Szabadbattyán — Tapolca — Construction of Keszthely electrical plant around Lake Balaton, preparation and implementation of Phase I (Szülbattyán — Balatonfüred) and preparation of Phase II (Q3943023): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
In connection with the preparation of Phase I, the Preliminary Vizzsgal Documentation, feasibility variant analysis and economics calculation are prepared for the project, as well as the Balaton transport development strategy documentation. (English) | |||||||||||||||
Property / summary: In connection with the preparation of Phase I, the Preliminary Vizzsgal Documentation, feasibility variant analysis and economics calculation are prepared for the project, as well as the Balaton transport development strategy documentation. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: In connection with the preparation of Phase I, the Preliminary Vizzsgal Documentation, feasibility variant analysis and economics calculation are prepared for the project, as well as the Balaton transport development strategy documentation. (English) / qualifier | |||||||||||||||
point in time: 9 February 2022
|
Revision as of 10:17, 9 February 2022
Project Q3943023 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Szabadbattyán — Tapolca — Construction of Keszthely electrical plant around Lake Balaton, preparation and implementation of Phase I (Szülbattyán — Balatonfüred) and preparation of Phase II |
Project Q3943023 in Hungary |
Statements
30,467,192,797 forint
0 references
124,283,196.081 Euro
0.0027336256 Euro
15 December 2021
0 references
45,464,600,595.407 forint
0 references
67.013066 percent
0 references
20 May 2016
0 references
31 March 2022
0 references
NIF Nemzeti Infrastruktúra Fejlesztő zártkörűen működő Részvénytársaság
0 references
Az I. ütem előkészítéséhez kapcsolódóan elkészül a projektre vonatkozóan az Előzetes Vizzsgálati Dokumentáció, a megvalósíthatósági változatelemzés és gazdaságossági számítás, valamint a Balaton közlekedésfejlesztési stratégia dokumentáció. (Hungarian)
0 references
In connection with the preparation of Phase I, the Preliminary Vizzsgal Documentation, feasibility variant analysis and economics calculation are prepared for the project, as well as the Balaton transport development strategy documentation. (English)
9 February 2022
0 references
Balatonfüred, Veszprém
0 references
Identifiers
IKOP-3.2.0-15-2016-00019
0 references