Development of the educational and educational infrastructure environment of Ramassetter Vince Primary School of Physical Education (Q3903451): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
The aim of the project is to enhance the educational and educational performance of the institution, to strengthen inclusive education and to improve the quality of educational and educational services in a sustainable manner, and to strengthen equitable public education. The aim is to reduce early school leaving and school leaving without qualifications. In order to achieve the objectives, it is necessary to improve the infrastructural state and equipment of the institution. For this purpose, we submit an application for assistance for development in accordance with the attached technical and technical documents. Need arising: Physical education is one of the main educational and educational areas of the School, but the infrastructural conditions — the poor condition of the essential parts and premises of the building related to this field, as well as the lack of equipment — hinder the achievement and effective fulfilment of educational objectives in this direction. — the “dresser wing” of the previously renewed gym: lobby (yard and market entrance), gym room, ductory, corridor, dressing room, sanitary facilities have not been refurbished before, they are in very poor condition, do not meet the demands of the modern school. Due to the very high occupancy, the furniture of the changing rooms was also severely damaged. — floor defects: the final solution for the infiltration of the flat top of the locker wing would be the proper water and thermal insulation of the roof. — energy problems: the electrical system of the building part is completely damaged and unsafe — Scarcity and absence of adequate public spaces: there is no open-air community space in the schoolyard, while the 237 students of the lower class are in the school home system until 16:00. For them, it would be better to improve the efficiency of education by expanding the scenes of afternoon programmes and leisure activities if a suitable open-air community space was created. Objectives: Overall objective: Ensuring the lack of infrastructure conditions necessary for the quality, chance-creating and equitable educational and educational work of the Ramassetter Vince Primary School of Physical Education in Sümeg. Provide a built environment that supports health promotion, health education and health awareness. Milestone 2: Ensure the availability of tools to support health promotion, health education and health awareness. Activities: ‘in a changing building’: refurbishment of the small gym: replacement of casings, plaster repairs, painting works, installation of protective coverings? renovation of changing rooms, demolition of coverings, re-laying, plaster repairs, paintings and installation of chair protection boards? renovation of washbasin-touching-toilet rooms, replacement of existing wet equipment, shower separators, painting works? replacement of doors and doors in the entrance of the gym and dressing rooms, renovation of the electrical network of sports equipment, plaster replacements, painting works, renovation of roof structure, demolition of existing waterproofing, thermal insulation, new rainwater insulation, tinting. 456 m² electric system renewal in the Ramassetter building: refurbishment of changing-wash-WC premises, demolition, replacement, rendering of plaster, painting works, corridor painting works. in the courtyard: • in the area formed by the demolition of a former carbon pool, the construction of a surface covered with a steel-structured roof covering 50 m² by grassing of the surrounding area: one-sided dressing room bench, 190 cm (23 pcs)? One-sided dressing room bench, 120 cm (2 pcs) Acquisition of physical education and sports equipment, furniture and furniture to ensure the usability of the spaces involved in the infrastructural development 01.11.2017 (grant contract) — 31.10.2018 (physical implementation) Eligible cost: HUF 51 922.701 (English)
Property / summary: The aim of the project is to enhance the educational and educational performance of the institution, to strengthen inclusive education and to improve the quality of educational and educational services in a sustainable manner, and to strengthen equitable public education. The aim is to reduce early school leaving and school leaving without qualifications. In order to achieve the objectives, it is necessary to improve the infrastructural state and equipment of the institution. For this purpose, we submit an application for assistance for development in accordance with the attached technical and technical documents. Need arising: Physical education is one of the main educational and educational areas of the School, but the infrastructural conditions — the poor condition of the essential parts and premises of the building related to this field, as well as the lack of equipment — hinder the achievement and effective fulfilment of educational objectives in this direction. — the “dresser wing” of the previously renewed gym: lobby (yard and market entrance), gym room, ductory, corridor, dressing room, sanitary facilities have not been refurbished before, they are in very poor condition, do not meet the demands of the modern school. Due to the very high occupancy, the furniture of the changing rooms was also severely damaged. — floor defects: the final solution for the infiltration of the flat top of the locker wing would be the proper water and thermal insulation of the roof. — energy problems: the electrical system of the building part is completely damaged and unsafe — Scarcity and absence of adequate public spaces: there is no open-air community space in the schoolyard, while the 237 students of the lower class are in the school home system until 16:00. For them, it would be better to improve the efficiency of education by expanding the scenes of afternoon programmes and leisure activities if a suitable open-air community space was created. Objectives: Overall objective: Ensuring the lack of infrastructure conditions necessary for the quality, chance-creating and equitable educational and educational work of the Ramassetter Vince Primary School of Physical Education in Sümeg. Provide a built environment that supports health promotion, health education and health awareness. Milestone 2: Ensure the availability of tools to support health promotion, health education and health awareness. Activities: ‘in a changing building’: refurbishment of the small gym: replacement of casings, plaster repairs, painting works, installation of protective coverings? renovation of changing rooms, demolition of coverings, re-laying, plaster repairs, paintings and installation of chair protection boards? renovation of washbasin-touching-toilet rooms, replacement of existing wet equipment, shower separators, painting works? replacement of doors and doors in the entrance of the gym and dressing rooms, renovation of the electrical network of sports equipment, plaster replacements, painting works, renovation of roof structure, demolition of existing waterproofing, thermal insulation, new rainwater insulation, tinting. 456 m² electric system renewal in the Ramassetter building: refurbishment of changing-wash-WC premises, demolition, replacement, rendering of plaster, painting works, corridor painting works. in the courtyard: • in the area formed by the demolition of a former carbon pool, the construction of a surface covered with a steel-structured roof covering 50 m² by grassing of the surrounding area: one-sided dressing room bench, 190 cm (23 pcs)? One-sided dressing room bench, 120 cm (2 pcs) Acquisition of physical education and sports equipment, furniture and furniture to ensure the usability of the spaces involved in the infrastructural development 01.11.2017 (grant contract) — 31.10.2018 (physical implementation) Eligible cost: HUF 51 922.701 (English) / rank
 
