Development of the waste water treatment plant in the village of Mocsa (Q3943476): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
The place of implementation of the project is Hungary, the municipality of Mocsa. The Swamp-centered drainage agglomeration is in force 25/2002. It is indicated in Table 5 of Government Decree (II.27.) that the municipality is concerned with the development of an existing waste water treatment plant (TF). The technical content of the project follows the classification of waste water agglomeration according to the Regulation. The reconstruction to be declared does not exceed 5 % of the eligible costs. (English) | |||||||||||||||
Property / summary: The place of implementation of the project is Hungary, the municipality of Mocsa. The Swamp-centered drainage agglomeration is in force 25/2002. It is indicated in Table 5 of Government Decree (II.27.) that the municipality is concerned with the development of an existing waste water treatment plant (TF). The technical content of the project follows the classification of waste water agglomeration according to the Regulation. The reconstruction to be declared does not exceed 5 % of the eligible costs. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The place of implementation of the project is Hungary, the municipality of Mocsa. The Swamp-centered drainage agglomeration is in force 25/2002. It is indicated in Table 5 of Government Decree (II.27.) that the municipality is concerned with the development of an existing waste water treatment plant (TF). The technical content of the project follows the classification of waste water agglomeration according to the Regulation. The reconstruction to be declared does not exceed 5 % of the eligible costs. (English) / qualifier | |||||||||||||||
point in time: 9 February 2022
|
Revision as of 08:28, 9 February 2022
Project Q3943476 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of the waste water treatment plant in the village of Mocsa |
Project Q3943476 in Hungary |
Statements
319,040,724 forint
0 references
1,530,469.23 Euro
0.0027336256 Euro
15 December 2021
0 references
559,867,902.079 forint
0 references
56.984973 percent
0 references
6 October 2016
0 references
13 May 2021
0 references
NFP Nemzeti Fejlesztési Programiroda Nonprofit Korlátolt Felelősségű Társaság
0 references
A projekt megvalósításának helye Magyarország, Mocsa település közigazgatási területe. A Mocsa központú szennyvízelvezetési agglomeráció a hatályos 25/2002. (II.27.) Korm.rendelet 5. sz. táblázatában szerepel, a település meglévő szennyvíztisztító telep fejlesztése (TF) feladattal érintett. A projekt műszaki tartalma a rendelet szerinti szennyvíz-agglomerációs besorolást követi. Az elszámolandó rekonstrukció mértéke nem haladja meg az elszámolható költségek 5 %-át. (Hungarian)
0 references
The place of implementation of the project is Hungary, the municipality of Mocsa. The Swamp-centered drainage agglomeration is in force 25/2002. It is indicated in Table 5 of Government Decree (II.27.) that the municipality is concerned with the development of an existing waste water treatment plant (TF). The technical content of the project follows the classification of waste water agglomeration according to the Regulation. The reconstruction to be declared does not exceed 5 % of the eligible costs. (English)
9 February 2022
0 references
Mocsa, Komárom-Esztergom
0 references
Identifiers
KEHOP-2.2.2-15-2016-00115
0 references