Improving energy efficiency at KORDEM-AGRO Kft. (Q3935369): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): Within the framework of the project, improvements are carried out which are not required to build a building permit. The carrying out of an environmental impact assessment and permit planning documents are not relevant. Since the works activity is not subject to a building permit, only the annexes to be attached to the tender will be submitted according to the works not subject to authorisation. An implementation plan will be drawn up before t...)
(‎Changed an Item: Adding English translations)
Property / summary
 
Within the framework of the project, improvements are carried out which are not required to build a building permit. The carrying out of an environmental impact assessment and permit planning documents are not relevant. Since the works activity is not subject to a building permit, only the annexes to be attached to the tender will be submitted according to the works not subject to authorisation. An implementation plan will be drawn up before the start of the project. The certified energy certificate for the initial state, the intermediate pre-certificates for the planned state will be submitted to the application. Energy audit report is not relevant for this project. For the implementation of the project, experts are used by the applicant, including the management members’ proficiency and experience, the application of the tevékenységek:Hőszivattyú systems designed in the project for heating: 2pcs Belaria SRM(16) type heat pump is purchased.The inverter outdoor unit of heat pumps, equipped with injection compressor. Thanks to this, it does not require any electrical additional heating or requires minimal heating, as its heating capacity is preserved even in case of higher colds! The air heat pump consists of two main parts: an outdoor unit and an indoor unit. Alfea Extensa technical leírása:Akár 4.52 COP (+ 7°/+ 35)° characteristic area of use: with low temperature heat take-off device (surface heating/cooling, radiators, fan coils) Intuitive interface and simplified use,NAVISTEM 400S controller, Buffer tank built-in 16 litres, patented coaxial heat exchanger, Inverter control, Multiple heating zones, treatment options from the heat pump control panel.The heat pump external temperature is 30 % up to 0 °C, works as a heat generator with low temperature radiators and fan-coil cooling system, thermostatic valves.Replacement of light sources, lighting bodies, ballasts: Improvement of the thermal equipment of buildings, reduction of heat loss, thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces, floor insulation, horizontal thermal insulation plate KGY on 273,76 square meters, facade thermal insulation of polystyrene foam plate (vertical EPS 15 cm) 260 square meters. The replacement of building envelopes that are considered as doors and windows separating heated and unheated spaces/replacement of building envelopes with energy savings will take place on 17,94 square metres, and the electrical sectional industrial gate will be replaced on 24 m². The light sources are installed on 273.76 m² with modern, energy-saving LED light sources. Modernisation of heating, cooling and HMV systems in buildings: FixTrend Steel Plate Radiator Compact and 6-point finish.High heat take-off according to DIN EN 442 specification.FIX-white colour (corresponding to RAL9010. Installation of solar system, 53 pcs Eurener Turbo 320 W module Fronius SYMO 15.0-3-M Photovoltaic Solar Modules: 53pcsType(manufacturer): Eurener Turbo 320That: 320 WSise: 1.64 m x 0.992 m Inverter 1pcs Type (manufacturer): Fronius SYMO 15.0-3-M is fed back to the power grid. Between 15 and 50 kWp, it is expected to generate 18656 KWh of energy per year. The site of built-in power (taking into account the solar map) is located in one of the sunniest areas of our country.1295-1310KWh/m² is the annual irradiation, which makes the return more favourable. In the budget, (English)
Property / summary: Within the framework of the project, improvements are carried out which are not required to build a building permit. The carrying out of an environmental impact assessment and permit planning documents are not relevant. Since the works activity is not subject to a building permit, only the annexes to be attached to the tender will be submitted according to the works not subject to authorisation. An implementation plan will be drawn up before the start of the project. The certified energy certificate for the initial state, the intermediate pre-certificates for the planned state will be submitted to the application. Energy audit report is not relevant for this project. For the implementation of the project, experts are used by the applicant, including the management members’ proficiency and experience, the application of the tevékenységek:Hőszivattyú systems designed in the project for heating: 2pcs Belaria SRM(16) type heat pump is purchased.The inverter outdoor unit of heat pumps, equipped with injection compressor. Thanks to this, it does not require any electrical additional heating or requires minimal heating, as its heating capacity is preserved even in case of higher colds! The air heat pump consists of two main parts: an outdoor unit and an indoor unit. Alfea Extensa technical leírása:Akár 4.52 COP (+ 7°/+ 35)° characteristic area of use: with low temperature heat take-off device (surface heating/cooling, radiators, fan coils) Intuitive interface and