Within the framework of the project, the aim is to supply electricity to the building of the company MedFour Kft., located on site 9300 Csorna, Thököly út 40, registered on 1230/3hrsz. As part of the investment, 29 solar panels with a power of 300 Wp will be placed on the roof with a total rated power of 8.7 kW. Connection to the network is done through the ABB PVI 10.0-TL-OUTD-S inverter. The system will generate 9 570 kWh of electricity per year, reducing GHG emissions. The annual energy consumption of the building before development is 9 876 kWh. (English)
Property / summary: Within the framework of the project, the aim is to supply electricity to the building of the company MedFour Kft., located on site 9300 Csorna, Thököly út 40, registered on 1230/3hrsz. As part of the investment, 29 solar panels with a power of 300 Wp will be placed on the roof with a total rated power of 8.7 kW. Connection to the network is done through the ABB PVI 10.0-TL-OUTD-S inverter. The system will generate 9 570 kWh of electricity per year, reducing GHG emissions. The annual energy consumption of the building before development is 9 876 kWh. (English) / rank
 
Normal rank
Property / summary: Within the framework of the project, the aim is to supply electricity to the building of the company MedFour Kft., located on site 9300 Csorna, Thököly út 40, registered on 1230/3hrsz. As part of the investment, 29 solar panels with a power of 300 Wp will be placed on the roof with a total rated power of 8.7 kW. Connection to the network is done through the ABB PVI 10.0-TL-OUTD-S inverter. The system will generate 9 570 kWh of electricity per year, reducing GHG emissions. The annual energy consumption of the building before development is 9 876 kWh. (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:21, 8 February 2022

Project Q3932977 in Hungary
Language Label Description Also known as
English
Installation of a solar system at MedFour Ltd.'s headquarters_x000D_
Project Q3932977 in Hungary

    Statements

    0 references
    1,740,000 forint
    0 references
    4,811.46 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    4,756.509 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    1,740,000.0 forint
    0 references
    100.0 percent
    0 references
    19 December 2019
    0 references
    20 July 2020
    0 references
    MEDFOUR Informatikai és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°38'18.42"N, 17°14'50.96"E
    0 references
    A projekt keretében a MedFour Kft cég 1230/3 hrsz.-on nyilvántartott 9300 Csorna, Thököly út 40. helyszínén található épületének villamos energia igényének, napelemmel termelt megújuló alapú villamosenergiával való ellátása a cél. A beruházás keretében 29 db 300 Wp teljesítményű napelem panel, összesen 8,7 kW névleges teljesítményben a tetőre kerülnek elhelyezésre. A hálózathoz való csatlakozás az ABB PVI 10.0-TL-OUTD-S inverteren keresztül történik. A rendszer éves szinten 9570 kWh villamos energiát fog termelni, amely hatására csökken az ÜHG kibocsátás. Az épület fejlesztés előtti éves energiafogyasztása 9876 kWh. (Hungarian)
    0 references
    Within the framework of the project, the aim is to supply electricity to the building of the company MedFour Kft., located on site 9300 Csorna, Thököly út 40, registered on 1230/3hrsz. As part of the investment, 29 solar panels with a power of 300 Wp will be placed on the roof with a total rated power of 8.7 kW. Connection to the network is done through the ABB PVI 10.0-TL-OUTD-S inverter. The system will generate 9 570 kWh of electricity per year, reducing GHG emissions. The annual energy consumption of the building before development is 9 876 kWh. (English)
    8 February 2022
    0 references
    Csorna, Győr-Moson-Sopron
    0 references

    Identifiers

    GINOP-4.1.3-19-2019-01269
    0 references