 01.06.2018 and 31.01.2019. The refurbishment of the affected road section improves the availability of 19.45 ha of industrial space, where there are currently 12 enterprises and 3 settlers are expected to settle to 25 % of the industrial area so far. (subject to 3.4.1.1 (g), (i)). The transformer station is intended to meet the electricity needs of the installed and expected undertakings. The construction works are contracted through a public procurement procedure. The installation of the transformer station is carried out by Démász Zrt. Development in the industrial area will lead to the creation of new jobs and economic growth in the region. 3.4.1.1 k) together with the full technical documentation, the detailed planning budget will be attached until the first milestone. 3.4.1.1 (p) the business plan and the cost-benefit analysis will be submitted. 3.4.1.2 Equal opportunities and environmental aspects have been taken into account in the planning. The applicant has a local equal opportunities programme. 3.4.2 4 milestones have been planned, milestone 1, planning documentation, permits, public procurement, 50 % of the works by milestone 2, 100 % of the construction by milestone 3, milestone 4 is the project closure. The indicator indicators have been described in detail. Project management is to be implemented by the project promoter with the involvement of his own employees or by subcontracting. (detailed description in chapter 2.3 of the business plan). The merits of the development demand are described in detail in Chapter 3 of the business plan. In Chapter 4 of the business plan, the description of the case without the project, the technical content, the technical and personnel conditions of the operation, the action schedule and the potential risks and their management were described in detail. In addition to providing mandatory publicity, the project promoter plans marketing activities to inform potential settlers, which is described in Chapter 5 of the business plan. The development is in line with the economic and employment recovery priority of the county regional development programme. 1.2. The industrial area developed under the project is 19.45 ha. 2.1. The project is carried out in the beneficiary district. 2.2. Project No 105/2015 (IV.23.) Other municipalities within the meaning of the Government Decree. 2.3 The development does not take place in a sandback or free business zone. 3.2 The beneficiary undertakes to cooperate with local employment pacts in the county during implementation. A detailed description is attached due to the character limitation. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The applicant is the Municipality of the Commune of Professionals. The aim of the project is 3.1.1. B) the construction of industrial areas and the development of existing areas, brownfield and greenfield investments — Construction, conversion, renovation, extension and modernisation of the basic infrastructure of industrial areas (gas, water, sewerage, road, siding, car park, electrical wiring system, energy network, telecommunications and communication network, waste management facilities) — Construction of transport surfaces and basic infrastructure investments outside the boundary. The above objective is a self-eligible activity (3.4.1.1(a)) and the mandatory self-eligible activity is the provision of publicity. The development is a greenfield investment, which is necessary because there is no brownfield area available in the village, which can be used for similar purposes (3.4.1.1.b). 3.4.1.1 (c) the area affected by the development is owned by the Municipality and will be owned by the Municipality until milestone 1. Points 3.4.4.1.1(d), (e) are not relevant. 3.4.1.1 f) will be submitted by the first milestone. The development of the industrial area, the technical content of which is described in detail in the technical specifications and business plan: • Construction of a new road section 565 m long, of which 221 m with asphalt, 334 m mart asphalt, • 565 m long grassland drainage ditches, • 1 transformer station, total cost of the investment: 45 000.000 HUF. The Municipality plans to implement the project between 01.06.2018 and 31.01.2019. The refurbishment of the affected road section improves the availability of 19.45 ha of industrial space, where there are currently 12 enterprises and 3 settlers are expected to settle to 25 % of the industrial area so far. (subject to 3.4.1.1 (g), (i)). The transformer station is intended to meet the electricity needs of the installed and expected undertakings. The construction works are contracted through a public procurement procedure. The installation of the transformer station is carried out by Démász Zrt. Development in the industrial area will lead to the creation of new jobs and economic growth in the region. 3.4.1.1 k) together with the full technical documentation, the detailed planning budget will be attached until the first milestone. 3.4.1.1 (p) the business plan and the cost-benefit analysis will be submitted. 3.4.1.2 Equal opportunities and environmental aspects have been taken into account in the planning. The applicant has a local equal opportunities programme. 