Within the framework of the project, 2 municipal buildings will be invested in energy efficiency. One building is located in 2142 Nagytarcsa, Zrínyi street 38, 229/1, family support service, dental practice and pharmacy. The building complex has a freestanding, masonry structure, partly underpinned, high roof. Problems encountered, errors: Thermal insulation is required for external walls, attic slab, flat roof, windows with poor filtration. Apart from the minimum necessary maintenance, no major renovations have taken place. Description of planned renovation works: Facade, attic ceiling, basement slab, arcade slab, flat roof thermal insulation. Replacement of facade doors and windows. Installation of air exchange structures. The other building affected by the renovation is the community building in Nagytarcsa (HEMO), which is located at 2142 Nagytarcsa, Rákóczi utca 84, 1256/3. The building is free-standing, with masonry structure and flat roof. Problems encountered, errors: Thermal insulation is required for external walls, basement slab, roof. It is necessary to replace the roof waterproofing and to rebuild the drainage system. Doors and windows with bad filtration. Maintenance status: it’s a neglected building. Description of planned renovation works: Replacement of flat roof waterproofing. Facade, basement floor, roof thermal insulation. Replacement of facade doors and windows. Installation of air exchange structures. Detailed description of renovation points for both sites: Facade thermal insulation: External thermal insulation is required because of the U value of masonry external delimitation devices which are now unacceptably low. Reducing heating charges and energy costs in general is an urgent task that can have a direct impact on users. Masonry support structures are ventilated, so the vapor permeability of external thermal insulation is important. The condensation curves must not intersect, no condensation within the wall. Replacement of facade doors and windows: The condition of doors and windows is generally poor and this is one of the main reasons for the high heating costs of the building. The new doors and windows are three-layer thermal insulation glazed PVC windows with a U-value according to the energy requirements, outside with TiZn sill, inside with plastic elbow. The installation plane of the new doors and windows is the same as the outer plane of the rough wall structure. Air exchange: At the present rate, the air exchange takes place through the existing doors and windows by filtration, which is provided by installers in the windows after the change of windows. In the case of HEMO, the following activities will be carried out: Thermal insulation of basement floor: Since the garage floor is unheated throughout the floor, the slab acts like a basement floor. The basement floor, excluding the atrium area, shall be thermally insulated with 16 cm Austrotherm AT-H80 EPS, including the “circling” of beams. Thermal insulation of flat roof: The flat roof is uniformly 25 cm Austrotherm AT-N150 EPS thermal insulation, on which two layers of modified bituminous thick plate are applied against rainwater. The family support service building also includes the following activities: Thermal insulation of the attic roof: On the attic floor, 25 cm Rockwool AirRock LD rock wool is thermally insulated, freely spreaded, covered with protective film, with slabs fixed as a viable part. Additional works in both locations: Drainage, rebuilding of roofs that have been demolished due to renovation, external mechanical wiring and ancillary works related to meters, the planned refurbishment does not affect internal changes. In the case of HEMO, the existing grids of doors and windows will be removed during the renovation and then rebuilt according to the refurbished facade. The development will be carried out in accordance with the relevant regulations. The energy certificates showing the pre-development state and the calculation of the state after development have been completed. The building meets its energy requirements, so a solar system can be installed on it. The project will be carried out in the framework of an activated investment. We comply with environmental and equal opportunities legislation applicable to the project. We express a sense of opportunity in public events, communication and behaviour related to development. The municipality has a local equal opportunities programme. At the time of submission of the project, in accordance with the call for proposals, the public procurement procedure was carried out and the conditional contract was concluded. (English)
