During the preparation of the project, the building’s assessment and energy certification were completed until the submission of the application. The optimal technical content of the development has been defined, the energy and cost implications of which are balanced. Based on the specified technical content, the energy calculation, drawings and technical specifications were prepared for the state and the planned state. A contractor will be involved for the implementation of the project, on the basis of a contract concluded after the invitation to tender. During the implementation of the project, the customer will be represented by the technical inspector Róbert Jánosi. The construction activity to be implemented in the project is as follows: The insulation of the facade of the building is realised by EPS bonding technology. It is also appropriate to carry out thermal insulation of the attic ceiling. All structures of the building, which are considered as doors and windows, are replaced. The building has an outdated heating system that can be operated by burning natural gas and partly heating oil, and it is justified to replace this completely. As a result of the optimisation of the design phase, natural gas condensation boilers will be installed. As part of the project, a solar system with a power of 6.6 kWp will be installed on the roof of the building. Planned date of conclusion of the contractor’s contract and delivery of the work area: 2021.03.01. In the course of the planned development, materials and structures are selected from available and affordable, commercially available alternatives, with the aim of bringing the building to a specific energy state at the time of designing the project. The project enables the company to provide its tenants with a building that can be operated with a minimum energy input and in a way that is as low as possible on the environment. The applicant has appropriate years of experience in building operation, real estate investment and in managing projects implemented with a grant. It has the necessary resources, both human and relationship capital are provided for the successful implementation of the project. (English)
Property / summary: During the preparation of the project, the building’s assessment and energy certification were completed until the submission of the application. The optimal technical content of the development has been defined, the energy and cost implications of which are balanced. Based on the specified technical content, the energy calculation, drawings and technical specifications were prepared for the state and the planned state. A contractor will be involved for the implementation of the project, on the basis of a contract concluded after the invitation to tender. During the implementation of the project, the customer will be represented by the technical inspector Róbert Jánosi. The construction activity to be implemented in the project is as follows: The insulation of the facade of the building is realised by EPS bonding technology. It is also appropriate to carry out thermal insulation of the attic ceiling. All structures of the building, which are considered as doors and windows, are replaced. The building has an outdated heating system that can be operated by burning natural gas and partly heating oil, and it is justified to replace this completely. As a result of the optimisation of the design phase, natural gas condensation boilers will be installed. As part of the project, a solar system with a power of 6.6 kWp will be installed on the roof of the building. Planned date of conclusion of the contractor’s contract and delivery of the work area: 2021.03.01. In the course of the planned development, materials and structures are selected from available and affordable, commercially available alternatives, with the aim of bringing the building to a specific energy state at the time of designing the project. The project enables the company to provide its tenants with a building that can be operated with a minimum energy input and in a way that is as low as possible on the environment. The applicant has appropriate years of experience in building operation, real estate investment and in managing projects implemented with a grant. It has the necessary resources, both human and relationship capital are provided for the successful implementation of the project. (English) / rank
 
Normal rank
Property / summary: During the preparation of the project, the building’s assessment and energy certification were completed until the submission of the application. The optimal technical content of the development has been defined, the energy and cost implications of which are balanced. Based on the specified technical content, the energy calculation, drawings and technical specifications were prepared for the state and the planned state. A contractor will be involved for the implementation of the project, on the basis of a contract concluded after the invitation to tender. During the implementation of the project, the customer will be represented by the technical inspector Róbert Jánosi. The construction activity to be implemented in the project is as follows: The insulation of the facade of the building is realised by EPS bonding technology. It is also appropriate to carry out thermal insulation of the attic ceiling. All structures of the building, which are considered as doors and windows, are replaced. The building has an outdated heating system that can be operated by burning natural gas and partly heating oil, and it is justified to replace this completely. As a result of the optimisation of the design phase, natural gas condensation boilers will be installed. As part of the project, a solar system with a power of 6.6 kWp will be installed on the roof of the building. Planned date of conclusion of the contractor’s contract and delivery of the work area: 2021.03.01. In the course of the planned development, materials and structures are selected from available and affordable, commercially available alternatives, with the aim of bringing the building to a specific energy state at the time of designing the project. The project enables the company to provide its tenants with a building that can be operated with a minimum energy input and in a way that is as low as possible on the environment. The applicant has appropriate years of experience in building operation, real estate investment and in managing projects implemented with a grant. It has the necessary resources, both human and relationship capital are provided for the successful implementation of the project. (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:02, 8 February 2022

Project Q3936159 in Hungary
Language Label Description Also known as
English
Complex energy modernisation of Derecske Coop Zrt. On its buildings — Central office with old wing
Project Q3936159 in Hungary

