Installation of a solar system at KTS Metalworks Ltd.'s Bátonyterenye site (Q3934112): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
We produce electricity using a photovoltaic system connected to the network for the purpose of development. During the project, 161 KS-310M solar panel modules will be installed on the roof surface of the property. The solar modules are electrically connected and connected to 2 Eco 25.0-3-S inverters. The price of the system is 16 798 900 HUF net. The total eligible cost per tonne of greenhouse gas reduction per year is HUF 406.73 000/t CO2. The unit investment cost of the scheme is HUF 336 584/kWp. Thanks to the development, we expect the following indicators to improve: GHG reduction: Percentage of annual GHG reduction of 41.3 t (CO2)/year compared to pre-development emissions: 61.46 % Solar System annual primary energy savings: 82 351 kWh/year Primer energy savings: 36.87 % Preparatory activities: • Preparation of static expert opinion • Visit of solar panel contractor, consultation at on-site inspection, request for quotation • Energy visits, energy background calculations • Conciliation with a technical inspector, request for quotation • Compilation of tender documentation (English)
Property / summary: We produce electricity using a photovoltaic system connected to the network for the purpose of development. During the project, 161 KS-310M solar panel modules will be installed on the roof surface of the property. The solar modules are electrically connected and connected to 2 Eco 25.0-3-S inverters. The price of the system is 16 798 900 HUF net. The total eligible cost per tonne of greenhouse gas reduction per year is HUF 406.73 000/t CO2. The unit investment cost of the scheme is HUF 336 584/kWp. Thanks to the development, we expect the following indicators to improve: GHG reduction: Percentage of annual GHG reduction of 41.3 t (CO2)/year compared to pre-development emissions: 61.46 % Solar System annual primary energy savings: 82 351 kWh/year Primer energy savings: 36.87 % Preparatory activities: • Preparation of static expert opinion • Visit of solar panel contractor, consultation at on-site inspection, request for quotation • Energy visits, energy background calculations • Conciliation with a technical inspector, request for quotation • Compilation of tender documentation (English) / rank
 
Normal rank
Property / summary: We produce electricity using a photovoltaic system connected to the network for the purpose of development. During the project, 161 KS-310M solar panel modules will be installed on the roof surface of the property. The solar modules are electrically connected and connected to 2 Eco 25.0-3-S inverters. The price of the system is 16 798 900 HUF net. The total eligible cost per tonne of greenhouse gas reduction per year is HUF 406.73 000/t CO2. The unit investment cost of the scheme is HUF 336 584/kWp. Thanks to the development, we expect the following indicators to improve: GHG reduction: Percentage of annual GHG reduction of 41.3 t (CO2)/year compared to pre-development emissions: 61.46 % Solar System annual primary energy savings: 82 351 kWh/year Primer energy savings: 36.87 % Preparatory activities: • Preparation of static expert opinion • Visit of solar panel contractor, consultation at on-site inspection, request for quotation • Energy visits, energy background calculations • Conciliation with a technical inspector, request for quotation • Compilation of tender documentation (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:43, 8 February 2022

Project Q3934112 in Hungary
Language Label Description Also known as
English
Installation of a solar system at KTS Metalworks Ltd.'s Bátonyterenye site
Project Q3934112 in Hungary

    Statements

    0 references
    16,798,900 forint
    0 references
    46,452.49 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    83,494.369 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    30,543,454.545 forint
    0 references
    55.0 percent
    0 references
    1 April 2020
    0 references
    31 March 2022
    0 references
    KTS METALWORKS Fémipari Korlátolt Felelősségű Társaság
    0 references
    0 references

    48°0'21.71"N, 19°47'5.64"E
    0 references
    A fejlesztés céljául szolgáló, hálózatra csatlakoztatott fotovoltaikus rendszer segítségével villamos energiát állítunk elő. Az ingatlan tetőfelületére a projekt során 161 db KS-310M napelem modult telepítünk. A napelemes modulokat villamosan összekapcsoljuk, majd 2 db Eco 25.0-3-S inverterre kötjük. A rendszer ára nettó 16 798 900 Ft. Az egy tonna üvegházhatást okozó gázok éves csökkentésére vetített elszámolható összköltség 406,73 ezer Ft/t CO2. A rendszer fajlagos beruházási költsége 336 584 eFt/kWp. A fejlesztésnek köszönhetően a következő mutatók javulását várjuk: ÜHG csökkenés: 41,3 t (CO2)/év ÜHG éves csökkenésének aránya a fejlesztés előtti kibocsátáshoz képest: 61,46% Napelemes rendszer éves primer energia megtakarítása: 82 351 kWh/év Primerenergia megtakarítás aránya: 36,87% Előkészítő tevékenységeink: • Statikai szakvélemény készíttetése • Napelemes kivitelező felkeresése, helyszíni szemlén egyeztetés, árajánlatkérés • Energetikus felkeresése, energetikai háttér számítások elvégzése • Műszaki ellenőrrel egyeztetés, árajánlatkérés • Pályázati dokumentáció összeállítása (Hungarian)
    0 references
    We produce electricity using a photovoltaic system connected to the network for the purpose of development. During the project, 161 KS-310M solar panel modules will be installed on the roof surface of the property. The solar modules are electrically connected and connected to 2 Eco 25.0-3-S inverters. The price of the system is 16 798 900 HUF net. The total eligible cost per tonne of greenhouse gas reduction per year is HUF 406.73 000/t CO2. The unit investment cost of the scheme is HUF 336 584/kWp. Thanks to the development, we expect the following indicators to improve: GHG reduction: Percentage of annual GHG reduction of 41.3 t (CO2)/year compared to pre-development emissions: 61.46 % Solar System annual primary energy savings: 82 351 kWh/year Primer energy savings: 36.87 % Preparatory activities: • Preparation of static expert opinion • Visit of solar panel contractor, consultation at on-site inspection, request for quotation • Energy visits, energy background calculations • Conciliation with a technical inspector, request for quotation • Compilation of tender documentation (English)
    8 February 2022
    0 references
    Bátonyterenye, Nógrád
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-00633
    0 references