Property / summary: Within the framework of the project, 2 municipal buildings will be invested in energy efficiency. One building is located in 2142 Nagytarcsa, Zrínyi street 38, 229/1, family support service, dental practice and pharmacy. The building complex has a freestanding, masonry structure, partly underpinned, high roof. Problems encountered, errors: Thermal insulation is required for external walls, attic slab, flat roof, windows with poor filtration. Apart from the minimum necessary maintenance, no major renovations have taken place. Description of planned renovation works: Facade, attic ceiling, basement slab, arcade slab, flat roof thermal insulation. Replacement of facade doors and windows. Installation of air exchange structures. The other building affected by the renovation is the community building in Nagytarcsa (HEMO), which is located at 2142 Nagytarcsa, Rákóczi utca 84, 1256/3. The building is free-standing, with masonry structure and flat roof. Problems encountered, errors: Thermal insulation is required for external walls, basement slab, roof. It is necessary to replace the roof waterproofing and to rebuild the drainage system. Doors and windows with bad filtration. Maintenance status: it’s a neglected building. Description of planned renovation works: Replacement of flat roof waterproofing. Facade, basement floor, roof thermal insulation. Replacement of facade doors and windows. Installation of air exchange structures. Detailed description of renovation points for both sites: Facade thermal insulation: External thermal insulation is required because of the U value of masonry external delimitation devices which are now unacceptably low. Reducing heating charges and energy costs in general is an urgent task that can have a direct impact on users. Masonry support structures are ventilated, so the vapor permeability of external thermal insulation is important. The condensation curves must not intersect, no condensation within the wall. Replacement of facade doors and windows: The condition of doors and windows is generally poor and this is one of the main reasons for the high heating costs of the building. The new doors and windows are three-layer thermal insulation glazed PVC windows with a U-value according to the energy requirements, outside with TiZn sill, inside with plastic elbow. The installation plane of the new doors and windows is the same as the outer plane of the rough wall structure. Air exchange: At the present rate, the air exchange takes place through the existing doors and windows by filtration, which is provided by installers in the windows after the change of windows. In the case of HEMO, the following activities will be carried out: Thermal insulation of basement floor: Since the garage floor is unheated throughout the floor, the slab acts like a basement floor. The basement floor, excluding the atrium area, shall be thermally insulated with 16 cm Austrotherm AT-H80 EPS, including the “circling” of beams. Thermal insulation of flat roof: The flat roof is uniformly 25 cm Austrotherm AT-N150 EPS thermal insulation, on which two layers of modified bituminous thick plate are applied against rainwater. The family support service building also includes the following activities: Thermal insulation of the attic roof: On the attic floor, 25 cm Rockwool AirRock LD rock wool is thermally insulated, freely spreaded, covered with protective film, with slabs fixed as a viable part. Additional works in both locations: Drainage, rebuilding of roofs that have been demolished due to renovation, external mechanical wiring and ancillary works related to meters, the planned refurbishment does not affect internal changes. In the case of HEMO, the existing grids of doors and windows will be removed during the renovation and then rebuilt according to the refurbished facade. The development will be carried out in accordance with the relevant regulations. The energy certificates showing the pre-development state and the calculation of the state after development have been completed. The building meets its energy requirements, so a solar system can be installed on it. The project will be carried out in the framework of an activated investment. We comply with environmental and equal opportunities legislation applicable to the project. We express a sense of opportunity in public events, communication and behaviour related to development. The municipality has a local equal opportunities programme. At the time of submission of the project, in accordance with the call for proposals, the public procurement procedure was carried out and the conditional contract was concluded. (English) / rank
 
Normal rank
