Construction of a mini crèche in Philippines (Q3948370): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
The Municipality of Philippe is planning to build a 122.51 m² mini crèche as a separate building in the centre of the existing kindergarten building. At the time of design, we proceeded by applying the requirements of the OTÉK. The investment will be carried out within the framework of the Bölcsőde Development Programme, using a tender source. The aim was to build a building that meets today’s needs in such a way that it is economically feasible and does not impose an additional burden on the operator during operation. The plot is located in a flat area, not locally protected, orientation of the West-East. The area is improved, water, electricity gas and drainage are introduced. The builder separates part of the courtyard of the kindergarten to accommodate the building of the mini crèche. The planned building receives 15 cm external thermal insulation. In accordance with the regulations, the complex accessibility of the building is ensured. Within the framework of the project, the following premises will be set up: Foreground, Children’s dressing room, Children’s washbasin, Employer, Storage room, Disabled toilet, Corridor, Office, Heater kitchen, Windcup, Personnel changing room, Personnel washbasin, Foreground, Personnel Toilet, Children’s carriage storage, Archives, Cleaner storage, Waste storage on a total of 122.51 m², as well as an open terrace. Feasibility analysis of the alternative energy supply in accordance with Article 7/2006 on the definition of the energy characteristics of buildings. In the cases specified in Decree No 4 of 24 May 2012 of the Minister for National Development and in accordance with Annex 4 thereto: on the one hand, they create a well-insulated building structure and thermal envelope in accordance with the applicable standards and limits. On the other hand, modern closed fronted gas heating is provided in the building. External property supplied with utilities from the immediate vicinity of the physical installation shall not be used. For modern energy use, in the course of the development we install solar candelegers in order to use renewable energy sources. The number of age groups under the age of 2 in the municipality shows an upward trend between 2014 and 2017 on the basis of demographic indicators. In 2017, the number of people aged 0-2 is estimated at 28 people. In order to ensure the full fulfilment of the tasks of the Municipality, you will implement the operation of a 1 group mini crèche. When determining the number of children and the number of places, we took into account the 15/1998. (IV. 30.) as described in Decree No 30/2002 of the Minister for National Development. The total number of places planned will be 7 people. According to the 2017 statistical data, 149 children in the settlement are entitled to a regular child protection allowance. Of these, 130 children are disadvantaged, while 19 children are still disadvantaged, which is a very high proportion. Parents’ low educational attainment, low employment and housing deprivation are dominated by disadvantaged and cumulative disadvantages. The institutional proportion of disadvantaged children is close to 36 % and the presence of cumulatively disadvantaged children is around 1 %. It is important that the mini crèche, as a public education institution, has to respond to changes in society and at settlement level through its flexible system of activities, with its new educational and educational offer. Overall, the proportion of disadvantaged and cumulatively disadvantaged children is very high not only in the municipality but also in institutions. The number of children with special educational needs is also high in the institutions and will show an even higher number from year to year, for which accurate data will be provided in the factsheet. In the framework of the project, the future maintainer of the mini crèche, the municipality aims to improve the disadvantaged situation of the district and its settlements in the long term by bringing together the poor, torn children and their families in the settlement, with the joint, coordinated and planned work of the stakeholders and stakeholders. As a result of the project, a gap-filling service will be put in place to improve long-term learning opportunities and outcomes in a measurable way, with a special focus on disadvantaged and cumulatively disadvantaged and Roma children living in poverty. Services are improving and expanding as a result of which poverty and exclusion levels and regeneration are reduced. Children’s exclusion, segregation and deviances are reduced. The involvement of segregated social groups in community initiatives improves their housing conditions and improves the quality of life of HH families by participating in community gatherings. In view of the almost 120 % utilisation of the places of kindergarten in the settlement (currently 60 people attend the kindergarten instead of 40) it is not possible to recruit children aged 2.5 to the ... (English) | |||||||||||||||
