Property / summary
 
The 5559 property of Makó, Hunyadi u. 10 is a massive building built in the first half of your last mouth, but it needs to be renovated significantly from an energetic point of view. The location of the property is favourable from a market point of view, it is located in the city centre, surrounded by the postal and institutions housing estates. In order to establish the professional basis of our request for support, Renema Kft. (Békéscsaba, Borjú u. 33) has been commissioned to assess the current state of the building and to determine the necessary investments and parameters for achieving the planned energy indicators. According to the completed study, our building is currently classified as GG building energy, which corresponds to an average. It was found that the modernisation is justified, in which the following investments are required: — retrospective thermal insulation on external boundaries with 15 cm EPS insulating material, 20 cm in the case of the attic floor with rock wool. — replacement of doors and windows with equivalent structural elements U=1,15 W/m2K. Replacement of an existing wooden window structure with a custom-made wooden window structure that matches the style of the building with three layers of thermal insulation glazing. — installation of shielding devices, — modernisation of the entire heating system: installation of air-heat pump, installation of condensation gas boiler with fan-coil heat take-offs. Instead of the current heating system, we are planning to create a heating system by installing a heat pump. During the installation of the heating system, the radiator system is dimensioned to a temperature step 55/45. By rethinking the existing heating system, installing state-of-the-art heating controls and making use of surface heating options, and in order to ensure summer cooling (in addition to eliminating existing spit climates), Fan-coil cooling will be provided by the air-heat pump. — installation of a solar system. Due to the size and multifunctional nature of the building, it is absolutely necessary to purchase a system with a total power of at least 20 kW in the case of the planned solar system, in order to cover nearly the total energy demand from renewable sources. — installation of motion sensor and energy-saving lighting bodies. A rating that can be achieved by implementing them together: BB (meaning zero energy requirements). (English)
Property / summary: The 5559 property of Makó, Hunyadi u. 10 is a massive building built in the first half of your last mouth, but it needs to be renovated significantly from an energetic point of view. The location of the property is favourable from a market point of view, it is located in the city centre, surrounded by the postal and institutions housing estates. In order to establish the professional basis of our request for support, Renema Kft. (Békéscsaba, Borjú u. 33) has been commissioned to assess the current state of the building and to determine the necessary investments and parameters for achieving the planned energy indicators. According to the completed study, our building is currently classified as GG building energy, which corresponds to an average. It was found that the modernisation is justified, in which the following investments are required: — retrospective thermal insulation on external boundaries with 15 cm EPS insulating material, 20 cm in the case of the attic floor with rock wool. — replacement of doors and windows with equivalent structural elements U=1,15 W/m2K. Replacement of an existing wooden window structure with a custom-made wooden window structure that matches the style of the building with three layers of thermal insulation glazing. — installation of shielding devices, — modernisation of the entire heating system: installation of air-heat pump, installation of condensation gas boiler with fan-coil heat take-offs. Instead of the current heating system, we are planning to create a heating system by installing a heat pump. During the installation of the heating system, the radiator system is dimensioned to a temperature step 55/45. By rethinking the existing heating system, installing state-of-the-art heating controls and making use of surface heating options, and in order to ensure summer cooling (in addition to eliminating existing spit climates), Fan-coil cooling will be provided by the air-heat pump. — installation of a solar system. Due to the size and multifunctional nature of the building, it is absolutely necessary to purchase a system with a total power of at least 20 kW in the case of the planned solar system, in order to cover nearly the total energy demand from renewable sources. — installation of motion sensor and energy-saving lighting bodies. A rating that can be achieved by implementing them together: BB (meaning zero energy requirements). (English) / rank
 
Normal rank
Property / summary: The 5559 property of Makó, Hunyadi u. 10 is a massive building built in the first half of your last mouth, but it needs to be renovated significantly from an energetic point of view. The location of the property is favourable from a market point of view, it is located in the city centre, surrounded by the postal and institutions housing estates. In order to establish the professional basis of our request for support, Renema Kft. (Békéscsaba, Borjú u. 33) has been commissioned to assess the current state of the building and to determine the necessary investments and parameters for achieving the planned energy indicators. According to the completed study, our building is currently classified as GG building energy, which corresponds to an average. It was found that the modernisation is justified, in which the following investments are required: — retrospective thermal insulation on external boundaries with 15 cm EPS insulating material, 20 cm in the case of the attic floor with rock wool. — replacement of doors and windows with equivalent structural elements U=1,15 W/m2K. Replacement of an existing wooden window structure with a custom-made wooden window structure that matches the style of the building with three layers of thermal insulation glazing. — installation of shielding devices, — modernisation of the entire heating system: installation of air-heat pump, installation of condensation gas boiler with fan-coil heat take-offs. Instead of the current heating system, we are planning to create a heating system by installing a heat pump. During the installation of the heating system, the radiator system is dimensioned to a temperature step 55/45. By rethinking the existing heating system, installing state-of-the-art heating controls and making use of surface heating options, and in order to ensure summer cooling (in addition to eliminating existing spit climates), Fan-coil cooling will be provided by the air-heat pump. — installation of a solar system. Due to the size and multifunctional nature of the building, it is absolutely necessary to purchase a system with a total power of at least 20 kW in the case of the planned solar system, in order to cover nearly the total energy demand from renewable sources. — installation of motion sensor and energy-saving lighting bodies. A rating that can be achieved by implementing them together: BB (meaning zero energy requirements). (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:24, 8 February 2022

