GÁRDONYI ZOLTÁN REFORMED PRIMARY SCHOOL AND PRIMARY ART SCHOOL INFRASTRUCTURE DEVELOPMENT BIHARKERESZTES (Q3903552): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
The draft for the extension of the Gárdonyi Zoltán Reformed Primary School and Primary Art School fully complies with the applicable laws and standards. The institution concerned by the investment is currently operating in two places of responsibility. Education of the lower section is owned by the parish, 4110 Biharkeresztes, Damjanich street 21, Hrsz.: It takes place in real estates under 185. The training of the upper section is currently 4110 Biharkeresztes, Kossuth utca 52, Hrsz.: It takes place in a municipal property located under 1244. The buildings used for educational purposes do not comply separately and together with the current standard MSzE 24203-2:2012. The self-occupied building needs to be renovated and upgraded, and the state of the municipal building has deteriorated considerably both externally and internally. One of the strong plans of the Church community is to standardise the school by combining the education of its lower and upper students into a place of assignment — creating conditions for higher quality education, contributing to the improvement of the educational infrastructure and the children’s school environment. The merger is owned by the institution and is currently used for educational purposes: It is intended to be implemented in 185 locations. In the course of the design concept, it became clear that the extent of the area alone does not provide sufficient conditions for the planned school building expansion to comply with the requirements of the MSzE 24203-2:2012 standard and to comply with the requirements of the Biharkeresztes Local Construction Rules. In order to promote feasibility, the Church has purchased the 4110 Biharkeresztes, Széchenyi Street 31, Széchenyi utca 31, Hrsz.: The entire property located below 227, with which sufficient space is available for the investment. The planned school extension of the tender amount is not feasible in its entirety, therefore the investment schedule is necessary to ensure that, if the future financial situation of the institution so permits, the next phase of the education infrastructure can be completed. The investment will be realised in 2 phases, phase I will become feasible in the present project. Standardisation can only be achieved with a certain re-organisation of the existing school premises. In terms of classrooms and the current number of pupils in the existing school building, the size of the social blocks is appropriate, but taking into account the complex building, it would be preferable to move the classroom in the south-east corner of the building to the current, non-standard Teacher Room and the Ceramic Workshop. The ceramic workshop would be replaced by this classroom. The Director’s Office, the Economic Office and the Archives will be abolished and replaced by an individual developer and speech therapist. From now on, the group of Teacher’s Toilets and Toilets will serve the cleaning staff. The basement level mechanical space will continue to operate in the same way, no other changes will be made in the existing school building. The planned extension of buildings must adapt to both terrain and land conditions. Taking this into account, a side corridor building will be constructed which can meet the standard room requirements for an elementary school with 8 classes on 3 levels. The levels of the existing and planned building could not be brought to the same plane due to the change in the terrain, therefore, after crossing the ground floor, there is of course a two-sided elevator next to the stairs to ensure unobstructed traffic in the building. Due to the length of the side corridor and fire control reasons, two staircases were installed in the planned building. On the ground floor side corridor, the necessary premises of the administration (director’s office, deputy director’s office, business office, administrative room) and the teaching staff (teacher room, teacher changing room, kitchenette, teacher resting room) as well as a specialised classroom with the corresponding merchandise, and groups of toilets designed by gender were located. In addition to the ground floor, the basement floor below the ground floor would be realised as part of Phase I. On this floor there would be 4 classrooms attached to the side corridor, a specialised classroom with the related merchandise, the toilet groups formed by gender, and a closed mechanical room next to the elevator. In the street shoe corridor, you can access the one through changing rooms for each gender belonging to the gym “A” and the medical room. The gymnastics room can be accessed from the sneaker corridor. It is also possible to access the ballroom toilet unit from the sneaker corridor, according to the standard without touching the changing rooms. The clean interior size of the gym is 15 x 30 m, and there are two fittings, the combined size of which meets the standard minimum 60 m². (English) | |||||||||||||||
