Property / summary
 
In the existing building owned by the applicant, at 9700 Szombathely, Szabó Miklós utca 29, 12376, the energy renovation of the office building is planned. Planned in the framework of the energy renovation of the building: — replacement of doors and windows — design of thermal insulation envelopes (facade, partial roof insulation, insulation of cooling slabs) — installation of solar panels — modernisation of heating system The owner also plans to refurbish the building internally, but the internal refurbishment is not the subject of the present project and does not affect the energy characteristics. Later, the owner also plans to insulate the entire roof, but this is also not the subject of the present project, so the roof will only be insulated to the line of the upper slab so that the thermal insulation envelope can be formed. Target areas to be implemented: 3.1.1. Self-eligible activities B) Energy efficiency improvement activities: I. I. Improve the thermal capabilities of buildings, reduce their heat loss (a) Thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces, (b) Replacement of building envelopes classified as doors and windows separating heated and unheated spaces/upgrading with energy savings II. Upgrading of heating, cooling and domestic hot water systems in buildings 3.1.2. Ineligible activities: I. installation of a low-capacity solar system for the production of electricity in the grid only for the supply of electricity to the building concerned by the development and the economic and production processes involved therein (English)
Property / summary: In the existing building owned by the applicant, at 9700 Szombathely, Szabó Miklós utca 29, 12376, the energy renovation of the office building is planned. Planned in the framework of the energy renovation of the building: — replacement of doors and windows — design of thermal insulation envelopes (facade, partial roof insulation, insulation of cooling slabs) — installation of solar panels — modernisation of heating system The owner also plans to refurbish the building internally, but the internal refurbishment is not the subject of the present project and does not affect the energy characteristics. Later, the owner also plans to insulate the entire roof, but this is also not the subject of the present project, so the roof will only be insulated to the line of the upper slab so that the thermal insulation envelope can be formed. Target areas to be implemented: 3.1.1. Self-eligible activities B) Energy efficiency improvement activities: I. I. Improve the thermal capabilities of buildings, reduce their heat loss (a) Thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces, (b) Replacement of building envelopes classified as doors and windows separating heated and unheated spaces/upgrading with energy savings II. Upgrading of heating, cooling and domestic hot water systems in buildings 3.1.2. Ineligible activities: I. installation of a low-capacity solar system for the production of electricity in the grid only for the supply of electricity to the building concerned by the development and the economic and production processes involved therein (English) / rank
 
Normal rank
Property / summary: In the existing building owned by the applicant, at 9700 Szombathely, Szabó Miklós utca 29, 12376, the energy renovation of the office building is planned. Planned in the framework of the energy renovation of the building: — replacement of doors and windows — design of thermal insulation envelopes (facade, partial roof insulation, insulation of cooling slabs) — installation of solar panels — modernisation of heating system The owner also plans to refurbish the building internally, but the internal refurbishment is not the subject of the present project and does not affect the energy characteristics. Later, the owner also plans to insulate the entire roof, but this is also not the subject of the present project, so the roof will only be insulated to the line of the upper slab so that the thermal insulation envelope can be formed. Target areas to be implemented: 3.1.1. Self-eligible activities B) Energy efficiency improvement activities: I. I. Improve the thermal capabilities of buildings, reduce their heat loss (a) Thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces, (b) Replacement of building envelopes classified as doors and windows separating heated and unheated spaces/upgrading with energy savings II. Upgrading of heating, cooling and domestic hot water systems in buildings 3.1.2. Ineligible activities: I. installation of a low-capacity solar system for the production of electricity in the grid only for the supply of electricity to the building concerned by the development and the economic and production processes involved therein (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:41, 8 February 2022

Project Q3934550 in Hungary
Language Label Description Also known as
English
Building energy investment at POINTER MÉDIA Kft.
Project Q3934550 in Hungary

    Statements

    0 references
    0 references
    27,151.58 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    9,818,994 forint
    0 references
    48,802.642 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    17,852,716.364 forint
    0 references
    54.999973 percent
    0 references
    1 February 2020
    0 references
    31 January 2022
    0 references
    POINTER MÉDIA Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°13'44.83"N, 16°37'7.54"E
    0 references
    Pályázó tulajdonát képező meglévő épületben, a 9700 Szombathely, Szabó Miklós utca 29. szám, 12376 hrsz. alatt, irodaépület energetikai korszerűsítését tervezik. Tervezett az épület energetikai korszerűsítése keretében: - nyílászárócsere - hőszigetelő burok kialakítása (homlokzati, részbeni tetőszigetelés, lehűlő födémek szigetelése) - napelemek elhelyezése - fűtés rendszer korszerűsítése Az épület belső átalakítását is tervezi a tulajdonos, de a belső átalakítás nem képezi jelen projekt tárgyát, továbbá nem befolyásolja az energetikai jellemzőket. A későbbiek során a tulajdonos a teljes tető szigetelését is tervezi, de ez szintén nem képezi jelen projekt tárgyát, így a tető, csak a felső födém vonaláig kerül szigetelésre, hogy a hőszigetelő burok kialakuljon. Megvalósítandó célterületek: 3.1.1. Önállóan támogatható tevékenységek B) Energiahatékonyság javítására vonatkozó tevékenységek: I. Az épületek hőtechnikai adottságainak javítása, hőveszteségének csökkentése a) Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése b) Fűtött és fűtetlen teret elválasztó, nyílászáró szerkezetnek minősülő épülethatároló szerkezetek cseréje / energia-megtakarítást eredményező korszerűsítése II. Épületek fűtési, hűtési és használati melegvíz-rendszereinek korszerűsítése 3.1.2. Önállóan nem támogatható tevékenységek: I. Kiskapacitású napelemes rendszer telepítése hálózati villamosenergia-termelés céljából, kizárólag a fejlesztésben érintett épület és az abban folyó gazdasági-termelési folyamatok villamosenergia-ellátásához (Hungarian)
    0 references
    In the existing building owned by the applicant, at 9700 Szombathely, Szabó Miklós utca 29, 12376, the energy renovation of the office building is planned. Planned in the framework of the energy renovation of the building: — replacement of doors and windows — design of thermal insulation envelopes (facade, partial roof insulation, insulation of cooling slabs) — installation of solar panels — modernisation of heating system The owner also plans to refurbish the building internally, but the internal refurbishment is not the subject of the present project and does not affect the energy characteristics. Later, the owner also plans to insulate the entire roof, but this is also not the subject of the present project, so the roof will only be insulated to the line of the upper slab so that the thermal insulation envelope can be formed. Target areas to be implemented: 3.1.1. Self-eligible activities B) Energy efficiency improvement activities: I. I. Improve the thermal capabilities of buildings, reduce their heat loss (a) Thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces, (b) Replacement of building envelopes classified as doors and windows separating heated and unheated spaces/upgrading with energy savings II. Upgrading of heating, cooling and domestic hot water systems in buildings 3.1.2. Ineligible activities: I. installation of a low-capacity solar system for the production of electricity in the grid only for the supply of electricity to the building concerned by the development and the economic and production processes involved therein (English)
    8 February 2022
    0 references
    Szombathely, Vas
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-01267
    0 references