1. Architecture The facade of the building is equipped with dryvit thermal insulation. The thickness of the Austrotherm AT-H80 thermal insulation tiles on the façade is 150 mm, which is attached exactly to the wall structure. The plinth receives a 150 mm thick EPS thermal insulation (Austrotherm Expert Fix). Austrotherm AT-N100 EPS thermal insulation plate is placed on the upper plane of the slab. The pedestal wall of the overlighter is thermally insulated, the dryvit system of thermal insulation on the outer plane of the wall is 200 mm vtg. Austrotherm Expert Fix thermal insulation plate is applied. The upper plane is equipped with a cavity-chamber polycarbonate overlighter, with a semi-screw top design with a thickness of 25 mm. The doors and windows of the building are opened (steel doors and windows, copolit glass). The new plastic doors and windows will then be installed in accordance with the design documentation. The existing industrial gate will be replaced by HÖRMANN sectional garage door. Thermal insulation is installed on the inner and upper planes of the attic wall with a thickness of 150 mm. 2. Solar system: The conditions for the deployment of the system are met. 48 modules are placed on the roof of the building. 60 cell monocrystalline modules with aluminium frame, 3.2 mm iron-free hardened solar glass, EVA filling, IP65 connector box, solar wire, solar connectors. Designed panel: Risen RSM60-6-310M. Support structure: Stainless steel and aluminium lightweight duct system with connecting elements, for fitting to the PV-generator arrangement, partly with scaffolding and partly parallel to the roof plane. Inverter: 1 (FRONIUS SYMO 12.5.0-3-M) three-phase 400/3x230V, operating in synchronous operation with 50 Hz network, with Wi-Fi module. 3. Engineering The building is converted into an internal gas supply. The pipeline gas supply was previously installed in the building. Existing gas appliances and pipelines will be decommissioned. The measured low-pressure wire material to be installed is a standard seamless steel tube. Types of previous gas appliances: • 12 PAKOLE GH11 gas infrared • 8 PAKOLE GH18 gas infrared • 2pcs PAKOLE GH7 gas infrared Types of equipment: • 4 PAKOLE GH7 gas infra-fra PAKOLE GTV-E-40A 3P Natural gas fuelled closed fronted air heaters. IP21 CE1008CQ2928 • 1 PAKOLE GH7 gas infrared PAKOLE GTV-E-40A 3P Natural gas-fuelled closed fronted air heater. IP21 CE1008CQ2928 (English)
Property / summary: 1. Architecture The facade of the building is equipped with dryvit thermal insulation. The thickness of the Austrotherm AT-H80 thermal insulation tiles on the façade is 150 mm, which is attached exactly to the wall structure. The plinth receives a 150 mm thick EPS thermal insulation (Austrotherm Expert Fix). Austrotherm AT-N100 EPS thermal insulation plate is placed on the upper plane of the slab. The pedestal wall of the overlighter is thermally insulated, the dryvit system of thermal insulation on the outer plane of the wall is 200 mm vtg. Austrotherm Expert Fix thermal insulation plate is applied. The upper plane is equipped with a cavity-chamber polycarbonate overlighter, with a semi-screw top design with a thickness of 25 mm. The doors and windows of the building are opened (steel doors and windows, copolit glass). The new plastic doors and windows will then be installed in accordance with the design documentation. The existing industrial gate will be replaced by HÖRMANN sectional garage door. Thermal insulation is installed on the inner and upper planes of the attic wall with a thickness of 150 mm. 2. Solar system: The conditions for the deployment of the system are met. 48 modules are placed on the roof of the building. 60 cell monocrystalline modules with aluminium frame, 3.2 mm iron-free hardened solar glass, EVA filling, IP65 connector box, solar wire, solar connectors. Designed panel: Risen RSM60-6-310M. Support structure: Stainless steel and aluminium lightweight duct system with connecting elements, for fitting to the PV-generator arrangement, partly with scaffolding and partly parallel to the roof plane. Inverter: 1 (FRONIUS SYMO 12.5.0-3-M) three-phase 400/3x230V, operating in synchronous operation with 50 Hz network, with Wi-Fi module. 3. Engineering The building is converted into an internal gas supply. The pipeline gas supply was previously installed in the building. Existing gas appliances and pipelines will be decommissioned. The measured low-pressure wire material to be installed is a standard seamless steel tube. Types of previous gas appliances: • 12 PAKOLE GH11 gas infrared • 8 PAKOLE GH18 gas infrared • 2pcs PAKOLE GH7 gas infrared Types of equipment: • 4 PAKOLE GH7 gas infra-fra PAKOLE GTV-E-40A 3P Natural gas fuelled closed fronted air heaters. IP21 CE1008CQ2928 • 1 PAKOLE GH7 gas infrared PAKOLE GTV-E-40A 3P Natural gas-fuelled closed fronted air heater. IP21 CE1008CQ2928 (English) / rank
 