Property / summary: The draft for the extension of the Gárdonyi Zoltán Reformed Primary School and Primary Art School fully complies with the applicable laws and standards. The institution concerned by the investment is currently operating in two places of responsibility. Education of the lower section is owned by the parish, 4110 Biharkeresztes, Damjanich street 21, Hrsz.: It takes place in real estates under 185. The training of the upper section is currently 4110 Biharkeresztes, Kossuth utca 52, Hrsz.: It takes place in a municipal property located under 1244. The buildings used for educational purposes do not comply separately and together with the current standard MSzE 24203-2:2012. The self-occupied building needs to be renovated and upgraded, and the state of the municipal building has deteriorated considerably both externally and internally. One of the strong plans of the Church community is to standardise the school by combining the education of its lower and upper students into a place of assignment — creating conditions for higher quality education, contributing to the improvement of the educational infrastructure and the children’s school environment. The merger is owned by the institution and is currently used for educational purposes: It is intended to be implemented in 185 locations. In the course of the design concept, it became clear that the extent of the area alone does not provide sufficient conditions for the planned school building expansion to comply with the requirements of the MSzE 24203-2:2012 standard and to comply with the requirements of the Biharkeresztes Local Construction Rules. In order to promote feasibility, the Church has purchased the 4110 Biharkeresztes, Széchenyi Street 31, Széchenyi utca 31, Hrsz.: The entire property located below 227, with which sufficient space is available for the investment. The planned school extension of the tender amount is not feasible in its entirety, therefore the investment schedule is necessary to ensure that, if the future financial situation of the institution so permits, the next phase of the education infrastructure can be completed. The investment will be realised in 2 phases, phase I will become feasible in the present project. Standardisation can only be achieved with a certain re-organisation of the existing school premises. In terms of classrooms and the current number of pupils in the existing school building, the size of the social blocks is appropriate, but taking into account the complex building, it would be preferable to move the classroom in the south-east corner of the building to the current, non-standard Teacher Room and the Ceramic Workshop. The ceramic workshop would be replaced by this classroom. The Director’s Office, the Economic Office and the Archives will be abolished and replaced by an individual developer and speech therapist. From now on, the group of Teacher’s Toilets and Toilets will serve the cleaning staff. The basement level mechanical space will continue to operate in the same way, no other changes will be made in the existing school building. The planned extension of buildings must adapt to both terrain and land conditions. Taking this into account, a side corridor building will be constructed which can meet the standard room requirements for an elementary school with 8 classes on 3 levels. The levels of the existing and planned building could not be brought to the same plane due to the change in the terrain, therefore, after crossing the ground floor, there is of course a two-sided elevator next to the stairs to ensure unobstructed traffic in the building. Due to the length of the side corridor and fire control reasons, two staircases were installed in the planned building. On the ground floor side corridor, the necessary premises of the administration (director’s office, deputy director’s office, business office, administrative room) and the teaching staff (teacher room, teacher changing room, kitchenette, teacher resting room) as well as a specialised classroom with the corresponding merchandise, and groups of toilets designed by gender were located. In addition to the ground floor, the basement floor below the ground floor would be realised as part of Phase I. On this floor there would be 4 classrooms attached to the side corridor, a specialised classroom with the related merchandise, the toilet groups formed by gender, and a closed mechanical room next to the elevator. In the street shoe corridor, you can access the one through changing rooms for each gender belonging to the gym “A” and the medical room. The gymnastics room can be accessed from the sneaker corridor. It is also possible to access the ballroom toilet unit from the sneaker corridor, according to the standard without touching the changing rooms. The clean interior size of the gym is 15 x 30 m, and there are two fittings, the combined size of which meets the standard minimum 60 m². (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The draft for the extension of the Gárdonyi Zoltán Reformed Primary School and Primary Art School fully complies with the applicable laws and