3.4.2 4 milestones have been planned, milestone 1, planning documentation, permits, public procurement, 50 % of the works by milestone 2, 100 % of the construction by milestone 3, milestone 4 is the project closure. The indicator indicators have been described in detail. Project management is to be implemented by the project promoter with the involvement of his own employees or by subcontracting. (detailed description in chapter 2.3 of the business plan). The merits of the development demand are described in detail in Chapter 3 of the business plan. In Chapter 4 of the business plan, the description of the case without the project, the technical content, the technical and personnel conditions of the operation, the action schedule and the potential risks and their management were described in detail. In addition to providing mandatory publicity, the project promoter plans marketing activities to inform potential settlers, which is described in Chapter 5 of the business plan. The development is in line with the economic and employment recovery priority of the county regional development programme. 1.2. The industrial area developed under the project is 19.45 ha. 2.1. The project is carried out in the beneficiary district. 2.2. Project No 105/2015 (IV.23.) Other municipalities within the meaning of the Government Decree. 2.3 The development does not take place in a sandback or free business zone. 3.2 The beneficiary undertakes to cooperate with local employment pacts in the county during implementation. A detailed description is attached due to the character limitation. (English) / qualifier | |||||||||||||||
point in time: 9 February 2022
|
Revision as of 11:04, 9 February 2022
Project Q3946675 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of industrial area in Szakmár |
Project Q3946675 in Hungary |
Statements
45,000,000 forint
0 references
175,377.309 Euro
0.0027336256 Euro
15 December 2021
0 references
64,155,570.129 forint
0 references
70.142227 percent
0 references
1 June 2018
0 references
30 June 2019
0 references
Szakmár Község Önkormányzata
0 references
A pályázó Szakmár Község Önkormányzata. A projekt célja a 3.1.1. B) a, Iparterületek kialakítása és meglévők fejlesztése, barnamezős, illetve zöldmezős beruházások – Az iparterületek telekhatáron belüli alapinfrastruktúrájának (gáz, víz, csatorna, út, iparvágány, parkoló, elektromos vezetékrendszer, energia hálózat, távközlési és kommunikációs hálózat, hulladékkezelő létesítmények) kiépítése, átalakítása, felújítása, bővítése, korszerűsítése, közlekedőfelület kialakítása, illetve telekhatáron kívüli alapinfrastrukturális beruházás megvalósítása. A fenti cél önállóan támogatható tevékenység (3.4.1.1 a)), a kötelező önállóan nem támogatható tevékenység a nyilvánosság biztosítása. A fejlesztés zöldmezős beruházás, melyre azért van szükség, mert a községben nem áll rendelkezésre barnamezős terület, melyet hasonló célra fel lehet használni (3.4.1.1. b). 3.4.1.1 c) a fejlesztéssel érintett terület az Önkormányzat tulajdonában van, illetve az 1. mérföldkőig az Önkormányzat tulajdonába kerül. 3.4.4.1.1. d), e) pont nem releváns. 3.4.1.1 f) az első mérföldkőig benyújtásra kerül. Az iparterületének fejlesztésének, melynek a műszaki tartalma csatolt műszaki leírásban és üzleti tervben részletesen bemutatva: • 565 m hosszú új útszakasz kiépítése, melyből 221 m asztfaltos, 334 m mart aszfaltos, • 565 méter hosszú gyepráccsal burkolt csapadékvíz elvezető árok kiépítése, • 1 db transzformátor állomás kiépítése, A beruházás összköltsége: 45.000.000,- Ft. Az Önkormányzat a projektet 2018.06.01 és 2019.01.31. között tervezi megvalósítani. Az érintett útszakasz felújítása 19,45 ha iparterület elérhetőségét javítja, ahol jelenleg már 12 vállalkozás működik és várhatóan 3 betelepülő vállalkozás fog betelepülni az iparterület eddig kihasználatlan 25%-ára. (a 3.4.1.1 g), i)) figyelembe vételével. A transzformátorállomás a betelepült és várhatóan betelepülő vállalkozások villamosenergia szükségletét hivatott kielégíteni. Az építési munkálatokra közbeszerzési eljárás keretében kötnek szerződést. A transzformátor állomás telepítését a Démász Zrt. végzi. Az iparterületen a fejlesztés új munkahelyek létrehozását és a térség gazdasági növekedését eredményezi. 3.4.1.1 k) az első mérföldkőig a teljes műszaki dokumentációval együtt csatolásra kerül a tételes tervezői költségvetés. 3.4.1.1 p) az üzleti terv és a költség-haszon elemzés benyújtásra kerül. 3.4.1.2 Esélyegyenlőségi és környezetvédelmi szempontokat a tervezéskor figyelembe vettük. A pályázó rendelkezik helyi esélyegyenlőségi programmal. 3.4.2 4 mérföldkő került megtervezésre, az 1. mérföldkőig a tervdokumentáció, engedélyezések, közbeszerzés történik meg, a 2. mérföldkőig a kivitelezés 50%-a, a 3. mérföldkőig a kivitelezés 100%-a, a 4. mérföldkő a projektzárás. Az indikátormutatók részletesen bemutatásra kerültek. A projektmenedzsmentet a projektgazda saját munkavállalói bevonásával illetve alvállalkozó igénybevételével kívánja megvalósítani. (üzleti terv 2.3. fejezet részletes bemutatja). A fejlesztési igény megalapozottságát az üzleti terv 3. fejezete részletesen bemutatja. Az üzleti tervben 4. fejezetében részletesen bemutatásra került a projekt nélküli eset, műszaki tartalom leírása, az üzemeltetés technikai és személyi feltételei, a cselekvési ütemterv és a lehetséges kockázatok illetve ezek kezelése. A projektgazda a kötelező nyilvánosság biztosításán kívül marketing tevékenységet tervez a potenciális betelepülő vállalkozások tájékoztatására, mely az üzleti terv 5. fejezetében bemutatásra került. A fejlesztés illeszkedik a megyei területfejlesztési program gazdaság- és foglalkoztatás élénkítési prioritásához. 