    Statements

    0 references
    28,720,532 forint
    0 references
    79,418.30 Euro
    0.00276521 Euro
    4 December 2021
    0 references
    142,747.603 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    52,219,149.091 forint
    0 references
    54.999998 percent
    0 references
    1 March 2021
    0 references
    30 July 2022
    0 references
    Derecske-COOP Kereskedelmi és Szolgáltató Zártkörűen Működő Részvénytársaság
    0 references
    0 references

    47°20'10.68"N, 21°32'3.91"E
    0 references
    A projekt előkészítése során a pályázat benyújtásáig elkészült az épület felmérése, energetikai tanúsítása. Meghatározásra került a fejlesztés optimális műszaki tartalma, aminek energetikai és költség vonzatai is egyensúlyban vannak. A meghatározott műszaki tartalom alapján elkészült a közte és tervezett állapotra vonatkozó energetikai számítás, valamint tervrajzok és műszaki leírás. A projekt megvalósítására egy kivitelező kerül bevonásra, az ajánlatok bekérését követően megkötött szerződés alapján. A projekt megvalósítása során a megrendelőt Jánosi Róbert műszaki ellenőr fogja képviselni. A projektben megvalósítani kívánt építési tevékenység a következő: Az épület homlokzatának szigetelése EPS ragasztásos technológiával valósul meg. Szintén indokolt a padlásfödém hőszigetelésének elvégzése. Az épület valamennyi nyílászzárónak minősülő szerkezete cserére kerül. Az épület korszerűtlen részben földgáz, részben fűtőolaj égestésével működtethető fűtési rendszerrel rendelkezik, ennek a teljes cseréje indokolt. A tervezési szakasz optimalizálása eredményeként földgáz üzemű kondenzációs kazán kerül telepítésre. A projekt részeként 6,6 kWp teljesítményű napelemes rendszer kerül telepítésre az épület tetején. A kivitelezői szerződés megkötésének és a munkaterület átadásának tervezett dátuma: 2021.03.01. A tervezett fejlesztés során beépítésre anyagok és szerkezetek a korunk elérhető és megfizethető, a kereskedelmi forgalomban általában megtalálható alternatívákból kerülnek kiválasztásra, azzal a céllal, hogy a projekt tervezésekor meghatározott energetikai állapotba kerüljön az épület. a meghatározott indikátorok teljesüljenek. A projekt által a vállalkozás olyan épületet tud biztosítani a bérlőinek, amely minimális energiaráfordítással, a környezetet a lehető legkisebb mértékben terhelő módon üzemeltethető. A pályázó megfelelő, több éves tapasztalatokkal rendelkezik épület üzemeltetés, ingatlan beruházás területén, továbbá pályázati támogatással megvalósított projektek menedzselésében is. A szükséges erőforrásokkal rendelkezik, mind a humánerő, mind a kapcsolati tőke biztosított a projekt sikeres lebonyolításához. (Hungarian)
    0 references
    During the preparation of the project, the building’s assessment and energy certification were completed until the submission of the application. The optimal technical content of the development has been defined, the energy and cost implications of which are balanced. Based on the specified technical content, the energy calculation, drawings and technical specifications were prepared for the state and the planned state. A contractor will be involved for the implementation of the project, on the basis of a contract concluded after the invitation to tender. During the implementation of the project, the customer will be represented by the technical inspector Róbert Jánosi. The construction activity to be implemented in the project is as follows: The insulation of the facade of the building is realised by EPS bonding technology. It is also appropriate to carry out thermal insulation of the attic ceiling. All structures of the building, which are considered as doors and windows, are replaced. The building has an outdated heating system that can be operated by burning natural gas and partly heating oil, and it is justified to replace this completely. As a result of the optimisation of the design phase, natural gas condensation boilers will be installed. As part of the project, a solar system with a power of 6.6 kWp will be installed on the roof of the building. Planned date of conclusion of the contractor’s contract and delivery of the work area: 2021.03.01. In the course of the planned development, materials and structures are selected from available and affordable, commercially available alternatives, with the aim of bringing the building to a specific energy state at the time of designing the project. The project enables the company to provide its tenants with a building that can be operated with a minimum energy input and in a way that is as low as possible on the environment. The applicant has appropriate years of experience in building operation, real estate investment and in managing projects implemented with a grant. It has the necessary resources, both human and relationship capital are provided for the successful implementation of the project. (English)
    8 February 2022
    0 references
    Derecske, Hajdú-Bihar
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-03478
    0 references