Property / summary: Within the framework of the project, 2 municipal buildings will be invested in energy efficiency. One building is located in 2142 Nagytarcsa, Zrínyi street 38, 229/1, family support service, dental practice and pharmacy. The building complex has a freestanding, masonry structure, partly underpinned, high roof. Problems encountered, errors: Thermal insulation is required for external walls, attic slab, flat roof, windows with poor filtration. Apart from the minimum necessary maintenance, no major renovations have taken place. Description of planned renovation works: Facade, attic ceiling, basement slab, arcade slab, flat roof thermal insulation. Replacement of facade doors and windows. Installation of air exchange structures. The other building affected by the renovation is the community building in Nagytarcsa (HEMO), which is located at 2142 Nagytarcsa, Rákóczi utca 84, 1256/3. The building is free-standing, with masonry structure and flat roof. Problems encountered, errors: Thermal insulation is required for external walls, basement slab, roof. It is necessary to replace the roof waterproofing and to rebuild the drainage system. Doors and windows with bad filtration. Maintenance status: it’s a neglected building. Description of planned renovation works: Replacement of flat roof waterproofing. Facade, basement floor, roof thermal insulation. Replacement of facade doors and windows. Installation of air exchange structures. Detailed description of renovation points for both sites: Facade thermal insulation: External thermal insulation is required because of the U value of masonry external delimitation devices which are now unacceptably low. Reducing heating charges and energy costs in general is an urgent task that can have a direct impact on users. Masonry support structures are ventilated, so the vapor permeability of external thermal insulation is important. The condensation curves must not intersect, no condensation within the wall. Replacement of facade doors and windows: The condition of doors and windows is generally poor and this is one of the main reasons for the high heating costs of the building. The new doors and windows are three-layer thermal insulation glazed PVC windows with a U-value according to the energy requirements, outside with TiZn sill, inside with plastic elbow. The installation plane of the new doors and windows is the same as the outer plane of the rough wall structure. Air exchange: At the present rate, the air exchange takes place through the existing doors and windows by filtration, which is provided by installers in the windows after the change of windows. In the case of HEMO, the following activities will be carried out: Thermal insulation of basement floor: Since the garage floor is unheated throughout the floor, the slab acts like a basement floor. The basement floor, excluding the atrium area, shall be thermally insulated with 16 cm Austrotherm AT-H80 EPS, including the “circling” of beams. Thermal insulation of flat roof: The flat roof is uniformly 25 cm Austrotherm AT-N150 EPS thermal insulation, on which two layers of modified bituminous thick plate are applied against rainwater. The family support service building also includes the following activities: Thermal insulation of the attic roof: On the attic floor, 25 cm Rockwool AirRock LD rock wool is thermally insulated, freely spreaded, covered with protective film, with slabs fixed as a viable part. Additional works in both locations: Drainage, rebuilding of roofs that have been demolished due to renovation, external mechanical wiring and ancillary works related to meters, the planned refurbishment does not affect internal changes. In the case of HEMO, the existing grids of doors and windows will be removed during the renovation and then rebuilt according to the refurbished facade. The development will be carried out in accordance with the relevant regulations. The energy certificates showing the pre-development state and the calculation of the state after development have been completed. The building meets its energy requirements, so a solar system can be installed on it. The project will be carried out in the framework of an activated investment. We comply with environmental and equal opportunities legislation applicable to the project. We express a sense of opportunity in public events, communication and behaviour related to development. The municipality has a local equal opportunities programme. At the time of submission of the project, in accordance with the call for proposals, the public procurement procedure was carried out and the conditional contract was concluded. (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:34, 9 February 2022

Project Q3944272 in Hungary
Language Label Description Also known as
English
Energy efficiency investment in Nagytarcsa institutions
Project Q3944272 in Hungary

    Statements

    0 references
    0 references
    115,262,598 forint
    0 references
    318,725.29 Euro
    0.00276521 Euro
    4 December 2021
    0 references