standards. The institution concerned by the investment is currently operating in two places of responsibility. Education of the lower section is owned by the parish, 4110 Biharkeresztes, Damjanich street 21, Hrsz.: It takes place in real estates under 185. The training of the upper section is currently 4110 Biharkeresztes, Kossuth utca 52, Hrsz.: It takes place in a municipal property located under 1244. The buildings used for educational purposes do not comply separately and together with the current standard MSzE 24203-2:2012. The self-occupied building needs to be renovated and upgraded, and the state of the municipal building has deteriorated considerably both externally and internally. One of the strong plans of the Church community is to standardise the school by combining the education of its lower and upper students into a place of assignment — creating conditions for higher quality education, contributing to the improvement of the educational infrastructure and the children’s school environment. The merger is owned by the institution and is currently used for educational purposes: It is intended to be implemented in 185 locations. In the course of the design concept, it became clear that the extent of the area alone does not provide sufficient conditions for the planned school building expansion to comply with the requirements of the MSzE 24203-2:2012 standard and to comply with the requirements of the Biharkeresztes Local Construction Rules. In order to promote feasibility, the Church has purchased the 4110 Biharkeresztes, Széchenyi Street 31, Széchenyi utca 31, Hrsz.: The entire property located below 227, with which sufficient space is available for the investment. The planned school extension of the tender amount is not feasible in its entirety, therefore the investment schedule is necessary to ensure that, if the future financial situation of the institution so permits, the next phase of the education infrastructure can be completed. The investment will be realised in 2 phases, phase I will become feasible in the present project. Standardisation can only be achieved with a certain re-organisation of the existing school premises. In terms of classrooms and the current number of pupils in the existing school building, the size of the social blocks is appropriate, but taking into account the complex building, it would be preferable to move the classroom in the south-east corner of the building to the current, non-standard Teacher Room and the Ceramic Workshop. The ceramic workshop would be replaced by this classroom. The Director’s Office, the Economic Office and the Archives will be abolished and replaced by an individual developer and speech therapist. From now on, the group of Teacher’s Toilets and Toilets will serve the cleaning staff. The basement level mechanical space will continue to operate in the same way, no other changes will be made in the existing school building. The planned extension of buildings must adapt to both terrain and land conditions. Taking this into account, a side corridor building will be constructed which can meet the standard room requirements for an elementary school with 8 classes on 3 levels. The levels of the existing and planned building could not be brought to the same plane due to the change in the terrain, therefore, after crossing the ground floor, there is of course a two-sided elevator next to the stairs to ensure unobstructed traffic in the building. Due to the length of the side corridor and fire control reasons, two staircases were installed in the planned building. On the ground floor side corridor, the necessary premises of the administration (director’s office, deputy director’s office, business office, administrative room) and the teaching staff (teacher room, teacher changing room, kitchenette, teacher resting room) as well as a specialised classroom with the corresponding merchandise, and groups of toilets designed by gender were located. In addition to the ground floor, the basement floor below the ground floor would be realised as part of Phase I. On this floor there would be 4 classrooms attached to the side corridor, a specialised classroom with the related merchandise, the toilet groups formed by gender, and a closed mechanical room next to the elevator. In the street shoe corridor, you can access the one through changing rooms for each gender belonging to the gym “A” and the medical room. The gymnastics room can be accessed from the sneaker corridor. It is also possible to access the ballroom toilet unit from the sneaker corridor, according to the standard without touching the changing rooms. The clean interior size of the gym is 15 x 30 m, and there are two fittings, the combined size of which meets the standard minimum 60 m². (English) / qualifier | |||||||||||||||
point in time: 8 February 2022
|
Revision as of 13:48, 8 February 2022
Project Q3903552 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | GÁRDONYI ZOLTÁN REFORMED PRIMARY SCHOOL AND PRIMARY ART SCHOOL INFRASTRUCTURE DEVELOPMENT BIHARKERESZTES |
Project Q3903552 in Hungary |
Statements
499,880,218 forint
0 references