Property / summary: The Municipality of Philippe is planning to build a 122.51 m² mini crèche as a separate building in the centre of the existing kindergarten building. At the time of design, we proceeded by applying the requirements of the OTÉK. The investment will be carried out within the framework of the Bölcsőde Development Programme, using a tender source. The aim was to build a building that meets today’s needs in such a way that it is economically feasible and does not impose an additional burden on the operator during operation. The plot is located in a flat area, not locally protected, orientation of the West-East. The area is improved, water, electricity gas and drainage are introduced. The builder separates part of the courtyard of the kindergarten to accommodate the building of the mini crèche. The planned building receives 15 cm external thermal insulation. In accordance with the regulations, the complex accessibility of the building is ensured. Within the framework of the project, the following premises will be set up: Foreground, Children’s dressing room, Children’s washbasin, Employer, Storage room, Disabled toilet, Corridor, Office, Heater kitchen, Windcup, Personnel changing room, Personnel washbasin, Foreground, Personnel Toilet, Children’s carriage storage, Archives, Cleaner storage, Waste storage on a total of 122.51 m², as well as an open terrace. Feasibility analysis of the alternative energy supply in accordance with Article 7/2006 on the definition of the energy characteristics of buildings. In the cases specified in Decree No 4 of 24 May 2012 of the Minister for National Development and in accordance with Annex 4 thereto: on the one hand, they create a well-insulated building structure and thermal envelope in accordance with the applicable standards and limits. On the other hand, modern closed fronted gas heating is provided in the building. External property supplied with utilities from the immediate vicinity of the physical installation shall not be used. For modern energy use, in the course of the development we install solar candelegers in order to use renewable energy sources. The number of age groups under the age of 2 in the municipality shows an upward trend between 2014 and 2017 on the basis of demographic indicators. In 2017, the number of people aged 0-2 is estimated at 28 people. In order to ensure the full fulfilment of the tasks of the Municipality, you will implement the operation of a 1 group mini crèche. When determining the number of children and the number of places, we took into account the 15/1998. (IV. 30.) as described in Decree No 30/2002 of the Minister for National Development. The total number of places planned will be 7 people. According to the 2017 statistical data, 149 children in the settlement are entitled to a regular child protection allowance. Of these, 130 children are disadvantaged, while 19 children are still disadvantaged, which is a very high proportion. Parents’ low educational attainment, low employment and housing deprivation are dominated by disadvantaged and cumulative disadvantages. The institutional proportion of disadvantaged children is close to 36 % and the presence of cumulatively disadvantaged children is around 1 %. It is important that the mini crèche, as a public education institution, has to respond to changes in society and at settlement level through its flexible system of activities, with its new educational and educational offer. Overall, the proportion of disadvantaged and cumulatively disadvantaged children is very high not only in the municipality but also in institutions. The number of children with special educational needs is also high in the institutions and will show an even higher number from year to year, for which accurate data will be provided in the factsheet. In the framework of the project, the future maintainer of the mini crèche, the municipality aims to improve the disadvantaged situation of the district and its settlements in the long term by bringing together the poor, torn children and their families in the settlement, with the joint, coordinated and planned work of the stakeholders and stakeholders. As a result of the project, a gap-filling service will be put in place to improve long-term learning opportunities and outcomes in a measurable way, with a special focus on disadvantaged and cumulatively disadvantaged and Roma children living in poverty. Services are improving and expanding as a result of which poverty and exclusion levels and regeneration are reduced. Children’s exclusion, segregation and deviances are reduced. The involvement of segregated social groups in community initiatives improves their housing conditions and improves the quality of life of HH families by participating in community gatherings. In view of the almost 120 % utilisation of the places of kindergarten in the settlement (currently 60 people attend the kindergarten instead of 40) it is not possible to recruit children aged 2.5 to the ... (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The Municipality of Philippe is planning to build a 122.51 m² mini crèche as a separate building in the centre