Normal rank
Property / summary: 1. Architecture The facade of the building is equipped with dryvit thermal insulation. The thickness of the Austrotherm AT-H80 thermal insulation tiles on the façade is 150 mm, which is attached exactly to the wall structure. The plinth receives a 150 mm thick EPS thermal insulation (Austrotherm Expert Fix). Austrotherm AT-N100 EPS thermal insulation plate is placed on the upper plane of the slab. The pedestal wall of the overlighter is thermally insulated, the dryvit system of thermal insulation on the outer plane of the wall is 200 mm vtg. Austrotherm Expert Fix thermal insulation plate is applied. The upper plane is equipped with a cavity-chamber polycarbonate overlighter, with a semi-screw top design with a thickness of 25 mm. The doors and windows of the building are opened (steel doors and windows, copolit glass). The new plastic doors and windows will then be installed in accordance with the design documentation. The existing industrial gate will be replaced by HÖRMANN sectional garage door. Thermal insulation is installed on the inner and upper planes of the attic wall with a thickness of 150 mm. 2. Solar system: The conditions for the deployment of the system are met. 48 modules are placed on the roof of the building. 60 cell monocrystalline modules with aluminium frame, 3.2 mm iron-free hardened solar glass, EVA filling, IP65 connector box, solar wire, solar connectors. Designed panel: Risen RSM60-6-310M. Support structure: Stainless steel and aluminium lightweight duct system with connecting elements, for fitting to the PV-generator arrangement, partly with scaffolding and partly parallel to the roof plane. Inverter: 1 (FRONIUS SYMO 12.5.0-3-M) three-phase 400/3x230V, operating in synchronous operation with 50 Hz network, with Wi-Fi module. 3. Engineering The building is converted into an internal gas supply. The pipeline gas supply was previously installed in the building. Existing gas appliances and pipelines will be decommissioned. The measured low-pressure wire material to be installed is a standard seamless steel tube. Types of previous gas appliances: • 12 PAKOLE GH11 gas infrared • 8 PAKOLE GH18 gas infrared • 2pcs PAKOLE GH7 gas infrared Types of equipment: • 4 PAKOLE GH7 gas infra-fra PAKOLE GTV-E-40A 3P Natural gas fuelled closed fronted air heaters. IP21 CE1008CQ2928 • 1 PAKOLE GH7 gas infrared PAKOLE GTV-E-40A 3P Natural gas-fuelled closed fronted air heater. IP21 CE1008CQ2928 (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:55, 8 February 2022

Project Q3935682 in Hungary
Language Label Description Also known as
English
Building energy development using renewable energy at METALLUX Zrt.
Project Q3935682 in Hungary

    Statements

    0 references
    0 references
    117,072,470 forint
    0 references
    323,729.96 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    581,876.911 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    212,859,036.364 forint
    0 references
    55.0 percent
    0 references
    1 December 2020
    0 references
    30 September 2022
    0 references
    METALLUX Galvanizáló és Szennyvízkezelő Berendezéseket Gyártó Zárkörűen Működő Részvénytársaság
    0 references
    0 references