    354,027.852 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    129,508,537.079 forint
    0 references
    88.999998 percent
    0 references
    29 May 2017
    0 references
    30 April 2018
    0 references
    NAGYTARCSA KÖZSÉG ÖNKORMÁNYZATA
    0 references
    0 references

    47°31'22.55"N, 19°17'30.30"E
    0 references
    A projekt keretén belül 2 önkormányzati tulajdonú épület energiahatékonysági beruházása valósul meg. Az egyik épület a 2142 Nagytarcsa, Zrínyi utca 38., 229/1 helyrajzi számon található Családsegítő szolgálat, fogorvosi rendelő és gyógyszertár épülete. Az épületegyüttes szabadon álló beépítésű, falazott szerkezetű, részben alápincézett, magastetős. Felmerült problémák, hibák: Hőszigetelés szükséges a külső falakra, a padlásfödémre, a lapostetőre, rossz filtrációjú nyílászárók. A minimálisan szükséges karbantartáson kívül, nagymértékű felújítás nem történt. Tervezett felújítási munkák ismertetése: Homlokzati, padlásfödém, pincefödém, árkádfödém, lapostető hőszigetelés. Homlokzati nyílászáró szerkezetek cseréje. A légcserét biztosító szerkezetek beépítése. A felújítással érintett másik épület a nagytarcsai közösségi épület (HEMO) ami a 2142 Nagytarcsa, Rákóczi utca 84., 1256/3 hrsz címen található. Az épület szabadon álló beépítésű, falazott szerkezetű, lapostetős. Felmerült problémák, hibák: Hőszigetelés szükséges a külső falakra, a pincefödémre, a tetőre. A tető vízszigetelés cseréje és a vízelvezető rendszer újraépítése szükséges. Rossz filtrációjú nyílászárók. Karbantartási állapot: elhanyagolt állapotú épület. Tervezett felújítási munkák ismertetése: Lapostető vízszigetelés cseréje. Homlokzati, pincefödém, tető hőszigetelés. Homlokzati nyílászáró szerkezetek cseréje. A légcserét biztosító szerkezetek beépítése. Felújítási pontok részletes ismertetése mindkét helyszínre vonatkozóan: Homlokzati hőszigetelés: A külső oldali hőszigetelésre a falazott külső határoló szerkezetek mára elfogadhatatlanul alacsony U értéke miatt van szükség. A fűtési díjak és általában az energiaköltségek csökkentése sürgető feladat, amely közvetlenül a használókra is hatással lehet. A falazott tartószerkezetek szellőznek, ezért a külső hőszigetelés páraáteresztő képessége fontos. A páradiffúziós görbék nem metszhetik egymást, a falon belül lecsapódás nem keletkezhet. Homlokzati nyílászáró szerkezetek cseréje: A nyílászárók állapota általánosságban rossz és az épület magas fűtési költségeinek ez az egyik fő oka. Az új nyílászárók háromrétegű hőszigetelő üvegezésű, PVC nyílászárók, az energetikai követelményeknek megfelelő U-értékkel, kívül TiZn párkánnyal, belül igény szerint műanyag könyöklővel. Az új nyílászárók beépítési síkja megegyezik a nyers falszerkezet külső síkjával. Légcsere: Jelen ütemben a légcsere a meglévő nyílászárókon keresztül, filtrációval történik, mely nyílászárócserét követően a nyílászárókba épített résszellőzők révén biztosított. A HEMO esetén az alábbi tevékenységek valósulnak meg: Pincefödém hőszigetelése: Mivel a garázsszint teljes alapterületében fűtetlen, a födéme pincefödémként viselkedik. A pincefödém, az átrium alatti terület kivételével, teljes felületén 16 cm Austrotherm AT-H80 EPS hőszigetelést kap, beleértve a gerendák „körbecsomagolását” is. Lapostető hőszigetelése: A lapostetőre egységesen 25 cm Austrotherm AT-N150 EPS hőszigetelés kerül, melyre két réteg modifikált bitumenes vastaglemez csapadékvíz elleni szigetelést helyeznek. A családsegítő szolgálat épülete az alábbi tevékenységeket foglalja még magába: Padlásfödém hőszigetelése: A padlásfödémre egységesen 25 cm Rockwool AirRock LD kőzetgyapot hőszigetelés kerül, szabadon terítve, védőfóliával lefedve, járható rész biztosításaként pallók rögzítésével. Kiegészítő munkák mindkét helyszínen: Vízelvezetés, a felújítás miatt elbontott előtetők újraépítése, külső gépészeti vezetékek és mérőórákkal kapcsolatos járulékos munkálatok, a tervezett felújítás belső változtatásokat nem érint. A HEMO esetén a nyílászárók meglévő rácsai a felújítás során eltávolításra, majd újraépítésre kerülnek a felújított homlokzatnak megfelelően. A fejlesztést a vonatkozó szabályozásoknak megfelelően végezzük el. A fejlesztés előtti állapotot bemutató energetikai tanúsítványok és a fejlesztés utáni állapot számításai elkészültek. Az épület megfelel a rá vonatkozó energetikai követelményeknek, így napelemes rendszer telepíthető rá. A projekt aktivált beruházás keretében valósul meg. A projektre vonatkozó környezeti és esélyegyenlőségi jogszabályokat betartjuk. A fejlesztéshez kapcsolódó nyilvános eseményeken, kommunikációban és viselkedésben esélytudatosságot fejezünk ki. A település rendelkezik helyi esélyegyenlőségi programmal. A projekt benyújtásakor a pályázati felhívásnak megfelelően a közbeszerzési eljárás lefolytatásra került és megkötöttük a feltételes vállalkozási szerződést. (Hungarian)
