Complex development of corporate IT system at Elektrolit Kft. (Q3924522): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
The server side will continue to be the existing asset park, given that it is currently in a fully correct state. The development will affect the systems currently in use so that the current infrastructure will be dismantled as it is fragmented. Under the current structure, there is a separate system of administrative workflows. The development of data links and exchanges between these systems is limited and there is a risk of data loss. The aim of the procurement is to complete integration and transparent corporate operation in compliance with both legal obligations and ownership requirements. One server, a rack cabinet and an uninterrupted power supply will be purchased for the corporate management system to be introduced. The company does not currently have an ERP, it has island systems. (English)
Property / summary: The server side will continue to be the existing asset park, given that it is currently in a fully correct state. The development will affect the systems currently in use so that the current infrastructure will be dismantled as it is fragmented. Under the current structure, there is a separate system of administrative workflows. The development of data links and exchanges between these systems is limited and there is a risk of data loss. The aim of the procurement is to complete integration and transparent corporate operation in compliance with both legal obligations and ownership requirements. One server, a rack cabinet and an uninterrupted power supply will be purchased for the corporate management system to be introduced. The company does not currently have an ERP, it has island systems. (English) / rank
 
Normal rank
Property / summary: The server side will continue to be the existing asset park, given that it is currently in a fully correct state. The development will affect the systems currently in use so that the current infrastructure will be dismantled as it is fragmented. Under the current structure, there is a separate system of administrative workflows. The development of data links and exchanges between these systems is limited and there is a risk of data loss. The aim of the procurement is to complete integration and transparent corporate operation in compliance with both legal obligations and ownership requirements. One server, a rack cabinet and an uninterrupted power supply will be purchased for the corporate management system to be introduced. The company does not currently have an ERP, it has island systems. (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:56, 8 February 2022

Project Q3924522 in Hungary
Language Label Description Also known as
English
Complex development of corporate IT system at Elektrolit Kft.
Project Q3924522 in Hungary

    Statements

    0 references
    0 references
    31,931,500 forint
    0 references
    88,297.30 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    218,221.915 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    79,828,750.0 forint
    0 references
    40.0 percent
    0 references
    1 September 2020
    0 references
    31 August 2021
    0 references
    ELEKTROLIT Kft.
    0 references
    0 references

    46°20'54.56"N, 18°42'5.98"E
    0 references
    A kiszolgálói oldal továbbra is a meglévő eszközpark marad, tekintettel arra, hogy annak állapota jelenleg teljesen megfelelő. A fejlesztés akképpen érinti a jelenleg használt rendszereket, hogy a mostani infrastruktúra felszámolásra kerül, mivel az széttagolt. A jelenlegi struktúrában külön rendszerben valósulnak meg adminisztratív munkafolyamatok. Ezen rendszerek között az adatkapcsolatok, adatcserék kiépítése csak korlátozottan lehetséges, illetve az adatvesztés kockázata fennáll. A beszerzéssel cél a teljes integráció és a transzparens vállalati működés mind a jogszabályi kötelezettségek, mind a tulajdonosi elvárások betartása mellett. A bevezetendő vállalatirányítási rendszerhez egy db szerver, egy rack szekrény és egy szünetmentes tápegység kerül beszerzésre. A vállalkozás nem rendelkezik jelenleg vállalatirányítási rendszerrel (ERP-vel), szigetrendszerei vannak. (Hungarian)
    0 references
    The server side will continue to be the existing asset park, given that it is currently in a fully correct state. The development will affect the systems currently in use so that the current infrastructure will be dismantled as it is fragmented. Under the current structure, there is a separate system of administrative workflows. The development of data links and exchanges between these systems is limited and there is a risk of data loss. The aim of the procurement is to complete integration and transparent corporate operation in compliance with both legal obligations and ownership requirements. One server, a rack cabinet and an uninterrupted power supply will be purchased for the corporate management system to be introduced. The company does not currently have an ERP, it has island systems. (English)
    8 February 2022
    0 references
    Szekszárd, Tolna
    0 references

    Identifiers

    GINOP-3.2.2-8-2-4-16-2020-02293
    0 references