Installation of solar system at Dancsi & Partner Ltd. Industrial Park site (Q3935206): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding English translations) |
(Removed claim: summary (P836): As part of the development, the Company would like to install a solar system on the building of the office-kamion washer located at its mako site. The Company intends to carry out the project between 01.07.2020-2022.06.30. The investment activity is not subject to authorisation, the drawings and technical specifications are available. The project involves the installation of a 49,83 kWp solar panel system. The system consists of 1 Kaco bluepla...) |
||||||||||||||
Property / summary | |||||||||||||||
Property / summary: As part of the development, the Company would like to install a solar system on the building of the office-kamion washer located at its mako site. The Company intends to carry out the project between 01.07.2020-2022.06.30. The investment activity is not subject to authorisation, the drawings and technical specifications are available. The project involves the installation of a 49,83 kWp solar panel system. The system consists of 1 Kaco blueplanet 50.0 TL3 inverter of three-phase, 50 kW rated power, and 151 monocrystalline solar modules of type Risen RSM 120-6-330M with a nominal power of 330 Wp with a total surface area of 252.17 m². The system is placed on an aluminium support structure, which can be installed on a flat roof, with high wind load fastening, ideal south orientation and ~30° inclination. The system also includes materials for the electrical installation of cables/wires. The total cost of the project is HUF 16 787 100, of which the aid rate is HUF 9.232 905 and the amount of own resources is HUF 7.554.195. Own resources are at the disposal of the Company. (English) / rank | |||||||||||||||
Property / summary: As part of the development, the Company would like to install a solar system on the building of the office-kamion washer located at its mako site. The Company intends to carry out the project between 01.07.2020-2022.06.30. The investment activity is not subject to authorisation, the drawings and technical specifications are available. The project involves the installation of a 49,83 kWp solar panel system. The system consists of 1 Kaco blueplanet 50.0 TL3 inverter of three-phase, 50 kW rated power, and 151 monocrystalline solar modules of type Risen RSM 120-6-330M with a nominal power of 330 Wp with a total surface area of 252.17 m². The system is placed on an aluminium support structure, which can be installed on a flat roof, with high wind load fastening, ideal south orientation and ~30° inclination. The system also includes materials for the electrical installation of cables/wires. The total cost of the project is HUF 16 787 100, of which the aid rate is HUF 9.232 905 and the amount of own resources is HUF 7.554.195. Own resources are at the disposal of the Company. (English) / qualifier | |||||||||||||||
|
Revision as of 22:02, 8 February 2022
Project Q3935206 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of solar system at Dancsi & Partner Ltd. Industrial Park site |
Project Q3935206 in Hungary |
Statements
16,787,100 forint
0 references
30,522,000.0 forint
0 references
55.0 percent
0 references
1 July 2020
0 references
30 June 2022
0 references
Dancsi & Társa Általános Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A fejlesztés keretében a Társaság a makói telephelyén található iroda-kamionmosó épületére szeretne napelemes rendszert telepíteni. A beruházás kivitelezését a Vállalkozás 2020.07.01-2022.06.30. közötti időtartamban kívánja megvalósítani. A beruházási tevékenység nem engedélyköteles, a tervrajzok, a műszaki leírás rendelkezésre áll. A projekt keretében 49,83 kWp teljesítményű napelemes rendszer telepítése történik meg. A rendszer 1 db háromfázisú, 50 kW névleges teljesítményű Kaco Blueplanet 50.0 TL3 inverterből, továbbá 151 db, 330 Wp névleges teljesítményű, Risen RSM 120-6-330M típusú, monokristályos napelem modulból épül fel, felületük összesen 252,17 m2. A rendszer egyedi kialakítású, lapostetőre telepíthető alumínium tartószerkezetre kerül elhelyezésre, nagy szélterhelésnek is ellenálló rögzítéssel, ideális, déli tájolással és ~30°-os dőlésszöggel. A rendszer részét képezik továbbá kábelek/vezetékek elektromos szereléséhez szükséges anyagok. A projekt összköltsége 16.787.100,- Ft, amelyből a támogatás mértéke 9.232.905,- Ft, az önerő nagysága pedig 7.554.195,- Ft. Az önerő a Vállalkozás rendelkezésére áll. (Hungarian)
0 references
Makó, Csongrád-Csanád
0 references
Identifiers
GINOP-4.1.4-19-2020-02202
0 references