Normal rank
Property / summary: The aim of the project is to enhance the educational and educational performance of the institution, to strengthen inclusive education and to improve the quality of educational and educational services in a sustainable manner, and to strengthen equitable public education. The aim is to reduce early school leaving and school leaving without qualifications. In order to achieve the objectives, it is necessary to improve the infrastructural state and equipment of the institution. For this purpose, we submit an application for assistance for development in accordance with the attached technical and technical documents. Need arising: Physical education is one of the main educational and educational areas of the School, but the infrastructural conditions — the poor condition of the essential parts and premises of the building related to this field, as well as the lack of equipment — hinder the achievement and effective fulfilment of educational objectives in this direction. — the “dresser wing” of the previously renewed gym: lobby (yard and market entrance), gym room, ductory, corridor, dressing room, sanitary facilities have not been refurbished before, they are in very poor condition, do not meet the demands of the modern school. Due to the very high occupancy, the furniture of the changing rooms was also severely damaged. — floor defects: the final solution for the infiltration of the flat top of the locker wing would be the proper water and thermal insulation of the roof. — energy problems: the electrical system of the building part is completely damaged and unsafe — Scarcity and absence of adequate public spaces: there is no open-air community space in the schoolyard, while the 237 students of the lower class are in the school home system until 16:00. For them, it would be better to improve the efficiency of education by expanding the scenes of afternoon programmes and leisure activities if a suitable open-air community space was created. Objectives: Overall objective: Ensuring the lack of infrastructure conditions necessary for the quality, chance-creating and equitable educational and educational work of the Ramassetter Vince Primary School of Physical Education in Sümeg. Provide a built environment that supports health promotion, health education and health awareness. Milestone 2: Ensure the availability of tools to support health promotion, health education and health awareness. Activities: ‘in a changing building’: refurbishment of the small gym: replacement of casings, plaster repairs, painting works, installation of protective coverings? renovation of changing rooms, demolition of coverings, re-laying, plaster repairs, paintings and installation of chair protection boards? renovation of washbasin-touching-toilet rooms, replacement of existing wet equipment, shower separators, painting works? replacement of doors and doors in the entrance of the gym and dressing rooms, renovation of the electrical network of sports equipment, plaster replacements, painting works, renovation of roof structure, demolition of existing waterproofing, thermal insulation, new rainwater insulation, tinting. 456 m² electric system renewal in the Ramassetter building: refurbishment of changing-wash-WC premises, demolition, replacement, rendering of plaster, painting works, corridor painting works. in the courtyard: • in the area formed by the demolition of a former carbon pool, the construction of a surface covered with a steel-structured roof covering 50 m² by grassing of the surrounding area: one-sided dressing room bench, 190 cm (23 pcs)? One-sided dressing room bench, 120 cm (2 pcs) Acquisition of physical education and sports equipment, furniture and furniture to ensure the usability of the spaces involved in the infrastructural development 01.11.2017 (grant contract) — 31.10.2018 (physical implementation) Eligible cost: HUF 51 922.701 (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:48, 8 February 2022