of the existing kindergarten building. At the time of design, we proceeded by applying the requirements of the OTÉK. The investment will be carried out within the framework of the Bölcsőde Development Programme, using a tender source. The aim was to build a building that meets today’s needs in such a way that it is economically feasible and does not impose an additional burden on the operator during operation. The plot is located in a flat area, not locally protected, orientation of the West-East. The area is improved, water, electricity gas and drainage are introduced. The builder separates part of the courtyard of the kindergarten to accommodate the building of the mini crèche. The planned building receives 15 cm external thermal insulation. In accordance with the regulations, the complex accessibility of the building is ensured. Within the framework of the project, the following premises will be set up: Foreground, Children’s dressing room, Children’s washbasin, Employer, Storage room, Disabled toilet, Corridor, Office, Heater kitchen, Windcup, Personnel changing room, Personnel washbasin, Foreground, Personnel Toilet, Children’s carriage storage, Archives, Cleaner storage, Waste storage on a total of 122.51 m², as well as an open terrace. Feasibility analysis of the alternative energy supply in accordance with Article 7/2006 on the definition of the energy characteristics of buildings. In the cases specified in Decree No 4 of 24 May 2012 of the Minister for National Development and in accordance with Annex 4 thereto: on the one hand, they create a well-insulated building structure and thermal envelope in accordance with the applicable standards and limits. On the other hand, modern closed fronted gas heating is provided in the building. External property supplied with utilities from the immediate vicinity of the physical installation shall not be used. For modern energy use, in the course of the development we install solar candelegers in order to use renewable energy sources. The number of age groups under the age of 2 in the municipality shows an upward trend between 2014 and 2017 on the basis of demographic indicators. In 2017, the number of people aged 0-2 is estimated at 28 people. In order to ensure the full fulfilment of the tasks of the Municipality, you will implement the operation of a 1 group mini crèche. When determining the number of children and the number of places, we took into account the 15/1998. (IV. 30.) as described in Decree No 30/2002 of the Minister for National Development. The total number of places planned will be 7 people. According to the 2017 statistical data, 149 children in the settlement are entitled to a regular child protection allowance. Of these, 130 children are disadvantaged, while 19 children are still disadvantaged, which is a very high proportion. Parents’ low educational attainment, low employment and housing deprivation are dominated by disadvantaged and cumulative disadvantages. The institutional proportion of disadvantaged children is close to 36 % and the presence of cumulatively disadvantaged children is around 1 %. It is important that the mini crèche, as a public education institution, has to respond to changes in society and at settlement level through its flexible system of activities, with its new educational and educational offer. Overall, the proportion of disadvantaged and cumulatively disadvantaged children is very high not only in the municipality but also in institutions. The number of children with special educational needs is also high in the institutions and will show an even higher number from year to year, for which accurate data will be provided in the factsheet. In the framework of the project, the future maintainer of the mini crèche, the municipality aims to improve the disadvantaged situation of the district and its settlements in the long term by bringing together the poor, torn children and their families in the settlement, with the joint, coordinated and planned work of the stakeholders and stakeholders. As a result of the project, a gap-filling service will be put in place to improve long-term learning opportunities and outcomes in a measurable way, with a special focus on disadvantaged and cumulatively disadvantaged and Roma children living in poverty. Services are improving and expanding as a result of which poverty and exclusion levels and regeneration are reduced. Children’s exclusion, segregation and deviances are reduced. The involvement of segregated social groups in community initiatives improves their housing conditions and improves the quality of life of HH families by participating in community gatherings. In view of the almost 120 % utilisation of the places of kindergarten in the settlement (currently 60 people attend the kindergarten instead of 40) it is not possible to recruit children aged 2.5 to the ... (English) / qualifier | |||||||||||||||
point in time: 9 February 2022
|
Revision as of 10:33, 9 February 2022
Project Q3948370 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a mini crèche in Philippines |
Project Q3948370 in Hungary |
Statements
54,286,210 forint