    0 references
    Within the framework of the project, 2 municipal buildings will be invested in energy efficiency. One building is located in 2142 Nagytarcsa, Zrínyi street 38, 229/1, family support service, dental practice and pharmacy. The building complex has a freestanding, masonry structure, partly underpinned, high roof. Problems encountered, errors: Thermal insulation is required for external walls, attic slab, flat roof, windows with poor filtration. Apart from the minimum necessary maintenance, no major renovations have taken place. Description of planned renovation works: Facade, attic ceiling, basement slab, arcade slab, flat roof thermal insulation. Replacement of facade doors and windows. Installation of air exchange structures. The other building affected by the renovation is the community building in Nagytarcsa (HEMO), which is located at 2142 Nagytarcsa, Rákóczi utca 84, 1256/3. The building is free-standing, with masonry structure and flat roof. Problems encountered, errors: Thermal insulation is required for external walls, basement slab, roof. It is necessary to replace the roof waterproofing and to rebuild the drainage system. Doors and windows with bad filtration. Maintenance status: it’s a neglected building. Description of planned renovation works: Replacement of flat roof waterproofing. Facade, basement floor, roof thermal insulation. Replacement of facade doors and windows. Installation of air exchange structures. Detailed description of renovation points for both sites: Facade thermal insulation: External thermal insulation is required because of the U value of masonry external delimitation devices which are now unacceptably low. Reducing heating charges and energy costs in general is an urgent task that can have a direct impact on users. Masonry support structures are ventilated, so the vapor permeability of external thermal insulation is important. The condensation curves must not intersect, no condensation within the wall. Replacement of facade doors and windows: The condition of doors and windows is generally poor and this is one of the main reasons for the high heating costs of the building. The new doors and windows are three-layer thermal insulation glazed PVC windows with a U-value according to the energy requirements, outside with TiZn sill, inside with plastic elbow. The installation plane of the new doors and windows is the same as the outer plane of the rough wall structure. Air exchange: At the present rate, the air exchange takes place through the existing doors and windows by filtration, which is provided by installers in the windows after the change of windows. In the case of HEMO, the following activities will be carried out: Thermal insulation of basement floor: Since the garage floor is unheated throughout the floor, the slab acts like a basement floor. The basement floor, excluding the atrium area, shall be thermally insulated with 16 cm Austrotherm AT-H80 EPS, including the “circling” of beams. Thermal insulation of flat roof: The flat roof is uniformly 25 cm Austrotherm AT-N150 EPS thermal insulation, on which two layers of modified bituminous thick plate are applied against rainwater. The family support service building also includes the following activities: Thermal insulation of the attic roof: On the attic floor, 25 cm Rockwool AirRock LD rock wool is thermally insulated, freely spreaded, covered with protective film, with slabs fixed as a viable part. Additional works in both locations: Drainage, rebuilding of roofs that have been demolished due to renovation, external mechanical wiring and ancillary works related to meters, the planned refurbishment does not affect internal changes. In the case of HEMO, the existing grids of doors and windows will be removed during the renovation and then rebuilt according to the refurbished facade. The development will be carried out in accordance with the relevant regulations. The energy certificates showing the pre-development state and the calculation of the state after development have been completed. The building meets its energy requirements, so a solar system can be installed on it. The project will be carried out in the framework of an activated investment. We comply with environmental and equal opportunities legislation applicable to the project. We express a sense of opportunity in public events, communication and behaviour related to development. The municipality has a local equal opportunities programme. At the time of submission of the project, in accordance with the call for proposals, the public procurement procedure was carried out and the conditional contract was concluded. (English)
    9 February 2022
    0 references
    Nagytarcsa, Pest
    0 references

    Identifiers

    KEHOP-5.2.9-16-2016-00114