Building energy development at Bakondi Autó Kft. (Q3935154): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The company’s owner and manager have undertaken the necessary preparatory activities for the project. Negotiated with companies marketing/completing solar panel systems, price negotiation was made on the basis of the quotes, as well as the selection of the solar panel system and the construction company. The main steps in the implementation of the project will be: The start of construction starts at the beginning of the month of 2020/06. 17.22...)
(‎Changed an Item: Adding English translations)
Property / summary
 
The company’s owner and manager have undertaken the necessary preparatory activities for the project. Negotiated with companies marketing/completing solar panel systems, price negotiation was made on the basis of the quotes, as well as the selection of the solar panel system and the construction company. The main steps in the implementation of the project will be: The start of construction starts at the beginning of the month of 2020/06. 17.22 kW solar panel system is purchased and installed at 4 Szharet Street, Felsőtárkány. 42 Hyundai 410 W HiE-S410SI or monocrystalline solar modules with 1 Fronius SYMO 15.0 3 M WLAN (remote-monitoring) inverter will be procured and commissioned. Solar modules are electrically connected to each other. 3 of this so-called string are connected to the inverter in parallel. The nominal current of solar modules is 10.93 A, which in the case of short-circuited outlets does not exceed 15 A. The nominal voltage of solar modules is: 37.5 V DC, (empty walking voltage: 45,3 V DC). The purchase and installation of the related structural and support elements, the purchase and installation of the elements necessary for the electrical system of the building and for connection to the network and for technically safe operation, and the purchase and installation of measuring and control equipment. The solar panel system is placed on the roof structure of the building affected by the development on the project data sheet. Management members have gained proficiency in implementing developments similar to those of this project. The company’s development goals are met, as the monthly expenditure is significantly reduced by improving the energy performance, as well as improving CO2 loads, reducing GHG emissions and strengthening the environmentally conscious approach. The project increases the utilisation rate of domestic renewable energy. (English)
Property / summary: The company’s owner and manager have undertaken the necessary preparatory activities for the project. Negotiated with companies marketing/completing solar panel systems, price negotiation was made on the basis of the quotes, as well as the selection of the solar panel system and the construction company. The main steps in the implementation of the project will be: The start of construction starts at the beginning of the month of 2020/06. 17.22 kW solar panel system is purchased and installed at 4 Szharet Street, Felsőtárkány. 42 Hyundai 410 W HiE-S410SI or monocrystalline solar modules with 1 Fronius SYMO 15.0 3 M WLAN (remote-monitoring) inverter will be procured and commissioned. Solar modules are electrically connected to each other. 3 of this so-called string are connected to the inverter in parallel. The nominal current of solar modules is 10.93 A, which in the case of short-circuited outlets does not exceed 15 A. The nominal voltage of solar modules is: 37.5 V DC, (empty walking voltage: 45,3 V DC). The purchase and installation of the related structural and support elements, the purchase and installation of the elements necessary for the electrical system of the building and for connection to the network and for technically safe operation, and the purchase and installation of measuring and control equipment. The solar panel system is placed on the roof structure of the building affected by the development on the project data sheet. Management members have gained proficiency in implementing developments similar to those of this project. The company’s development goals are met, as the monthly expenditure is significantly reduced by improving the energy performance, as well as improving CO2 loads, reducing GHG emissions and strengthening the environmentally conscious approach. The project increases the utilisation rate of domestic renewable energy. (English) / rank
 
Normal rank
Property / summary: The company’s owner and manager have undertaken the necessary preparatory activities for the project. Negotiated with companies marketing/completing solar panel systems, price negotiation was made on the basis of the quotes, as well as the selection of the solar panel system and the construction company. The main steps in the implementation of the project will be: The start of construction starts at the beginning of the month of 2020/06. 17.22 kW solar panel system is purchased and installed at 4 Szharet Street, Felsőtárkány. 42 Hyundai 410 W HiE-S410SI or monocrystalline solar modules with 1 Fronius SYMO 15.0 3 M WLAN (remote-monitoring) inverter will be procured and commissioned. Solar modules are electrically connected to each other. 3 of this so-called string are connected to the inverter in parallel. The nominal current of solar modules is 10.93 A, which in the case of short-circuited outlets does not exceed 15 A. The nominal voltage of solar modules is: 37.5 V DC, (empty walking voltage: 45,3 V DC). The purchase and installation of the related structural and support elements, the purchase and installation of the elements necessary for the electrical system of the building and for connection to the network and for technically safe operation, and the purchase and installation of measuring and control equipment. The solar panel system is placed on the roof structure of the building affected by the development on the project data sheet. Management members have gained proficiency in implementing developments similar to those of this project. The company’s development goals are met, as the monthly expenditure is significantly reduced by improving the energy performance, as well as improving CO2 loads, reducing GHG emissions and strengthening the environmentally conscious approach. The project increases the utilisation rate of domestic renewable energy. (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:02, 8 February 2022