Project Q3903451 in Hungary
Language Label Description Also known as
English
Development of the educational and educational infrastructure environment of Ramassetter Vince Primary School of Physical Education
Project Q3903451 in Hungary

    Statements

    0 references
    51,433,701 forint
    0 references
    142,224.98 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    170,031.178 Euro
    0.0027336256 Euro
    14 December 2021
    0 references
    62,199,877.859 forint
    0 references
    82.69129 percent
    0 references
    2 November 2017
    0 references
    31 October 2018
    0 references
    Balatonfüredi Tankerületi Központ
    0 references
    0 references

    46°57'41.33"N, 17°18'33.66"E
    0 references
    A projekt célja az intézmény nevelési-oktatási eredményességének fokozása, az inkluzív oktatás erősítése, valamint a nevelési-oktatási szolgáltatások minőségének fenntartható javítása, a méltányos köznevelés erősítése. Cél a lemorzsolódás, a végzettség nélküli iskolaelhagyás visszaszorítása. A célok elérése érdekében fejleszteni szükséges az intézmény nem megfelelő infrastrukturális állapotát, felszereltségét, ennek érdekében a mellékelt műszaki és szakmai dokumentumok szerinti fejlesztésre nyújtunk be támogatási kérelmet. Felmerült szükséglet: Az Iskola egyik kiemelt oktatási-nevelési területe a testnevelés, azonban az infrastrukturális feltételek – az épület e szakterülethez kapcsolódó lényeges részeinek és helyiségeinek rossz állapota , továbbá az eszközállomány hiányosságai– akadályozzák az ezirányú nevelési célok elérését, hatékony teljesülését. - a korábban megújult tornateremhez tartozó "öltözői szárny": előcsarnok (udvari és piactéri bejárat), tornaszoba, szertár, folyosó, öltöző, vizesblokkok nem kerültek korábban felújításra, nagyon rossz állapotúak, nem felelnek meg a korszerű iskolával szemben támasztott igényeknek. A nagyon nagy kihasználtság miatt az öltözők bútorzata is erősen leamortizálódott. - födémhibák: az öltözői szárny lapostetejének beázásaira végleges megoldását a tető megfelelő víz- és hőszigetelése jelentené. - energetikai problémák: épületrész villamos rendszere teljesen leamortizálódott és nem biztonságos - Megfelelő közösségi terek szűkössége, hiánya: az iskolaudvaron nincs szabadtéri kialakított közösségi tér, miközben az alsó tagozat 237 tanulója iskolaotthonos rendszerben 16 óráig az intézményben tartózkodik. Számukra a nevelés hatékonyságának javítását szolgálná, ha a délutáni programok, szabadidős tevékenységek színterei bővülnének, ha alkalmas szabadtéri közösségi tér kerülne kialakításra. Célok: Átfogó cél: A sümegi Ramassetter Vince Testnevelési Általános Iskola minőségi, esélyteremtő és méltányos oktatási-nevelési szakmai munkájához nélkülözhetetlen, még hiányzó infrastrukturális feltételek biztosítása Részcél 1: Egészségfejlesztést, egészségnevelést, egészségtudatosságot támogató épített környezet biztosítása. Részcél 2: Egészségfejlesztést, egészségnevelést, egészségtudatosságot támogató eszközök rendelkezésre állásának biztosítása. Tevékenységek: "öltözőépületben": ? kistornaterem felújítása: burkolat csere, vakolatjavítás, festési munkák, védőburkolat elhelyezése ? öltöző helyiségek felújítása, burkolatok bontása, újra fektetése, vakolatjavítások, festések, valamint székvédő deszkák elhelyezése ? mosdó-tusoló-WC helyiségek felújítása, meglévő vizes berendezések cseréje, tusoló elválasztók elhelyezése, festési munkák ? tornaterem és öltözők bejárati előtér nyílászáróinak cseréje, ? sportszertár elektromos hálózat felújítása, vakolat pótlások, festési munkák, ? tetőszerkezet felújítása, meglévő vízszigetelés bontása, hőszigetelés, új csapadékvíz elleni szigetelés, bádogozás készítése. 456 m2 ? elektromos rendszer megújítása "Ramassetter épületben":  ? öltöző-mosdó-WC helyiségek felújítása, burkolatok, berendezési tárgyak bontásával, cseréjével, vakolatjavításokkal, festési munkálatokkal,  ? közlekedő folyosó festési munkák. udvaron: • egykori széntároló bontásával kialakult területen 50 m2 burkolt, acélszerkezetű tetővel fedett felület kialakítása a környező területrész füvesítésével eszközbeszerzés: ? egyoldalas öltözői pad, 190 cm (23 db) ? egyoldalas öltözői pad, 120 cm (2 db) Az infrastrukturális fejlesztésben érintett terek használhatóságának biztosításához testnevelési és sport eszközök, berendezési tárgyak és bútorok beszerzése Ütemezés: 2017.11.01 (támogatási szerződékötés) - 2018.10.31. (fizikiai megvalósítás) Elszámolható költség: 51.922.701 Ft (Hungarian)
