Property / summary
 
Assets to be procured and their functions: 1pcs combined steel machining: machining of versatile sections for punching metal elements, cutting profiles, cutting rod materials; 1pcs plate rolling machine: performing multi-operation phases of steel and precious metals; 1pcs 0-3, 1pcs 0-13 disc shears, 1 pcs band saw, 1 pcs circular saw,1pcs panel cutter disc saw: cutting different types of metal elements to size; 1 pcs plasma cutter: cutting plates to size and drilling them into position; 1pcs excenter press machine for positioning of steel plates and profiles to size; 1pcs bib,1pcs manual plate edge bending: machining and bending of steel sheets; 2pcs belt grinders: cleaning and deburring of rough surfaces of cut steel structures; 4pcs welding machine and 2 pcs of aluminum welding: welding activities;4pcs welding box: spatial separation of welding technology process; 4pcs extraction equipment: extraction of resulting gases;1pcs 35 mm, 1pcs 80 mm magnetic track drilling machine for large steel elements drilling; 1pcs dust spraying kabin:acélszerkezetek surface cleaning; 3pcs compressor: air-insurance for compressed air equipment; 2pcs 2400x1200, 2 pcs 2000x1000 assembly tables to be manufactured; 2pcs forklifts: movement of materials; 2 bridge crane: to move large-scale steel bodies. Production management, controlling and decision support system: optimisation of administration The hall necessary for storing, protecting and working equipment will also be built. The hall will have a 715 m² multifunctional interior. Unit costs per square metre range between HUF 95,000 and HUF 100,000/m². On the management side, the project does not carry any risk, since as general contractor they have considerable experience in the field of manufacturing and application of metal structures, and they also have a qualified workforce. According to their preliminary calculations, the project will have a significant added-value effect on the company. The value added in 2015 was 212,981 MFt. Thanks to the development, it can reach 371 MFt in 2019, while the value added per capita will rise from 14.2 MFt to 14.9 Mt. Preparatory activities carried out: preparation of plans related to real estate investment, start of authorisation, registration of the new site. The company has BS EN ISO 9001:2009 quality management system, MSZ EN ISO 14001:2005 environmental management system and MSZ 28001:2008 (BS OHSAS 18001:2007) occupational health and safety management system, the certificate of which is attached to the application. In the framework of this project, the company develops its intelligent production management and decision support system based on the analysis and processing of objectively collected data from production. The company’s ownership consists of more than 51 % of young entrepreneurs (under the age of 35). To prove this, the articles of association and the extract from the company are attached as an annex to the tender. (English)
Property / summary: Assets to be procured and their functions: 1pcs combined steel machining: machining of versatile sections for punching metal elements, cutting profiles, cutting rod materials; 1pcs plate rolling machine: performing multi-operation phases of steel and precious metals; 1pcs 0-3, 1pcs 0-13 disc shears, 1 pcs band saw, 1 pcs circular saw,1pcs panel cutter disc saw: cutting different types of metal elements to size; 1 pcs plasma cutter: cutting plates to size and drilling them into position; 1pcs excenter press machine for positioning of steel plates and profiles to size; 1pcs bib,1pcs manual plate edge bending: machining and bending of steel sheets; 2pcs belt grinders: cleaning and deburring of rough surfaces of cut steel structures; 4pcs welding machine and 2 pcs of aluminum welding: welding activities;4pcs welding box: spatial separation of welding technology process; 4pcs extraction equipment: extraction of resulting gases;1pcs 35 mm, 1pcs 80 mm magnetic track drilling machine for large steel elements drilling; 1pcs dust spraying kabin:acélszerkezetek surface cleaning; 3pcs compressor: air-insurance for compressed air equipment; 2pcs 2400x1200, 2 pcs 2000x1000 assembly tables to be manufactured; 2pcs forklifts: movement of materials; 2 bridge crane: to move large-scale steel bodies. Production management, controlling and decision support system: optimisation of administration The hall necessary for storing, protecting and working equipment will also be built. The hall will have a 715 m² multifunctional interior. Unit costs per square metre range between HUF 95,000 and HUF 100,000/m². On the management side, the project does not carry any risk, since as general contractor they have considerable experience in the field of manufacturing and application of metal structures, and they also have a qualified workforce. According to their preliminary calculations, the project will have a significant added-value effect on the company. The value added in 2015 was 212,981 MFt. Thanks to the development, it can reach 371 MFt in 2019, while the value added per capita will rise from 14.2 MFt to 14.9 Mt. Preparatory activities carried out: preparation of plans related to real estate investment, start of authorisation, registration of the new site. The company has BS EN ISO 9001:2009 quality management system, MSZ EN ISO 14001:2005 environmental management system and MSZ 28001:2008 (BS OHSAS 18001:2007) occupational health and safety management system, the certificate of which is attached to the application. In the framework of this project, the company develops its intelligent production management and decision support system based on the analysis and processing of objectively collected data from production. The company’s ownership consists of more than 51 % of young entrepreneurs (under the age of 35). To prove this, the articles of association and the extract from the company are attached as an annex to the tender. (English) / rank
 
