Property / summary | |||||||||||||||
As part of the project, we plan to purchase the following tools: — aqueous grading equipment and depot tapes which allow high-quality basic material processing and solve their deposition; — chained dredger and rubber wheel loader — to ensure loading and storage of raw materials; — using the bridge balance, we record the quantities issued and transmit the data to the corporate governance system; — the bench roller is used to improve the terrain in depot and during the transport of material handling equipment; With the help of 50 kWp HMKE solar panel, we intend to provide part of the used electrical energy for the machines to be purchased. Our company intends to implement a technology chain during the planned project with the following elements: I machinery and equipment used for the processing of the raw material (slapping, grading equipment); II material handling machines (hydraulic chain excavator, rubber wheel excavator); III from the processed and graded materials, through the mobile concrete mixer, semi-finished products are produced, which are poured into formwork forms (concrete block formwork or wall formwork) after proper and planned ironing (for this purpose by the stirrer of concrete iron). this is how the final product is obtained in its final form. IV For removal, a forklift is used. The container lift will be used as a tilting superstructure of our existing truck to move semi-finished and finished goods. V. The iron machining line will generate significant energy use. We will provide alternative energy production with the help of a small power plant of a household size. VI Our company already operates corporate management software, which covers some features. During the project, the current software solutions will be replaced by a complete IPAR 4.0 solution linking production and corporate management. This involves the development of six functional target areas. These target areas are: corporate CRM sales, human resources and management, controlling and decision support systems, procurement and logistics, support for remote and group work, and electronic document management. (English) | |||||||||||||||
Property / summary: As part of the project, we plan to purchase the following tools: — aqueous grading equipment and depot tapes which allow high-quality basic material processing and solve their deposition; — chained dredger and rubber wheel loader — to ensure loading and storage of raw materials; — using the bridge balance, we record the quantities issued and transmit the data to the corporate governance system; — the bench roller is used to improve the terrain in depot and during the transport of material handling equipment; With the help of 50 kWp HMKE solar panel, we intend to provide part of the used electrical energy for the machines to be purchased. Our company intends to implement a technology chain during the planned project with the following elements: I machinery and equipment used for the processing of the raw material (slapping, grading equipment); II material handling machines (hydraulic chain excavator, rubber wheel excavator); III from the processed and graded materials, through the mobile concrete mixer, semi-finished products are produced, which are poured into formwork forms (concrete block formwork or wall formwork) after proper and planned ironing (for this purpose by the stirrer of concrete iron). this is how the final product is obtained in its final form. IV For removal, a forklift is used. The container lift will be used as a tilting superstructure of our existing truck to move semi-finished and finished goods. V. The iron machining line will generate significant energy use. We will provide alternative energy production with the help of a small power plant of a household size. VI Our company already operates corporate management software, which covers some features. During the project, the current software solutions will be replaced by a complete IPAR 4.0 solution linking production and corporate management. This involves the development of six functional target areas. These target areas are: corporate CRM sales, human resources and management, controlling and decision support systems, procurement and logistics, support for remote and group work, and electronic document management. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As part of the project, we plan to purchase the following tools: — aqueous grading equipment and depot tapes which allow high-quality basic material processing and solve their deposition; — chained dredger and rubber wheel loader — to ensure loading and storage of raw materials; — using the bridge balance, we record the quantities issued and transmit the data to the corporate governance system; — the bench roller is used to improve the terrain in depot and during the transport of material handling equipment; With the help of 50 kWp HMKE solar panel, we intend to provide part of the used electrical energy for the machines to be purchased. Our company intends to implement a technology chain during the planned project with the following elements: I machinery and equipment used for the processing of the raw material (slapping, grading equipment); II material handling machines (hydraulic chain excavator, rubber wheel excavator); III from the processed and graded materials, through the mobile concrete mixer, semi-finished products are produced, which are poured into formwork forms (concrete block formwork or wall formwork) after proper and planned ironing (for this purpose by the stirrer of concrete iron). this is how the final product is obtained in its final form. IV For removal, a forklift is used. The container lift will be used as a tilting superstructure of our existing truck to move semi-finished and finished goods. V. The iron machining line will generate significant energy use. We will provide alternative energy production with the help of a small power plant of a household size. VI Our company already operates corporate management software, which covers some features. During the project, the current software solutions will be replaced by a complete IPAR 4.0 solution linking production and corporate management. This involves the development of six functional target areas. These target areas are: corporate CRM sales, human resources and management, controlling and decision support systems, procurement and logistics, support for remote and group work, and electronic document management. (English) / qualifier | |||||||||||||||
