Energy-saving developments with the introduction of renewable energy at Kristóf Car House (Q3934676): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
The aim of the project is to fully cover the existing energy consumption of our company’s premises from solar systems. In this case, the building’s electrical power will be supplied by 155 polycrystalline solar panels of 300 W. The total power of the solar system to be installed is 46,5 kWp, which will generate around 49 290 kWh/year of electricity per year, taking into account local conditions and shade-free conditions, taking into account the building’s characteristics and geographical location. The ampere requirement of the system is 174 A, which is provided by the 3*80A breaker we read on our electric watch. (English)
Property / summary: The aim of the project is to fully cover the existing energy consumption of our company’s premises from solar systems. In this case, the building’s electrical power will be supplied by 155 polycrystalline solar panels of 300 W. The total power of the solar system to be installed is 46,5 kWp, which will generate around 49 290 kWh/year of electricity per year, taking into account local conditions and shade-free conditions, taking into account the building’s characteristics and geographical location. The ampere requirement of the system is 174 A, which is provided by the 3*80A breaker we read on our electric watch. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to fully cover the existing energy consumption of our company’s premises from solar systems. In this case, the building’s electrical power will be supplied by 155 polycrystalline solar panels of 300 W. The total power of the solar system to be installed is 46,5 kWp, which will generate around 49 290 kWh/year of electricity per year, taking into account local conditions and shade-free conditions, taking into account the building’s characteristics and geographical location. The ampere requirement of the system is 174 A, which is provided by the 3*80A breaker we read on our electric watch. (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:44, 8 February 2022

Project Q3934676 in Hungary
Language Label Description Also known as
English
Energy-saving developments with the introduction of renewable energy at Kristóf Car House
Project Q3934676 in Hungary

    Statements

    0 references
    13,439,502 forint
    0 references
    37,163.04 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    66,797.394 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    24,435,458.182 forint
    0 references
    54.999999 percent
    0 references
    21 July 2020
    0 references
    8 October 2020
    0 references
    Kristóf Autóház Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°38'18.42"N, 17°14'50.96"E
    0 references
    A projekt célja cégünk telephelyének meglévő energiafogyasztását teljes mértékben napelemes rendszerekből fedezni. Az épület villamos energiaellátását ebben az esetben 155 db 300 W-os polykristályos napelem fogja biztosítani. Az üzembehelyezendő naplemes rendszer összes teljesítménye 46,5 kWp, amely a helyi adottságokat figyelembe véve, valamint árnyékmentes körülmények között éves szinten kb. 49 290 kWh/év villamos energiát fog termelni az épület adottságait és a földrajzi fekvést is figyelembe véve. A rendszer amper igénye 174 A, melyet az általunk villanyórán leolvasott 3*80A kismegszakító biztosít. (Hungarian)
    0 references
    The aim of the project is to fully cover the existing energy consumption of our company’s premises from solar systems. In this case, the building’s electrical power will be supplied by 155 polycrystalline solar panels of 300 W. The total power of the solar system to be installed is 46,5 kWp, which will generate around 49 290 kWh/year of electricity per year, taking into account local conditions and shade-free conditions, taking into account the building’s characteristics and geographical location. The ampere requirement of the system is 174 A, which is provided by the 3*80A breaker we read on our electric watch. (English)
    8 February 2022
    0 references
    Csorna, Győr-Moson-Sopron
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-01456
    0 references