Normal rank
Property / summary: Assets to be procured and their functions: 1pcs combined steel machining: machining of versatile sections for punching metal elements, cutting profiles, cutting rod materials; 1pcs plate rolling machine: performing multi-operation phases of steel and precious metals; 1pcs 0-3, 1pcs 0-13 disc shears, 1 pcs band saw, 1 pcs circular saw,1pcs panel cutter disc saw: cutting different types of metal elements to size; 1 pcs plasma cutter: cutting plates to size and drilling them into position; 1pcs excenter press machine for positioning of steel plates and profiles to size; 1pcs bib,1pcs manual plate edge bending: machining and bending of steel sheets; 2pcs belt grinders: cleaning and deburring of rough surfaces of cut steel structures; 4pcs welding machine and 2 pcs of aluminum welding: welding activities;4pcs welding box: spatial separation of welding technology process; 4pcs extraction equipment: extraction of resulting gases;1pcs 35 mm, 1pcs 80 mm magnetic track drilling machine for large steel elements drilling; 1pcs dust spraying kabin:acélszerkezetek surface cleaning; 3pcs compressor: air-insurance for compressed air equipment; 2pcs 2400x1200, 2 pcs 2000x1000 assembly tables to be manufactured; 2pcs forklifts: movement of materials; 2 bridge crane: to move large-scale steel bodies. Production management, controlling and decision support system: optimisation of administration The hall necessary for storing, protecting and working equipment will also be built. The hall will have a 715 m² multifunctional interior. Unit costs per square metre range between HUF 95,000 and HUF 100,000/m². On the management side, the project does not carry any risk, since as general contractor they have considerable experience in the field of manufacturing and application of metal structures, and they also have a qualified workforce. According to their preliminary calculations, the project will have a significant added-value effect on the company. The value added in 2015 was 212,981 MFt. Thanks to the development, it can reach 371 MFt in 2019, while the value added per capita will rise from 14.2 MFt to 14.9 Mt. Preparatory activities carried out: preparation of plans related to real estate investment, start of authorisation, registration of the new site. The company has BS EN ISO 9001:2009 quality management system, MSZ EN ISO 14001:2005 environmental management system and MSZ 28001:2008 (BS OHSAS 18001:2007) occupational health and safety management system, the certificate of which is attached to the application. In the framework of this project, the company develops its intelligent production management and decision support system based on the analysis and processing of objectively collected data from production. The company’s ownership consists of more than 51 % of young entrepreneurs (under the age of 35). To prove this, the articles of association and the extract from the company are attached as an annex to the tender. (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:35, 8 February 2022

Project Q3915482 in Hungary
Language Label Description Also known as
English
Expansion of production capacity at Szilvási Építő Kft.
Project Q3915482 in Hungary