Project Q3935154 in Hungary
Language Label Description Also known as
English
Building energy development at Bakondi Autó Kft.
Project Q3935154 in Hungary

    Statements

    0 references
    0 references
    5,785,920 forint
    0 references
    15,999.28 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    28,757.344 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    10,519,854.545 forint
    0 references
    55.0 percent
    0 references
    1 June 2020
    0 references
    31 December 2020
    0 references
    Bakondi Autó Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°59'54.89"N, 20°26'3.16"E
    0 references
    A vállalkozás tulajdonosa és egyben ügyvezetője megtette a szükséges projekt előkészítő tevékenységeket. Napelemes rendszert forgalmazó/kivitelező cégekkel tárgyalt, megtörtént az árajánlatok alapján az ártárgyalás valamint a napelemes rendszer és a kivitelező cég kiválasztása. A projekt megvalósítás legfontosabb lépései a következők lesznek: A kivitelezés kezdete 2020.06. hó elején indul. 17.22 kW teljesítményű napelemes rendszer beszerzése és telepítése történik meg Felsőtárkány, Szüret utca 4. sz. alatt. Beszerzésre és üzembe helyezésre kerül 42 db Hyundai 410 W-os HiE-S410SI típusú vagy eé. monokristályos napelem modul, 1 db Fronius Symo 15.0 3 M WLAN (távmonitorozható) inverterrel. A napelem modulok egymással villamosan sorba vannak kapcsolva. Ebből az úgynevezett stringből 3 db kapcsolódik párhuzamosan az inverterre. A napelem modulok névleges árama 10,93 A, amely rövidre zárt kivezetések esetén sem haladja meg az 15 A-t. A napelem modulok névleges feszültsége: 37,5 V DC, (üres járási feszültsége: 45,3 V DC). A Megtörténik a kapcsolódó szerkezeti- és tartóelemek beszerzése és telepítése, az épület elektromos rendszeréhez, ill. a hálózathoz való csatlakozáshoz és a műszakilag biztonságos működéshez szükséges elemek beszerzése és ezek kiépítése, mérő- és szabályozó berendezések beszerzése és felszerelése. A napelemes rendszer a projekt adatlapon megadott megvalósítási helyszínen lévő fejlesztéssel érintett épület tetőszerkezetére kerül elhelyezésre. A menedzsment tagjai jelen projekthez hasonló fejlesztések végrehajtásában jártasságot szereztek. A vállalkozás fejlesztési céljai teljesülnek, mivel megtörténik a havi kiadások szignifikáns mérséklése az energetikai jellemzők javításával, valamint a CO2 terhelés javítása, ÜHG kibocsátás csökkentése, a környezettudatos szemlélet erősítése. A projekt növeli a hazai megújuló energia hasznosítás arányát. (Hungarian)
    0 references
    The company’s owner and manager have undertaken the necessary preparatory activities for the project. Negotiated with companies marketing/completing solar panel systems, price negotiation was made on the basis of the quotes, as well as the selection of the solar panel system and the construction company. The main steps in the implementation of the project will be: The start of construction starts at the beginning of the month of 2020/06. 17.22 kW solar panel system is purchased and installed at 4 Szharet Street, Felsőtárkány. 42 Hyundai 410 W HiE-S410SI or monocrystalline solar modules with 1 Fronius SYMO 15.0 3 M WLAN (remote-monitoring) inverter will be procured and commissioned. Solar modules are electrically connected to each other. 3 of this so-called string are connected to the inverter in parallel. The nominal current of solar modules is 10.93 A, which in the case of short-circuited outlets does not exceed 15 A. The nominal voltage of solar modules is: 37.5 V DC, (empty walking voltage: 45,3 V DC). The purchase and installation of the related structural and support elements, the purchase and installation of the elements necessary for the electrical system of the building and for connection to the network and for technically safe operation, and the purchase and installation of measuring and control equipment. The solar panel system is placed on the roof structure of the building affected by the development on the project data sheet. Management members have gained proficiency in implementing developments similar to those of this project. The company’s development goals are met, as the monthly expenditure is significantly reduced by improving the energy performance, as well as improving CO2 loads, reducing GHG emissions and strengthening the environmentally conscious approach. The project increases the utilisation rate of domestic renewable energy. (English)
    8 February 2022
    0 references
    Felsőtárkány, Heves
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02119
    0 references