1.2. A projekt keretében fejlesztett iparterület 19,45 ha. 2.1. A projekt kedvezményezett járásban valósul meg. 2.2. A projekt a 105/2015. (IV.23.) Kormányrendelet értelmében egyéb település. 2.3 A fejlesztés nem homokhátsági vagy szabad vállalkozási zónában valósul meg. 3.2 A kedvezményezett vállalja, hogy a megvalósítás során együttműködik a megyében létrejövő helyi foglalkoztatási paktumokkal. A karakterkorlát miatt részletes leírás csatolva. (Hungarian)
0 references
The applicant is the Municipality of the Commune of Professionals. The aim of the project is 3.1.1. B) the construction of industrial areas and the development of existing areas, brownfield and greenfield investments — Construction, conversion, renovation, extension and modernisation of the basic infrastructure of industrial areas (gas, water, sewerage, road, siding, car park, electrical wiring system, energy network, telecommunications and communication network, waste management facilities) — Construction of transport surfaces and basic infrastructure investments outside the boundary. The above objective is a self-eligible activity (3.4.1.1(a)) and the mandatory self-eligible activity is the provision of publicity. The development is a greenfield investment, which is necessary because there is no brownfield area available in the village, which can be used for similar purposes (3.4.1.1.b). 3.4.1.1 (c) the area affected by the development is owned by the Municipality and will be owned by the Municipality until milestone 1. Points 3.4.4.1.1(d), (e) are not relevant. 3.4.1.1 f) will be submitted by the first milestone. The development of the industrial area, the technical content of which is described in detail in the technical specifications and business plan: • Construction of a new road section 565 m long, of which 221 m with asphalt, 334 m mart asphalt, • 565 m long grassland drainage ditches, • 1 transformer station, total cost of the investment: 45 000.000 HUF. The Municipality plans to implement the project between 01.06.2018 and 31.01.2019. The refurbishment of the affected road section improves the availability of 19.45 ha of industrial space, where there are currently 12 enterprises and 3 settlers are expected to settle to 25 % of the industrial area so far. (subject to 3.4.1.1 (g), (i)). The transformer station is intended to meet the electricity needs of the installed and expected undertakings. The construction works are contracted through a public procurement procedure. The installation of the transformer station is carried out by Démász Zrt. Development in the industrial area will lead to the creation of new jobs and economic growth in the region. 3.4.1.1 k) together with the full technical documentation, the detailed planning budget will be attached until the first milestone. 3.4.1.1 (p) the business plan and the cost-benefit analysis will be submitted. 3.4.1.2 Equal opportunities and environmental aspects have been taken into account in the planning. The applicant has a local equal opportunities programme. 3.4.2 4 milestones have been planned, milestone 1, planning documentation, permits, public procurement, 50 % of the works by milestone 2, 100 % of the construction by milestone 3, milestone 4 is the project closure. The indicator indicators have been described in detail. Project management is to be implemented by the project promoter with the involvement of his own employees or by subcontracting. (detailed description in chapter 2.3 of the business plan). The merits of the development demand are described in detail in Chapter 3 of the business plan. In Chapter 4 of the business plan, the description of the case without the project, the technical content, the technical and personnel conditions of the operation, the action schedule and the potential risks and their management were described in detail. In addition to providing mandatory publicity, the project promoter plans marketing activities to inform potential settlers, which is described in Chapter 5 of the business plan. The development is in line with the economic and employment recovery priority of the county regional development programme. 1.2. The industrial area developed under the project is 19.45 ha. 2.1. The project is carried out in the beneficiary district. 2.2. Project No 105/2015 (IV.23.) Other municipalities within the meaning of the Government Decree. 2.3 The development does not take place in a sandback or free business zone. 3.2 The beneficiary undertakes to cooperate with local employment pacts in the county during implementation. A detailed description is attached due to the character limitation. (English)
9 February 2022
0 references
Szakmár, Bács-Kiskun
0 references
Identifiers
TOP-1.1.1-16-BK1-2017-00004
0 references