0 references
166,739.521 Euro
0.0027336256 Euro
15 December 2021
0 references
60,995,741.573 forint
0 references
88.999997 percent
0 references
1 July 2020
0 references
30 September 2022
0 references
FÜLÖP KÖZSÉG ÖNKORMÁNYZATA
0 references
Fülöp Községi Önkormányzat a központban, a meglévő óvoda épület telkén különálló épületként egy 122,51 m2 mini bölcsőde építését tervezi. A tervezésnél az OTÉK előírásainak az alkalmazásával jártunk el. A beruházás a Bölcsődei fejlesztési program keretén belül kerül megvalósításra, pályázati forrás felhasználásával. Cél volt a mai kor igényeit kielégítő épület kialakítása, oly módon, hogy az gazdaságosan megvalósítható legyen és az üzemeltetés során ne rójon többlet terhet az üzemeltetőre. A telek sík területen helyezkedik el, helyileg nem védett, tájolása Nyugat-Keleti. A terület közművesített, víz, elektromos áram gáz és csatorna van bevezetve. Az építtető az óvoda udvarának egy részét a mini bölcsőde épületének elhelyezése céljából leválasztja. Az tervezett épület 15 cm külső hőszigetelést kap. Az előírásoknak megfelelően Az épület komplex akadálymentesítése biztosított. A projekt keretében a következő helyiségek kerülnek kialakításra: Előtér, Gyerek öltöző, Gyerek mosdó, Foglalkoztató, Tároló, Mozgáskorlátozott WC, Folyosó, Iroda, Melegítő konyha, Szélfogó, Személyzeti öltöző, Személyzeti mosdó, Előtér, Személyzeti WC, Gyerekkocsi tároló, Irattár, Takarítószer tároló, Hulladék tároló összesen 122,51 m2-en, valamint egy nyitott teraszt is tartalmaz a tervdokumentáció. Az alternatív energiaellátás megvalósíthatósági elemzése az épületek energetikai jellemzőinek meghatározásáról szóló 7/2006. (V. 24.) TNM rendeletben meghatározott esetekben és annak 4. melléklete szerint: egyrészt jól szigetelt, a hatályos előírásoknak, határértékeknek megfelelő épületszerkezetet és termikus burkot hoznak létre. Másrészt biztosítják a korszerű zárt égésterű gázfűtést az épületben. A tárgyi létesítmény közüzemi energiákkal a közvetlen közelből ellátott, külső tulajdont nem kell igénybe venni. A korszerű energiafelhasználás érdekében a fejlesztés során a megújuló energiaforrás használata érdekében napelemes kandelábereket telepítünk. A településen a 2 év alatti korcsoport száma 2014-2017 között a demográfiai mutatók alapján emelkedő tendenciát mutat. 2017. évben a 0-2 év közötti korosztály száma 28 főre tehető. Az Önkormányzati feladatellátás teljes körű biztosításához egy 1 csoportos mini bölcsőde működtetését fogja megvalósítani. A gyermeklétszám és férőhelyszám meghatározásakor figyelemmel voltunk a 15/1998. (IV. 30.) NM rendeletben leírtakra. A tervezett férőhely összesen 7 fő lesz. A 2017-es statisztikai adatok alapján a településen 149 gyermek rendszeres gyermekvédelmi kedvezményre jogosult. Ezek közül 130 gyerek Hátrányos helyzetű, míg 19 gyermek Halmozottan hátrányos helyzetű, amely nagyon magas aránynak mondható. A hátrányos illetve halmozottan hátrányos helyzet megállapításánál a szülők alacsony iskolai végzettsége, alacsony foglalkoztatottsága és az elégtelen lakáskörülmények dominálnak. A hátrányos helyzetű gyerekek intézményi aránya megközelíti az 36%-ot, a halmozottan hátrányos helyzetű gyerekek jelenléte 1 % körül mozog. Fontos, hogy a mini bölcsődének, mint a közoktatási intézménynek, rugalmas tevékenységrendszere által, új nevelési, pedagógiai kínálatával válaszolnia kell a társadalomban, illetve településszinten lezajló változásokra. Összességében elmondható, hogy nemcsak a településen, hanem az intézményekben is nagyon magas a hátrányos helyzetű és a halmozottan hátrányos helyzetű gyerekek aránya. A sajátos nevelés igényű gyerekek száma is magas az intézményekben, és évről évre még magasabb számot fog mutatni, amelyről pontos adatokat az adatlapon közlünk. A projekt keretében a mini bölcsőde leendő fenntartója, az önkormányzat célja, hogy a településen a szegény, leszakadt gyermekekre és családjaikra összepontosítva, a járás és településeinek hátrányos helyzetét az érintettek és az érdekeltek közös, összehangolt, tervszerű munkájával hosszú távon is javítsa. A projekt eredményeként egy hiánypótló szolgáltatás kerül bevezetésre, amely által hosszútávon mérhető módon javulnak a továbbtanulási esélyek és eredmények, kiemelt figyelemmel a szegénységben élő hátrányos és halmozottan hátrányos és roma gyermekekre. Javulnak és bővülnek a szolgáltatások olyanformán, hogy ennek eredményeként csökken a szegénység és kirekesztettség szintje és újratermelődése. Csökken a gyermekeket érő kirekesztés, a szegregáció, valamint az életesélyeket romboló devianciák előfordulása. A szegregátumban lakó társadalmi csoportok közösségi kezdeményezésekbe történő bevonása révén javulnak a lakhatási körülményeik, a közösségi összejöveteleken való részvétellel javul a HH családok életminősége. A településen lévő óvodai férőhelyek majdnem 120 %-os kihasználtsága (jelenleg 40 helyett 60-an járnak az óvodába) végett a 2,5 éves gyermekek felvétele az óvodákba nem lehetséges, így ezek a gyerekek továbbküldésre kerülnek a mini bölcsődei intézményhez. A fentiekben beazonosított problémák megoldásának szükségességét a lakosság körében végzett igényfelmérés is alátámasztja. (Hungarian)