1,607,629.836 Euro
0.0027336256 Euro
14 December 2021
0 references
588,094,374.118 forint
0 references
85.0 percent
0 references
1 March 2020
0 references
30 May 2022
0 references
Biharkeresztesi Református Egyházközség
0 references
A Gárdonyi Zoltán Református Általános Iskola és Alapfokú Művészeti Iskola bővítésére készített tervezet teljes mértékben megfelel a hatályos jogszabályoknak és szabványoknak. A beruházással érintett intézmény jelenleg két feladatellátási helyen üzemel. Az alsó tagozat oktatása az egyházközség saját tulajdonában lévő 4110 Biharkeresztes, Damjanich utca 21., Hrsz.: 185 alatt található ingatlanban folyik. A felső tagozat képzése pedig jelenleg a 4110 Biharkeresztes, Kossuth utca 52., Hrsz.: 1244 alatt található önkormányzati tulajdonú ingatlanban történik. Az oktatási célra használt épületek külön-külön, és együtt sem felelnek meg a jelenleg hatályos MSZE 24203-2:2012 szabványnak. A saját tulajdonban található épület belső felújításra és korszerűsítésre szorul, valamint az önkormányzati épület állapota külső és belső tekintetben is meglehetősen leromlott. Az Egyházközség határozott tervei között szerepel, hogy alsó és felső tagozatos tanulóinak oktatását egy feladatellátási helyre összevonva szabványosítsa az iskolát - feltételeket teremtve a magasabb színvonalú oktatásnak, hozzájárulva az oktatási infrastruktúra, valamit a gyermekek iskolai környezetének javításához. Az összevonást az intézmény saját tulajdonában álló, jelenleg is oktatási célra használt Hrsz.: 185 alatt található helyszínen kívánja megvalósítani. A tervezési koncepció megalkotása során egyértelművé vált, hogy a terület kiterjedése önmagában nem nyújt elegendő feltételeket ahhoz, hogy a tervezett iskolaépület-bővítés kielégítse az MSZE 24203-2:2012 szabványban leírtakat és megfeleljen Biharkeresztes Helyi Építési Szabályzatában foglaltaknak. Az Egyházközség a megvalósíthatóság elősegítésének érdekében saját erőből megvásárolta a jelenlegi terület hátsó telekszomszédságában található 4110 Biharkeresztes, Széchenyi utca 31., Hrsz.: 227 alatt található teljes ingatlant, amellyel kiegészítve megfelelő nagyságú terület áll rendelkezésre a beruházáshoz. A tervezett iskolabővítés a pályázati összegből teljes egészében nem megvalósítható, ezért szükség van a beruházás ütemezésére, mely biztosítja annak lehetőségét, hogy amennyiben az intézmény jövőbeni anyagi helyzete megengedi, akkor megépítve a következő ütemet teljessé válhasson az oktatási infrastruktúra. A beruházás 2 ütemben valósul meg, jelen projektben az I. ütem válik megvalósíthatóvá. A szabványosítás csakis a meglévő iskolaépület helyiségeink bizonyos mértékű újra átszervezésével együtt tud létrejönni. A meglévő iskolaépületben a tantermek és a jelenlegi tanulói létszám tekintetében a szociális blokkok méretezése megfelelő, azonban a komplex épületet figyelembe véve kedvezőbb lenne az épület délkeleti sarkában lévő tantermet áthelyezni a jelenlegi, szabványnak nem megfelelő Tanári Szoba és a Kerámia műhely helyére. A kerámia műhely az említett tanterem helyére kerülne át. Az Igazgatói iroda, a Gazdasági iroda és az Irattár megszűntetetésre kerül, helyükre Egyéni fejlesztő és logopédiai foglalkoztató kerül. Az eddigi Tanári mosdó és WC együttese ezentúl a takarító személyzetet szolgája majd ki. A pinceszinti gépészeti tér változatlanul üzemel tovább, a meglévő iskolaépületben egyéb változás nem történik. A tervezett épületbővítésnek alkalmazkodnia kell a terep- és telekviszonyokhoz egyaránt. Ezeket figyelembe véve egy oldalfolyosós épület kerül kialakításra, mely 3 szinten tudja teljesíteni a szabványban előírt helyiségigényt egy 8 osztállyal működő általános iskola esetében. A meglévő és tervezett épület szintjeit a terepváltozás miatt nem lehetett egy síkra hozni, ezért a földszinten való átközlekedés után a lépcső mellett természetesen egy kétoldali közlekedésre szolgáló lift biztosítja az akadálymentes közlekedést az épületben. A tervezett épületben az oldalfolyosó hosszúsága és tűzrendészeti okok miatt két lépcsőblokk került elhelyezésre. A földszinti oldalfolyosóra felfűzve kaptak helyet az igazgatás (igazgatói iroda, igazgatóhelyettesi iroda, gazdasági iroda, ügyviteli helyiség) és a tantestület (tantestületi szoba, tanári öltöző, teakonyha, tanári pihenő) szükséges helyiségei, valamint egy szaktanterem a hozzá tartozó szertárral, és a nemenként kialakított illemhelycsoportok. A földszint mellett az I. ütem részeként valósulna meg a földszint alatti pinceszint. Ezen a szinten kapna helyet az oldalfolyosóra felfűzve 4 tanterem, egy szaktanterem a hozzá tartozó szertárral, a nemenként kialakított illemhelycsoportok, illetve a lift mellett egy zárt gépészeti helyiség. Az utcai cipős folyosón közelíthető meg az ’A’ jelű tornateremhez tartozó, nemenként egy átmenős öltözők, valamint az orvosi szoba. A tornatanári szoba a tornacipős folyosóról közelíthető meg. Szintén a tornacipős folyosóról érhető el a küzdőtéri WC-k egysége, a szabvány kitétele szerint az öltözők érintése nélkül. A tornaterem tiszta belső mérete 15 x 30 m, hozzá kapcsolódóan két szertár került kialakításra, melynek együttes mérete teljesíti a szabvány szerinti min. 60 m2-t. (Hungarian)