    0 references
    The aim of the project is to enhance the educational and educational performance of the institution, to strengthen inclusive education and to improve the quality of educational and educational services in a sustainable manner, and to strengthen equitable public education. The aim is to reduce early school leaving and school leaving without qualifications. In order to achieve the objectives, it is necessary to improve the infrastructural state and equipment of the institution. For this purpose, we submit an application for assistance for development in accordance with the attached technical and technical documents. Need arising: Physical education is one of the main educational and educational areas of the School, but the infrastructural conditions — the poor condition of the essential parts and premises of the building related to this field, as well as the lack of equipment — hinder the achievement and effective fulfilment of educational objectives in this direction. — the “dresser wing” of the previously renewed gym: lobby (yard and market entrance), gym room, ductory, corridor, dressing room, sanitary facilities have not been refurbished before, they are in very poor condition, do not meet the demands of the modern school. Due to the very high occupancy, the furniture of the changing rooms was also severely damaged. — floor defects: the final solution for the infiltration of the flat top of the locker wing would be the proper water and thermal insulation of the roof. — energy problems: the electrical system of the building part is completely damaged and unsafe — Scarcity and absence of adequate public spaces: there is no open-air community space in the schoolyard, while the 237 students of the lower class are in the school home system until 16:00. For them, it would be better to improve the efficiency of education by expanding the scenes of afternoon programmes and leisure activities if a suitable open-air community space was created. Objectives: Overall objective: Ensuring the lack of infrastructure conditions necessary for the quality, chance-creating and equitable educational and educational work of the Ramassetter Vince Primary School of Physical Education in Sümeg. Provide a built environment that supports health promotion, health education and health awareness. Milestone 2: Ensure the availability of tools to support health promotion, health education and health awareness. Activities: ‘in a changing building’: refurbishment of the small gym: replacement of casings, plaster repairs, painting works, installation of protective coverings? renovation of changing rooms, demolition of coverings, re-laying, plaster repairs, paintings and installation of chair protection boards? renovation of washbasin-touching-toilet rooms, replacement of existing wet equipment, shower separators, painting works? replacement of doors and doors in the entrance of the gym and dressing rooms, renovation of the electrical network of sports equipment, plaster replacements, painting works, renovation of roof structure, demolition of existing waterproofing, thermal insulation, new rainwater insulation, tinting. 456 m² electric system renewal in the Ramassetter building: refurbishment of changing-wash-WC premises, demolition, replacement, rendering of plaster, painting works, corridor painting works. in the courtyard: • in the area formed by the demolition of a former carbon pool, the construction of a surface covered with a steel-structured roof covering 50 m² by grassing of the surrounding area: one-sided dressing room bench, 190 cm (23 pcs)? One-sided dressing room bench, 120 cm (2 pcs) Acquisition of physical education and sports equipment, furniture and furniture to ensure the usability of the spaces involved in the infrastructural development 01.11.2017 (grant contract) — 31.10.2018 (physical implementation) Eligible cost: HUF 51 922.701 (English)
    8 February 2022
    0 references
    Sümeg, Veszprém
    0 references

    Identifiers

    EFOP-4.1.3-17-2017-00440
    0 references