    46°15'59.08"N, 17°5'34.58"E
    0 references
    1. Építészet Az épület homlokzatán dryvit rendszerű hőszigetelés készül. Az AUSTROTHERM AT-H80 hőszigetelő lapok vastagsága a homlokzaton 150 mm, melyet pontszerűen rögzítenek a falszerkezethez. A lábazat 150 mm vastagságú formahabosított EPS hőszigetelést (AUSTROTHERM Expert Fix) kap. A födém felső síkjára AUSTROTHERM AT-N100 EPS hőszigetelő lemez kerül. A felülvilágító lábazati fala hőszigetelésre kerül, a falának külső síkjára dryvit rendszerű hőszigetelés 200 mm vtg. AUSTROTHERM Expert Fix hőszigetelő lemez kerül felvitelre. A felső síkon üregkamrás POLIKARBONÁT felülvilágítót építenek be, félnyeregtetős kialakítással, 25 mm vastagsággal. Az épület homlokzati nyílászáróit kibontásra kerülnek (acél szerkezetű nyílászárók, kopolit üveg). Ezt követően beépítésre kerülnek az új műanyag szerkezetű nyílászárók a tervdokumentációnak megfelelően. A meglévő ipari kapu kicserélésre kerül HÖRMANN szekcionált garázskapura. Az attikafal belső és felső síkján hőszigetelést építenek be, melynek vastagsága 150 mm. 2. Napelemes rendszer: A rendszer kiépítésének feltételei adottak. Az épület tetejére 48 db, modul kerül elhelyezésre. 60 cellás, monokristályos modulok alu keretben, 3,2 mm vasmentes edzett szolárüveggel, EVA kitöltéssel, IP65-ös csatlakozó dobozzal, szolár vezetékkel, szolár csatlakozókkal. Tervezett panel: Risen RSM60-6-310M. Tartószerkezet: Rozsdamentes acél és alumíniumból készült könnyűszerkezetű alépítmény rendszer csatlakozó elemekkel, a PV-generátor elrendezéséhez illesztett, részben állványos, részben tetősíkkal párhuzamos szereléshez. Inverter: 1 db (FRONIUS SYMO 12.5.0-3-M) háromfázisú 400/3x230V, 50Hz hálózattal szinkron üzemben működő, wifi modullal rendelkező inver. 3. Gépészet Az épület belső gázellátáas átalakításra kerül. Az épületben korábban kiépítésre került a vezetékes gázellátás. A meglévő gázkészülékek és gázvezetékek visszabontásra kerül. A beépítésre kerülő mért kisnyomású vezeték anyaga szabvány szerinti varrat nélküli acélcső. Korábbi gázkészülékek típusai: • 12 db Pakole GH11 gázinfra • 8 db Pakole GH18 gázinfra • 2db Pakole GH7 gázinfra Betervezett berendezések típusai: • 4 db Pakole GH7 gázinfra Pakole GTV-E-40A 3P Földgáz üzemű zárt égésterű hőlégfúvó. IP21 CE1008CQ2928 • 1 db Pakole GH7 gázinfra Pakole GTV-E-40A 3P Földgáz üzemű zárt égésterű hőlégfúvó. IP21 CE1008CQ2928 (Hungarian)
    0 references
    1. Architecture The facade of the building is equipped with dryvit thermal insulation. The thickness of the Austrotherm AT-H80 thermal insulation tiles on the façade is 150 mm, which is attached exactly to the wall structure. The plinth receives a 150 mm thick EPS thermal insulation (Austrotherm Expert Fix). Austrotherm AT-N100 EPS thermal insulation plate is placed on the upper plane of the slab. The pedestal wall of the overlighter is thermally insulated, the dryvit system of thermal insulation on the outer plane of the wall is 200 mm vtg. Austrotherm Expert Fix thermal insulation plate is applied. The upper plane is equipped with a cavity-chamber polycarbonate overlighter, with a semi-screw top design with a thickness of 25 mm. The doors and windows of the building are opened (steel doors and windows, copolit glass). The new plastic doors and windows will then be installed in accordance with the design documentation. The existing industrial gate will be replaced by HÖRMANN sectional garage door. Thermal insulation is installed on the inner and upper planes of the attic wall with a thickness of 150 mm. 2. Solar system: The conditions for the deployment of the system are met. 48 modules are placed on the roof of the building. 60 cell monocrystalline modules with aluminium frame, 3.2 mm iron-free hardened solar glass, EVA filling, IP65 connector box, solar wire, solar connectors. Designed panel: Risen RSM60-6-310M. Support structure: Stainless steel and aluminium lightweight duct system with connecting elements, for fitting to the PV-generator arrangement, partly with scaffolding and partly parallel to the roof plane. Inverter: 1 (FRONIUS SYMO 12.5.0-3-M) three-phase 400/3x230V, operating in synchronous operation with 50 Hz network, with Wi-Fi module. 3. Engineering The building is converted into an internal gas supply. The pipeline gas supply was previously installed in the building. Existing gas appliances and pipelines will be decommissioned. The measured low-pressure wire material to be installed is a standard seamless steel tube. Types of previous gas appliances: • 12 PAKOLE GH11 gas infrared • 8 PAKOLE GH18 gas infrared • 2pcs PAKOLE GH7 gas infrared Types of equipment: • 4 PAKOLE GH7 gas infra-fra PAKOLE GTV-E-40A 3P Natural gas fuelled closed fronted air heaters. IP21 CE1008CQ2928 • 1 PAKOLE GH7 gas infrared PAKOLE GTV-E-40A 3P Natural gas-fuelled closed fronted air heater. IP21 CE1008CQ2928 (English)
    8 February 2022
    0 references
    Csurgó, Somogy
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02841