0 references
The draft for the extension of the Gárdonyi Zoltán Reformed Primary School and Primary Art School fully complies with the applicable laws and standards. The institution concerned by the investment is currently operating in two places of responsibility. Education of the lower section is owned by the parish, 4110 Biharkeresztes, Damjanich street 21, Hrsz.: It takes place in real estates under 185. The training of the upper section is currently 4110 Biharkeresztes, Kossuth utca 52, Hrsz.: It takes place in a municipal property located under 1244. The buildings used for educational purposes do not comply separately and together with the current standard MSzE 24203-2:2012. The self-occupied building needs to be renovated and upgraded, and the state of the municipal building has deteriorated considerably both externally and internally. One of the strong plans of the Church community is to standardise the school by combining the education of its lower and upper students into a place of assignment — creating conditions for higher quality education, contributing to the improvement of the educational infrastructure and the children’s school environment. The merger is owned by the institution and is currently used for educational purposes: It is intended to be implemented in 185 locations. In the course of the design concept, it became clear that the extent of the area alone does not provide sufficient conditions for the planned school building expansion to comply with the requirements of the MSzE 24203-2:2012 standard and to comply with the requirements of the Biharkeresztes Local Construction Rules. In order to promote feasibility, the Church has purchased the 4110 Biharkeresztes, Széchenyi Street 31, Széchenyi utca 31, Hrsz.: The entire property located below 227, with which sufficient space is available for the investment. The planned school extension of the tender amount is not feasible in its entirety, therefore the investment schedule is necessary to ensure that, if the future financial situation of the institution so permits, the next phase of the education infrastructure can be completed. The investment will be realised in 2 phases, phase I will become feasible in the present project. Standardisation can only be achieved with a certain re-organisation of the existing school premises. In terms of classrooms and the current number of pupils in the existing school building, the size of the social blocks is appropriate, but taking into account the complex building, it would be preferable to move the classroom in the south-east corner of the building to the current, non-standard Teacher Room and the Ceramic Workshop. The ceramic workshop would be replaced by this classroom. The Director’s Office, the Economic Office and the Archives will be abolished and replaced by an individual developer and speech therapist. From now on, the group of Teacher’s Toilets and Toilets will serve the cleaning staff. The basement level mechanical space will continue to operate in the same way, no other changes will be made in the existing school building. The planned extension of buildings must adapt to both terrain and land conditions. Taking this into account, a side corridor building will be constructed which can meet the standard room requirements for an elementary school with 8 classes on 3 levels. The levels of the existing and planned building could not be brought to the same plane due to the change in the terrain, therefore, after crossing the ground floor, there is of course a two-sided elevator next to the stairs to ensure unobstructed traffic in the building. Due to the length of the side corridor and fire control reasons, two staircases were installed in the planned building. On the ground floor side corridor, the necessary premises of the administration (director’s office, deputy director’s office, business office, administrative room) and the teaching staff (teacher room, teacher changing room, kitchenette, teacher resting room) as well as a specialised classroom with the corresponding merchandise, and groups of toilets designed by gender were located. In addition to the ground floor, the basement floor below the ground floor would be realised as part of Phase I. On this floor there would be 4 classrooms attached to the side corridor, a specialised classroom with the related merchandise, the toilet groups formed by gender, and a closed mechanical room next to the elevator. In the street shoe corridor, you can access the one through changing rooms for each gender belonging to the gym “A” and the medical room. The gymnastics room can be accessed from the sneaker corridor. It is also possible to access the ballroom toilet unit from the sneaker corridor, according to the standard without touching the changing rooms. The clean interior size of the gym is 15 x 30 m, and there are two fittings, the combined size of which meets the standard minimum 60 m². (English)
8 February 2022
0 references
Biharkeresztes, Hajdú-Bihar
0 references
Identifiers
EFOP-4.1.5-16-2017-00093
0 references