Expansion of the production capacity of the thermal insulation production line at Fenster Technik Seifert Kft. (Q3913983): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
1. Preparation of glass from the warehouse. 2. Sizing and preparation of glass. 3. Filling aluminium spacer profiles or plastic profiles with dehumidifiers. 4. Lebutylisation of spacer profiles and preparation in front of the assembly unit. 5. Putting glass on the production line 6. Positioning of aluminium or plastic spacer on glass after washing and drying. 7. Automatic glass positioning into the production line press unit. 8. Automatic gas filling on the production line. 9. Automatic pressing. (2 bottles and spacer profile between it and the spacer profile by primary sealing, forming a sandwich structure) 10. After that, the sealant on the rotating table is applied to the secondary sealant using a 2 component sealing machine. 11. Drying in open space. 12. Delivery to the customer after 24 hours drying. (English) | |||||||||||||||
Property / summary: 1. Preparation of glass from the warehouse. 2. Sizing and preparation of glass. 3. Filling aluminium spacer profiles or plastic profiles with dehumidifiers. 4. Lebutylisation of spacer profiles and preparation in front of the assembly unit. 5. Putting glass on the production line 6. Positioning of aluminium or plastic spacer on glass after washing and drying. 7. Automatic glass positioning into the production line press unit. 8. Automatic gas filling on the production line. 9. Automatic pressing. (2 bottles and spacer profile between it and the spacer profile by primary sealing, forming a sandwich structure) 10. After that, the sealant on the rotating table is applied to the secondary sealant using a 2 component sealing machine. 11. Drying in open space. 12. Delivery to the customer after 24 hours drying. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: 1. Preparation of glass from the warehouse. 2. Sizing and preparation of glass. 3. Filling aluminium spacer profiles or plastic profiles with dehumidifiers. 4. Lebutylisation of spacer profiles and preparation in front of the assembly unit. 5. Putting glass on the production line 6. Positioning of aluminium or plastic spacer on glass after washing and drying. 7. Automatic glass positioning into the production line press unit. 8. Automatic gas filling on the production line. 9. Automatic pressing. (2 bottles and spacer profile between it and the spacer profile by primary sealing, forming a sandwich structure) 10. After that, the sealant on the rotating table is applied to the secondary sealant using a 2 component sealing machine. 11. Drying in open space. 12. Delivery to the customer after 24 hours drying. (English) / qualifier | |||||||||||||||
point in time: 8 February 2022
|
Revision as of 14:09, 8 February 2022
Project Q3913983 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Expansion of the production capacity of the thermal insulation production line at Fenster Technik Seifert Kft. |
Project Q3913983 in Hungary |
Statements
177,294,586 forint
0 references
1,077,015.598 Euro
0.0027336256 Euro
14 December 2021
0 references
393,987,968.889 forint
0 references
45.0 percent
0 references
30 October 2015
0 references
23 December 2016
0 references
Fenster Technik Seifert Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
1. Üveg előkészítése a raktárból. 2. Üveg méretre szabása, előkészítése. 3. Aluminium távtartó profilok, vagy műanyag profilok páramentesítővel történő megtöltése. 4. A távtartó profilok lebutilozása és az összeállító egység elé történő előkészítése. 5. Üveg felrakása a gépsorra 6. A mosást és szárítást követően az üvegre történő aluminium vagy műanyag távtartó felpozicionálása. 7. Automatikus üveg pozicionálás a gépsor présegységébe. 8. Automatikus gáztöltés a gépsoron. 9. Automatikus préselés.( 2 üveg és a közte lévő távtartó profil primer tömítéssel történő lepréselése, mely egy szendvicsszerkezetet alkot) 10. Ezt követően a tömítő forgató asztalon a szekunder tömítő felhordása 2 komponensű tömítőgép segítségével. 11. Nyílt térben történő száradás. 12. 24 órás száradás után kiszállítás a vevőnek. (Hungarian)
0 references
1. Preparation of glass from the warehouse. 2. Sizing and preparation of glass. 3. Filling aluminium spacer profiles or plastic profiles with dehumidifiers. 4. Lebutylisation of spacer profiles and preparation in front of the assembly unit. 5. Putting glass on the production line 6. Positioning of aluminium or plastic spacer on glass after washing and drying. 7. Automatic glass positioning into the production line press unit. 8. Automatic gas filling on the production line. 9. Automatic pressing. (2 bottles and spacer profile between it and the spacer profile by primary sealing, forming a sandwich structure) 10. After that, the sealant on the rotating table is applied to the secondary sealant using a 2 component sealing machine. 11. Drying in open space. 12. Delivery to the customer after 24 hours drying. (English)
8 February 2022
0 references
Szentgotthárd, Vas
0 references
Identifiers
GINOP-1.2.1-15-2015-00199
0 references