simplified use,NAVISTEM 400S controller, Buffer tank built-in 16 litres, patented coaxial heat exchanger, Inverter control, Multiple heating zones, treatment options from the heat pump control panel.The heat pump external temperature is 30 % up to 0 °C, works as a heat generator with low temperature radiators and fan-coil cooling system, thermostatic valves.Replacement of light sources, lighting bodies, ballasts: Improvement of the thermal equipment of buildings, reduction of heat loss, thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces, floor insulation, horizontal thermal insulation plate KGY on 273,76 square meters, facade thermal insulation of polystyrene foam plate (vertical EPS 15 cm) 260 square meters. The replacement of building envelopes that are considered as doors and windows separating heated and unheated spaces/replacement of building envelopes with energy savings will take place on 17,94 square metres, and the electrical sectional industrial gate will be replaced on 24 m². The light sources are installed on 273.76 m² with modern, energy-saving LED light sources. Modernisation of heating, cooling and HMV systems in buildings: FixTrend Steel Plate Radiator Compact and 6-point finish.High heat take-off according to DIN EN 442 specification.FIX-white colour (corresponding to RAL9010. Installation of solar system, 53 pcs Eurener Turbo 320 W module Fronius SYMO 15.0-3-M Photovoltaic Solar Modules: 53pcsType(manufacturer): Eurener Turbo 320That: 320 WSise: 1.64 m x 0.992 m Inverter 1pcs Type (manufacturer): Fronius SYMO 15.0-3-M is fed back to the power grid. Between 15 and 50 kWp, it is expected to generate 18656 KWh of energy per year. The site of built-in power (taking into account the solar map) is located in one of the sunniest areas of our country.1295-1310KWh/m² is the annual irradiation, which makes the return more favourable. In the budget, (English) / rank
 
Normal rank
Property / summary: Within the framework of the project, improvements are carried out which are not required to build a building permit. The carrying out of an environmental impact assessment and permit planning documents are not relevant. Since the works activity is not subject to a building permit, only the annexes to be attached to the tender will be submitted according to the works not subject to authorisation. An implementation plan will be drawn up before the start of the project. The certified energy certificate for the initial state, the intermediate pre-certificates for the planned state will be submitted to the application. Energy audit report is not relevant for this project. For the implementation of the project, experts are used by the applicant, including the management members’ proficiency and experience, the application of the tevékenységek:Hőszivattyú systems designed in the project for heating: 2pcs Belaria SRM(16) type heat pump is purchased.The inverter outdoor unit of heat pumps, equipped with injection compressor. Thanks to this, it does not require any electrical additional heating or requires minimal heating, as its heating capacity is preserved even in case of higher colds! The air heat pump consists of two main parts: an outdoor unit and an indoor unit. Alfea Extensa technical leírása:Akár 4.52 COP (+ 7°/+ 35)° characteristic area of use: with low temperature heat take-off device (surface heating/cooling, radiators, fan coils) Intuitive interface and simplified use,NAVISTEM 400S controller, Buffer tank built-in 16 litres, patented coaxial heat exchanger, Inverter control, Multiple heating zones, treatment options from the heat pump control panel.The heat pump external temperature is 30 % up to 0 °C, works as a heat generator with low temperature radiators and fan-coil cooling system, thermostatic valves.Replacement of light sources, lighting bodies, ballasts: Improvement of the thermal equipment of buildings, reduction of heat loss, thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces, floor insulation, horizontal thermal insulation plate KGY on 273,76 square meters, facade thermal insulation of polystyrene foam plate (vertical EPS 15 cm) 260 square meters. The replacement of building envelopes that are considered as doors and windows separating heated and unheated spaces/replacement of building envelopes with energy savings will take place on 17,94 square metres, and the electrical sectional industrial gate will be replaced on 24 m². The light sources are installed on 273.76 m² with modern, energy-saving LED light sources. Modernisation of heating, cooling and HMV systems in buildings: FixTrend Steel Plate Radiator Compact and 6-point finish.High heat take-off according to DIN EN 442 specification.FIX-white colour (corresponding to RAL9010. Installation of solar system, 53 pcs Eurener Turbo 320 W module Fronius SYMO 15.0-3-M Photovoltaic Solar Modules: 53pcsType(manufacturer): Eurener Turbo 320That: 320 WSise: 1.64 m x 0.992 m Inverter 1pcs Type (manufacturer): Fronius SYMO 15.0-3-M is fed back to the power grid. Between 15 and 50 kWp, it is expected to generate 18656 KWh of energy per year. The site of built-in power (taking into account the solar map) is located in one of the sunniest areas of our country.1295-1310KWh/m² is the annual irradiation, which makes the return more favourable. In the budget, (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:00, 8 February 2022

Project Q3935369 in Hungary
Language Label Description Also known as
English
Improving energy efficiency at KORDEM-AGRO Kft.
