Installation of a solar system at KTS Metalworks Ltd.'s Bátonyterenye site (Q3934112): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
We produce electricity using a photovoltaic system connected to the network for the purpose of development. During the project, 161 KS-310M solar panel modules will be installed on the roof surface of the property. The solar modules are electrically connected and connected to 2 Eco 25.0-3-S inverters. The price of the system is 16 798 900 HUF net. The total eligible cost per tonne of greenhouse gas reduction per year is HUF 406.73 000/t CO2. The unit investment cost of the scheme is HUF 336 584/kWp. Thanks to the development, we expect the following indicators to improve: GHG reduction: Percentage of annual GHG reduction of 41.3 t (CO2)/year compared to pre-development emissions: 61.46 % Solar System annual primary energy savings: 82 351 kWh/year Primer energy savings: 36.87 % Preparatory activities: • Preparation of static expert opinion • Visit of solar panel contractor, consultation at on-site inspection, request for quotation • Energy visits, energy background calculations • Conciliation with a technical inspector, request for quotation • Compilation of tender documentation (English) | |||||||||||||||
Property / summary: We produce electricity using a photovoltaic system connected to the network for the purpose of development. During the project, 161 KS-310M solar panel modules will be installed on the roof surface of the property. The solar modules are electrically connected and connected to 2 Eco 25.0-3-S inverters. The price of the system is 16 798 900 HUF net. The total eligible cost per tonne of greenhouse gas reduction per year is HUF 406.73 000/t CO2. The unit investment cost of the scheme is HUF 336 584/kWp. Thanks to the development, we expect the following indicators to improve: GHG reduction: Percentage of annual GHG reduction of 41.3 t (CO2)/year compared to pre-development emissions: 61.46 % Solar System annual primary energy savings: 82 351 kWh/year Primer energy savings: 36.87 % Preparatory activities: • Preparation of static expert opinion • Visit of solar panel contractor, consultation at on-site inspection, request for quotation • Energy visits, energy background calculations • Conciliation with a technical inspector, request for quotation • Compilation of tender documentation (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: We produce electricity using a photovoltaic system connected to the network for the purpose of development. During the project, 161 KS-310M solar panel modules will be installed on the roof surface of the property. The solar modules are electrically connected and connected to 2 Eco 25.0-3-S inverters. The price of the system is 16 798 900 HUF net. The total eligible cost per tonne of greenhouse gas reduction per year is HUF 406.73 000/t CO2. The unit investment cost of the scheme is HUF 336 584/kWp. Thanks to the development, we expect the following indicators to improve: GHG reduction: Percentage of annual GHG reduction of 41.3 t (CO2)/year compared to pre-development emissions: 61.46 % Solar System annual primary energy savings: 82 351 kWh/year Primer energy savings: 36.87 % Preparatory activities: • Preparation of static expert opinion • Visit of solar panel contractor, consultation at on-site inspection, request for quotation • Energy visits, energy background calculations • Conciliation with a technical inspector, request for quotation • Compilation of tender documentation (English) / qualifier | |||||||||||||||
point in time: 8 February 2022
|
Revision as of 21:43, 8 February 2022
Project Q3934112 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of a solar system at KTS Metalworks Ltd.'s Bátonyterenye site |
Project Q3934112 in Hungary |
Statements
16,798,900 forint
0 references
30,543,454.545 forint
0 references
55.0 percent
0 references
1 April 2020
0 references
31 March 2022
0 references
KTS METALWORKS Fémipari Korlátolt Felelősségű Társaság
0 references
A fejlesztés céljául szolgáló, hálózatra csatlakoztatott fotovoltaikus rendszer segítségével villamos energiát állítunk elő. Az ingatlan tetőfelületére a projekt során 161 db KS-310M napelem modult telepítünk. A napelemes modulokat villamosan összekapcsoljuk, majd 2 db Eco 25.0-3-S inverterre kötjük. A rendszer ára nettó 16 798 900 Ft. Az egy tonna üvegházhatást okozó gázok éves csökkentésére vetített elszámolható összköltség 406,73 ezer Ft/t CO2. A rendszer fajlagos beruházási költsége 336 584 eFt/kWp. A fejlesztésnek köszönhetően a következő mutatók javulását várjuk: ÜHG csökkenés: 41,3 t (CO2)/év ÜHG éves csökkenésének aránya a fejlesztés előtti kibocsátáshoz képest: 61,46% Napelemes rendszer éves primer energia megtakarítása: 82 351 kWh/év Primerenergia megtakarítás aránya: 36,87% Előkészítő tevékenységeink: • Statikai szakvélemény készíttetése • Napelemes kivitelező felkeresése, helyszíni szemlén egyeztetés, árajánlatkérés • Energetikus felkeresése, energetikai háttér számítások elvégzése • Műszaki ellenőrrel egyeztetés, árajánlatkérés • Pályázati dokumentáció összeállítása (Hungarian)
0 references
We produce electricity using a photovoltaic system connected to the network for the purpose of development. During the project, 161 KS-310M solar panel modules will be installed on the roof surface of the property. The solar modules are electrically connected and connected to 2 Eco 25.0-3-S inverters. The price of the system is 16 798 900 HUF net. The total eligible cost per tonne of greenhouse gas reduction per year is HUF 406.73 000/t CO2. The unit investment cost of the scheme is HUF 336 584/kWp. Thanks to the development, we expect the following indicators to improve: GHG reduction: Percentage of annual GHG reduction of 41.3 t (CO2)/year compared to pre-development emissions: 61.46 % Solar System annual primary energy savings: 82 351 kWh/year Primer energy savings: 36.87 % Preparatory activities: • Preparation of static expert opinion • Visit of solar panel contractor, consultation at on-site inspection, request for quotation • Energy visits, energy background calculations • Conciliation with a technical inspector, request for quotation • Compilation of tender documentation (English)
8 February 2022
0 references
Bátonyterenye, Nógrád
0 references
Identifiers
GINOP-4.1.4-19-2020-00633
0 references