point in time: 8 February 2022
|
Revision as of 14:36, 8 February 2022
Project Q3915648 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Technology development at BET-BAU Kft. |
Project Q3915648 in Hungary |
Statements
396,830,095 forint
0 references
2,169,569.813 Euro
0.0027336256 Euro
14 December 2021
0 references
793,660,190.0 forint
0 references
50.0 percent
0 references
17 September 2018
0 references
14 June 2020
0 references
BET-BAU Építőipari és Kereskedelmi Korlátolt Felelősségű Társaság
0 references
A projekt keretében a következő eszközöket tervezzük megvásárolni: - vizes osztályozó berendezés és depózó szalagok, melyek nagy minőségű alapanyag-feldolgozást tesznek lehetővé, és azok depózását oldják meg; - láncos kotró és gumikerekes homlokrakodó – melyekkel az alapanyagok rakodását és tárolását biztosítjuk; - a hídmérleggel a kiadott mennyiségeket rögzítjük, és az adatot továbbítjuk a vállalatirányítási rendszernek; - a padkahengert a depózásnál és az anyagmozgató berendezések közlekedése során keletkező terepegyenetlenségek javítására használjuk; - 50 kWp HMKE napelem segítségével a megvásárolni tervezett gépek részére kívánjuk biztosítani az elhasznált elektromos energia egy részét Cégünk a tervezett projekt során a egy technológia láncot szeretne megvalósítani a következő elemekkel: I az alapanyag feldolgozásához használt gépek és eszközök (pofás törő, osztályozó berendezés); II az ezeket kiszolgáló anyagmozgató gépek (hidraulikus láncos kotró, gumikerekes kotró); III a feldolgozott és szétosztályozott alapanyagokból a mobil betonkeverőn keresztül félkész termékek készülnek, melyeket a megfelelő és tervezett vasalás után (ezt szolgálja a kengyelhajlító betonvas-megmunkáló eszköz) zsalu formákba öntünk (betonblokk-zsaluzat, illetve falzsaluzat); így nyerik el a végtermék a végső formáját. IV A kitároláshoz egy targoncát használunk. A konténer-emelő a meglévő teherautónk billenő felépítményeként fogjuk használni a félkész és kész áruk mozgatásához. V. A vasmegmunkáló gépsor jelentős energiafelhasználást fog előidézni. Ehhez egy háztartási méretű kis erőmű segítségével alternatív energia előállítást fogunk biztosítani. VI Cégünk jelenleg már működtet vállalatirányítási szoftvert, mely néhány funkciót lefed. A projekt során a jelenlegi szoftver-megoldásokat egy komplett, a gyártást és vállalati gazdálkodást összekötő IPAR 4.0 megoldással fogjuk cserélni. Ez hat funkcionális célterület kialakítását jelenti. Ezek a célterületek: vállalati CRM értékesítés, humánerőforrás és menedzsment, kontrolling és döntéstámogatási rendszer, beszerzés és logisztika, táv- és csoportmunkák támogatása, és elektronikus iratkezelés. (Hungarian)
0 references
As part of the project, we plan to purchase the following tools: — aqueous grading equipment and depot tapes which allow high-quality basic material processing and solve their deposition; — chained dredger and rubber wheel loader — to ensure loading and storage of raw materials; — using the bridge balance, we record the quantities issued and transmit the data to the corporate governance system; — the bench roller is used to improve the terrain in depot and during the transport of material handling equipment; With the help of 50 kWp HMKE solar panel, we intend to provide part of the used electrical energy for the machines to be purchased. Our company intends to implement a technology chain during the planned project with the following elements: I machinery and equipment used for the processing of the raw material (slapping, grading equipment); II material handling machines (hydraulic chain excavator, rubber wheel excavator); III from the processed and graded materials, through the mobile concrete mixer, semi-finished products are produced, which are poured into formwork forms (concrete block formwork or wall formwork) after proper and planned ironing (for this purpose by the stirrer of concrete iron). this is how the final product is obtained in its final form. IV For removal, a forklift is used. The container lift will be used as a tilting superstructure of our existing truck to move semi-finished and finished goods. V. The iron machining line will generate significant energy use. We will provide alternative energy production with the help of a small power plant of a household size. VI Our company already operates corporate management software, which covers some features. During the project, the current software solutions will be replaced by a complete IPAR 4.0 solution linking production and corporate management. This involves the development of six functional target areas. These target areas are: corporate CRM sales, human resources and management, controlling and decision support systems, procurement and logistics, support for remote and group work, and electronic document management. (English)
8 February 2022
0 references
Szekszárd, Tolna
0 references
Identifiers
GINOP-1.2.1-16-2017-00390
0 references