Project Q3935369 in Hungary

    Statements

    0 references
    0 references
    30,847,303 forint
    0 references
    85,299.27 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    153,318.14 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    56,086,005.455 forint
    0 references
    54.999998 percent
    0 references
    1 August 2020
    0 references
    31 August 2021
    0 references
    KORDEM-AGRO Növénytermelési Szolgáltató Tanácsadó és Kereskedelmi Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°35'59.57"N, 20°16'28.31"E
    0 references
    A projekt keretében olyan fejlesztések valósulnak meg, melyek nem építési engedély kötelesek. Környezeti hatásvizsgálat lefolytatása és az engedélyezési tervdokumentumok nem relevánsak. Mivel nem építési engedély köteles beruházási tevékenységről van szó, a pályázathoz csak a Pályázati Felhívás csatolandó mellékletek nem engedélyköteles beruházás szerinti dokumentumok kerülnek benyújtásra. Kiviteli terv a projekt megkezdését megelőzően készül el. A kiinduló állapotra vonatkozó hitelesített energetikai tanúsítvány, a köztes, a tervezett állapotra vonatkozó előtanúsítványok a pályázathoz benyújtásra kerülnek. Energetikai auditjelentés jelen projekt esetén nem releváns. A projekt megvalósításához szakembereket vesz igénybe a pályázó, így a menedzsment tagjainak jártassága, tapasztalata magasan képzett, A projektben tervezett tevékenységek:Hőszivattyú rendszerek alkalmazása fűtésre: 2db Belaria SRM(16 ) típusú hőszivattyú kerül beszerzésre.A hőszivattyúk inverteres kültéri egysége, befecskendezős kompresszorral szerelt. Ennek köszönhetően elektromos kiegészítő fűtést egyáltalán nem, vagy minimális mértékben igényel, ugyanis fűtőteljesítménye még nagyobb hideg esetén is megmarad! A levegős hőszivattyú két fő részből áll: egy kültéri és egy beltéri egységből. Alfea Extensa műszaki leírása:Akár 4.52 COP (+7°/+35)°jellemző felhasználási terület: alacsony hőmérsékletű hőleadó berendezéssel (felületfűtés/hűtés, radiátorok, fan coilok) Intuitív kezelőfelület és egyszerűsített használat,NAVISTEM 400S szabályzó, Beépített 16 literes puffertartály, Szabadalmaztatott koaxiális hőcserélő, Inverter szabályzás,Több fűtési zóna,kezelési lehetőség a hőszivattyú vezérlőpaneljéről.A hőszivattyú külső hőmérséklet 0°C-ig 30%-ban, működik hőtermelőként alacsony hőmérsékletre méretezett radiátorokkal és fan-coil hűtő fűtő rendszerrel, termosztatikus szelepekkel.Fényforrások, világítótestek, előtétek cseréje: Az épületek hőtechnikai adottságainak javítása, hőveszteségének csökkentése,fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése, födém szigetelést, vízszintes KGY hőszigetelő lemez 273,76 négyzetméteren, a homlokzati hőszigetelést polisztirolhab lemez (függőleges EPS 15 cm) 260 négyzetméter valósítja meg a kft. A fűtött és fűtetlen teret elválasztó, nyílászáró szerkezetnek minősülő épülethatároló szerkezetek cseréje/energia-megtakarítást eredményező korszerűsítése a műanyag nyílászáró csere 17,94 négyzetméter, valamint az elektromos szekcionált ipari kapu cseréje 24 négyzetméteren fog történni. A fényforrások modern,energiatakarékos LED fényforrások beszerelésével 273,76 m2-en történnek. Épületek fűtési, hűtési, HMV-rendszereinek korszerűsítése: FixTrend Acéllemez lapradiátor Kompakt és 6 pontos kivitel.Magas hőleadó képesség a DIN EN 442 előírásnak megfelelően.FIX-fehér szín ( RAL9010-nek megfelelő. Napelemes rendszer telepítése, 53 db Eurener Turbo 320W-os modul Fronius Symo 15.0-3-M Fotovoltaikus napelem modulok: 53dbTípus (gyártó): Eurener Turbo 320Telj.: 320 WMéret: 1,64 m x 0,992m Inverter 1db Típus (gyártó): Fronius Symo 15.0-3-M inverteren keresztül tápláljuk vissza a villamos hálózatba. A 15 és 50 kWp névleges teljesítmény között évente várhatóan 18656 KWh energiát fog termelni. A beépített teljesítmény helyszíne (figyelembe véve a Naptérképet)hazánk egyik legnaposabb területén fekszik.1295-1310KWh/m2 az éves besugárzás,ami kedvezőbbé teszi a megtérülési. A költségvetésbe betervezett, a (Hungarian)