0 references
The Municipality of Philippe is planning to build a 122.51 m² mini crèche as a separate building in the centre of the existing kindergarten building. At the time of design, we proceeded by applying the requirements of the OTÉK. The investment will be carried out within the framework of the Bölcsőde Development Programme, using a tender source. The aim was to build a building that meets today’s needs in such a way that it is economically feasible and does not impose an additional burden on the operator during operation. The plot is located in a flat area, not locally protected, orientation of the West-East. The area is improved, water, electricity gas and drainage are introduced. The builder separates part of the courtyard of the kindergarten to accommodate the building of the mini crèche. The planned building receives 15 cm external thermal insulation. In accordance with the regulations, the complex accessibility of the building is ensured. Within the framework of the project, the following premises will be set up: Foreground, Children’s dressing room, Children’s washbasin, Employer, Storage room, Disabled toilet, Corridor, Office, Heater kitchen, Windcup, Personnel changing room, Personnel washbasin, Foreground, Personnel Toilet, Children’s carriage storage, Archives, Cleaner storage, Waste storage on a total of 122.51 m², as well as an open terrace. Feasibility analysis of the alternative energy supply in accordance with Article 7/2006 on the definition of the energy characteristics of buildings. In the cases specified in Decree No 4 of 24 May 2012 of the Minister for National Development and in accordance with Annex 4 thereto: on the one hand, they create a well-insulated building structure and thermal envelope in accordance with the applicable standards and limits. On the other hand, modern closed fronted gas heating is provided in the building. External property supplied with utilities from the immediate vicinity of the physical installation shall not be used. For modern energy use, in the course of the development we install solar candelegers in order to use renewable energy sources. The number of age groups under the age of 2 in the municipality shows an upward trend between 2014 and 2017 on the basis of demographic indicators. In 2017, the number of people aged 0-2 is estimated at 28 people. In order to ensure the full fulfilment of the tasks of the Municipality, you will implement the operation of a 1 group mini crèche. When determining the number of children and the number of places, we took into account the 15/1998. (IV. 30.) as described in Decree No 30/2002 of the Minister for National Development. The total number of places planned will be 7 people. According to the 2017 statistical data, 149 children in the settlement are entitled to a regular child protection allowance. Of these, 130 children are disadvantaged, while 19 children are still disadvantaged, which is a very high proportion. Parents’ low educational attainment, low employment and housing deprivation are dominated by disadvantaged and cumulative disadvantages. The institutional proportion of disadvantaged children is close to 36 % and the presence of cumulatively disadvantaged children is around 1 %. It is important that the mini crèche, as a public education institution, has to respond to changes in society and at settlement level through its flexible system of activities, with its new educational and educational offer. Overall, the proportion of disadvantaged and cumulatively disadvantaged children is very high not only in the municipality but also in institutions. The number of children with special educational needs is also high in the institutions and will show an even higher number from year to year, for which accurate data will be provided in the factsheet. In the framework of the project, the future maintainer of the mini crèche, the municipality aims to improve the disadvantaged situation of the district and its settlements in the long term by bringing together the poor, torn children and their families in the settlement, with the joint, coordinated and planned work of the stakeholders and stakeholders. As a result of the project, a gap-filling service will be put in place to improve long-term learning opportunities and outcomes in a measurable way, with a special focus on disadvantaged and cumulatively disadvantaged and Roma children living in poverty. Services are improving and expanding as a result of which poverty and exclusion levels and regeneration are reduced. Children’s exclusion, segregation and deviances are reduced. The involvement of segregated social groups in community initiatives improves their housing conditions and improves the quality of life of HH families by participating in community gatherings. In view of the almost 120 % utilisation of the places of kindergarten in the settlement (currently 60 people attend the kindergarten instead of 40) it is not possible to recruit children aged 2.5 to the ... (English)
9 February 2022
0 references
Fülöp, Hajdú-Bihar
0 references
Identifiers
TOP-1.4.1-19-HB1-2019-00014
0 references