Project Q3932148 in Hungary
Language Label Description Also known as
English
Complete energy modernisation of Hunyadi street store, solar panel installation
Project Q3932148 in Hungary

    Statements

    0 references
    59,507,164 forint
    0 references
    164,549.80 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    325,340.614 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    119,014,328.0 forint
    0 references
    50.0 percent
    0 references
    16 September 2019
    0 references
    30 April 2021
    0 references
    Kovács Bálint egyéni vállalkozó
    0 references
    0 references

    46°12'54.14"N, 20°28'30.36"E
    0 references
    A Makó, Hunyadi u. 10. hrsz-ú 5559 ingatlan a múlt szád első felében épült masszív épület, viszont energetikai szempontból jelentős felújításra szorul.Az ingatlan elhelyezkedése piaci szempontból kedvező, a városközpontban helyezkedik el, a posta, intézmények lakótelepek ölelik körül..Támogatási kérelmünk szakmai megalapozása érdekében a Renema Kft ( Békéscsaba, Borjú u. 33.) energetikai szakértőt bíztuk meg az épület jelenlegi állapotának felmérésével, valamint a tervezett energetikai mutatók eléréséhez szükséges beruházások, azok paramétereinek meghatározására. Az elkészült szaktanulmány szerint épületünk jelenleg GG épületenergetikai besorolásba esik, amely átlagosnak felel meg. Megállapítást nyert, hogy indokolt a korszerűsítés, mely során az alábbi beruházások kivitelezése szükséges: - utólagos hőszigetelés a külső határoló falakon 15 cm EPS szigetelő anyaggal, a padlásfödémen esetében 20 cm kőzetgyapottal. - nyílászárók cseréje U=1,15 W/m2K egyenértékű szerkezeti elemekkel. Meglévő faablak szerkezet kicserélése az épület stílusával egyező egyedi gyártású faablak szerkezetre háromrétegű hőszigetelő üvegezéssel. - árnyékoló berendezések felszerelése, - teljes fűtési rendszer korszerűsítése: levegő-hőszivattyú telepítése, kondenzációs gázkazán telepítése, fan-coil hőleadókkal. A jelenlegi fűtés helyett egy VÍZ-LEVEGO hőszivattyú beépítésével megoldott fűtési rendszert tervezünk kialakítani. A fűtési rendszer szerelése során a radiátoros rendszert 55/45-os hőfoklépcsőre méretezzük. A meglévő fűtési rendszer teljes átgondolásával, korszerű fűtésszabályzók beépítésével és ahol lehet kihasználva felület fűtési lehetőségeket, továbbá a nyári hűtés biztosítása érdekében ( a meglévő spit klímák kiiktatása mellett) Fan-coil rendszerű hűtés kialakítása lesz biztosítva a levegő-hőszivattyú által. - napelemes rendszer kiépítése. Az épület méretéből, valamint többfunkciós mivoltából fakadóan a tervezett napelemes rendszer esetében feltétlen indokolt egy legalább 20 kW összteljesítményű rendszer beszerzése, annak érdekében, hogy közel a teljes energiaszükségletet megújuló energiaforrásból tudjuk fedezni. - mozgásérzékelő és energiatakarékos világítási testek beszerelése. Ezek együttes megvalósításával elérhető minősítés: BB (Közel nulla energiaigényre vonatkozó követelményeknek megfelelő). (Hungarian)
    0 references
    The 5559 property of Makó, Hunyadi u. 10 is a massive building built in the first half of your last mouth, but it needs to be renovated significantly from an energetic point of view. The location of the property is favourable from a market point of view, it is located in the city centre, surrounded by the postal and institutions housing estates. In order to establish the professional basis of our request for support, Renema Kft. (Békéscsaba, Borjú u. 33) has been commissioned to assess the current state of the building and to determine the necessary investments and parameters for achieving the planned energy indicators. According to the completed study, our building is currently classified as GG building energy, which corresponds to an average. It was found that the modernisation is justified, in which the following investments are required: — retrospective thermal insulation on external boundaries with 15 cm EPS insulating material, 20 cm in the case of the attic floor with rock wool. — replacement of doors and windows with equivalent structural elements U=1,15 W/m2K. Replacement of an existing wooden window structure with a custom-made wooden window structure that matches the style of the building with three layers of thermal insulation glazing. — installation of shielding devices, — modernisation of the entire heating system: installation of air-heat pump, installation of condensation gas boiler with fan-coil heat take-offs. Instead of the current heating system, we are planning to create a heating system by installing a heat pump. During the installation of the heating system, the radiator system is dimensioned to a temperature step 55/45. By rethinking the existing heating system, installing state-of-the-art heating controls and making use of surface heating options, and in order to ensure summer cooling (in addition to eliminating existing spit climates), Fan-coil cooling will be provided by the air-heat pump. — installation of a solar system. Due to the size and multifunctional nature of the building, it is absolutely necessary to purchase a system with a total power of at least 20 kW in the case of the planned solar system, in order to cover nearly the total energy demand from renewable sources. — installation of motion sensor and energy-saving lighting bodies. A rating that can be achieved by implementing them together: BB (meaning zero energy requirements). (English)
    8 February 2022
    0 references
    Makó, Csongrád-Csanád
    0 references

    Identifiers

    GINOP-4.1.2-18-2019-00424
    0 references