    0 references
    Within the framework of the project, improvements are carried out which are not required to build a building permit. The carrying out of an environmental impact assessment and permit planning documents are not relevant. Since the works activity is not subject to a building permit, only the annexes to be attached to the tender will be submitted according to the works not subject to authorisation. An implementation plan will be drawn up before the start of the project. The certified energy certificate for the initial state, the intermediate pre-certificates for the planned state will be submitted to the application. Energy audit report is not relevant for this project. For the implementation of the project, experts are used by the applicant, including the management members’ proficiency and experience, the application of the tevékenységek:Hőszivattyú systems designed in the project for heating: 2pcs Belaria SRM(16) type heat pump is purchased.The inverter outdoor unit of heat pumps, equipped with injection compressor. Thanks to this, it does not require any electrical additional heating or requires minimal heating, as its heating capacity is preserved even in case of higher colds! The air heat pump consists of two main parts: an outdoor unit and an indoor unit. Alfea Extensa technical leírása:Akár 4.52 COP (+ 7°/+ 35)° characteristic area of use: with low temperature heat take-off device (surface heating/cooling, radiators, fan coils) Intuitive interface and simplified use,NAVISTEM 400S controller, Buffer tank built-in 16 litres, patented coaxial heat exchanger, Inverter control, Multiple heating zones, treatment options from the heat pump control panel.The heat pump external temperature is 30 % up to 0 °C, works as a heat generator with low temperature radiators and fan-coil cooling system, thermostatic valves.Replacement of light sources, lighting bodies, ballasts: Improvement of the thermal equipment of buildings, reduction of heat loss, thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces, floor insulation, horizontal thermal insulation plate KGY on 273,76 square meters, facade thermal insulation of polystyrene foam plate (vertical EPS 15 cm) 260 square meters. The replacement of building envelopes that are considered as doors and windows separating heated and unheated spaces/replacement of building envelopes with energy savings will take place on 17,94 square metres, and the electrical sectional industrial gate will be replaced on 24 m². The light sources are installed on 273.76 m² with modern, energy-saving LED light sources. Modernisation of heating, cooling and HMV systems in buildings: FixTrend Steel Plate Radiator Compact and 6-point finish.High heat take-off according to DIN EN 442 specification.FIX-white colour (corresponding to RAL9010. Installation of solar system, 53 pcs Eurener Turbo 320 W module Fronius SYMO 15.0-3-M Photovoltaic Solar Modules: 53pcsType(manufacturer): Eurener Turbo 320That: 320 WSise: 1.64 m x 0.992 m Inverter 1pcs Type (manufacturer): Fronius SYMO 15.0-3-M is fed back to the power grid. Between 15 and 50 kWp, it is expected to generate 18656 KWh of energy per year. The site of built-in power (taking into account the solar map) is located in one of the sunniest areas of our country.1295-1310KWh/m² is the annual irradiation, which makes the return more favourable. In the budget, (English)
    8 February 2022
    0 references
    Heves, Heves
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02439
    0 references