    Statements

    0 references
    286,728,800 forint
    0 references
    792,865.34 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    1,567,618.376 Euro
    0.0027336256 Euro
    14 December 2021
    0 references
    573,457,600.0 forint
    0 references
    50.0 percent
    0 references
    13 July 2018
    0 references
    30 January 2020
    0 references
    SZILVÁSI Építő, Beruházó, Kereskedő és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°48'35.10"N, 20°33'57.92"E
    0 references
    A beszerzendő eszközök és funkcióik: 1db kombinált acélmegmunkáló: sokoldalú idomacélok megmunkálása fémelemek lyukasztása, profilok darabolása, rúdanyagok vágására; 1db lemezhengerítő gép: acél és nemesfémek többműveletes munkafázisainak elvégzése; 1db 0-3-as, 1db 0-13-as lemezolló, 1db szalagfűrész, 1db körfűrész,1db panelvágó tárcsás fűrész: különböző típusú fém elemek méretre vágása; 1db plazmavágó: lemezek méretre vágása, illetve pozícióba fúrása; 1db excenteres présgép az acéllemezek és profilok méretre való pozíciós préselésére; 1db élhajlító,1db kézi lemez élhajlító: acéllemez megmunkálása, élhajlítása; 2db szalagcsiszoló: darabolt acélszerkezetek durva felületeinek tisztítására, sorjázásásra; 4db hegesztőgép és 2db alu hegesztő: hegesztési tevékenységek;4db hegesztőbox: hegesztőtechnológiai folyamat térbeli elválasztása; 4db elszívó berendezés: keletkező gázok elszívása;1db 35mm, 1db 80mm mágnestalpas fúrógép nagyméretű acél elemek fúrása; 1db porszóró kabin:acélszerkezetek felület tisztítása; 3db kompresszor: sűrített levegőt felhasználó berendezések levegőbiztosítása; 2db 2400x1200, 2 db 2000x1000 összeállító asztal? gyártandó elemek összeállítása; 2db targonca: anyagok mozgatása; 2 db híddaru: nagytömegű acél testek mozdítására. Termelésirányítási, kontrolling és döntéstámogató rendszer: adminisztráció optimalizálása Az eszközök tárolásához, megóvásához, munkavégzéshez szükséges csarnok megépítésére is sor kerül. A csarnok 715 m2-es többfunkciós belső térrel fog rendelkezni. Az egy négyzetméterre jutó fajlagos költség 95.000-100.000 Ft/m2 között mozog. A menedzsment oldaláról a projekt nem hordoz kockázatot, hiszen generálkivitelezőként jelentős tapasztalattal rendelkeznek a fémszerkezetek gyártásnak és alkalmazásának területén és a megfelelő képzettségű munkaerő is rendelkezésükre áll. Előzetes kalkulációik szerint a projekt jelentős hozzáadott-érték növelő hatással lesz a cégre. A hozzáadott érték 2015-ben 212,981 MFt volt. A fejlesztés révén 2019-ben számításaink szerint elérheti a 371 MFt-ot, míg az egy főre jutó hozzáadott érték a 14,2 MFt-ról 14, 9 MFt-ra emelkedik. Az elvégzett előkészítési tevékenységek: ingatlan beruházáshoz kapcsolódó tervek elkészítése, engedélyeztetés elindítása, az új telephely bejegyzése. A vállalkozás rendelkezik BS EN ISO 9001:2009 minőségirányítási rendszerrel, MSZ EN ISO 14001:2005 környezetirányítási rendszerrel és MSZ 28001:2008 (BS OHSAS 18001:2007) munkahelyi egészségvédelem és biztonság irányítási rendszerrel, melyekről a tanúsítvány a pályázat mellékleteként csatolásra került. A vállalkozás jelen projekt keretében fejleszti termelésből objektív módon gyűjtött adatok elemzésén és feldolgozásán alapuló, fejlett automatizáltságú intelligens termelésirányítási és döntéstámogató rendszerét. A vállalkozás tulajdonosi köre 51%-ot meghaladó mértékben fiatal (35 év alatti) vállalkozókból áll. Ennek igazolására a pályázat mellékleteként a társasági szerződés és a cégkivonat csatolásra került. (Hungarian)
    0 references
    Assets to be procured and their functions: 1pcs combined steel machining: machining of versatile sections for punching metal elements, cutting profiles, cutting rod materials; 1pcs plate rolling machine: performing multi-operation phases of steel and precious metals; 1pcs 0-3, 1pcs 0-13 disc shears, 1 pcs band saw, 1 pcs circular saw,1pcs panel cutter disc saw: cutting different types of metal elements to size; 1 pcs plasma cutter: cutting plates to size and drilling them into position; 1pcs excenter press machine for positioning of steel plates and profiles to size; 1pcs bib,1pcs manual plate edge bending: machining and bending of steel sheets; 2pcs belt grinders: cleaning and deburring of rough surfaces of cut steel structures; 4pcs welding machine and 2 pcs of aluminum welding: welding activities;4pcs welding box: spatial separation of welding technology process; 4pcs extraction equipment: extraction of resulting gases;1pcs 35 mm, 1pcs 80 mm magnetic track drilling machine for large steel elements drilling; 1pcs dust spraying kabin:acélszerkezetek surface cleaning; 3pcs compressor: air-insurance for compressed air equipment; 2pcs 2400x1200, 2 pcs 2000x1000 assembly tables to be manufactured; 2pcs forklifts: movement of materials; 2 bridge crane: to move large-scale steel bodies. Production management, controlling and decision support system: optimisation of administration The hall necessary for storing, protecting and working equipment will also be built. The hall will have a 715 m² multifunctional interior. Unit costs per square metre range between HUF 95,000 and HUF 100,000/m². On the management side, the project does not carry any risk, since as general contractor they have considerable experience in the field of manufacturing and application of metal structures, and they also have a qualified workforce. According to their preliminary calculations, the project will have a significant added-value effect on the company. The value added in 2015 was 212,981 MFt. Thanks to the development, it can reach 371 MFt in 2019, while the value added per capita will rise from 14.2 MFt to 14.9 Mt. Preparatory activities carried out: preparation of plans related to real estate investment, start of authorisation, registration of the new site. The company has BS EN ISO 9001:2009 quality management system, MSZ EN ISO 14001:2005 environmental management system and MSZ 28001:2008 (BS OHSAS 18001:2007) occupational health and safety management system, the certificate of which is attached to the application. In the framework of this project, the company develops its intelligent production management and decision support system based on the analysis and processing of objectively collected data from production. The company’s ownership consists of more than 51 % of young entrepreneurs (under the age of 35). To prove this, the articles of association and the extract from the company are attached as an annex to the tender. (English)
    8 February 2022
    0 references
    Mezőkövesd, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    GINOP-1.2.1-16-2017-00279