Infrastructural development of Gyulai Implom József Primary School Areas (Q3903377): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
Selection of a language lab in the institution and general renovation works: Refurbishment of a sanitary block with fixtures, buckle, painting, heating engineering, window shrub 185 m² Dryboard ceiling making 133 m² Window replacement 270*180 windows in plastic design with 3 layers of glass 90 m² Installation of new window 51 m² PVC floor covering replacement Corridor cabinets 71 pcs “Renovation of electric network Mechanical Engineering — Heating modernisation” construction of sports yard (English)
Property / summary: Selection of a language lab in the institution and general renovation works: Refurbishment of a sanitary block with fixtures, buckle, painting, heating engineering, window shrub 185 m² Dryboard ceiling making 133 m² Window replacement 270*180 windows in plastic design with 3 layers of glass 90 m² Installation of new window 51 m² PVC floor covering replacement Corridor cabinets 71 pcs “Renovation of electric network Mechanical Engineering — Heating modernisation” construction of sports yard (English) / rank
 
Normal rank
Property / summary: Selection of a language lab in the institution and general renovation works: Refurbishment of a sanitary block with fixtures, buckle, painting, heating engineering, window shrub 185 m² Dryboard ceiling making 133 m² Window replacement 270*180 windows in plastic design with 3 layers of glass 90 m² Installation of new window 51 m² PVC floor covering replacement Corridor cabinets 71 pcs “Renovation of electric network Mechanical Engineering — Heating modernisation” construction of sports yard (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:47, 8 February 2022

Project Q3903377 in Hungary
Language Label Description Also known as
English
Infrastructural development of Gyulai Implom József Primary School Areas
Project Q3903377 in Hungary

    Statements

    0 references
    0 references
    173,465.86 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    62,731,532 forint
    0 references
    201,746.496 Euro
    0.0027336256 Euro
    14 December 2021
    0 references
    73,801,802.353 forint
    0 references
    84.999984 percent
    0 references
    1 October 2017
    0 references
    1 December 2018
    0 references
    Gyulai Tankerületi Központ
    0 references
    0 references

    46°38'37.93"N, 21°16'29.14"E
    0 references
    Az intézményben nyelvi labor kialkítása, továbbá általános felújítási munkák: Vizesblokk felújítása, berendezési tárgyakkal, bukolat, festés, fűtés gépészettel, ablak cserével 185 m2 Gipszkarton állmennyezet készítés 133 m2 Ablak csere 270*180-as ablakok műanyag kivitelben 3 rétegű üveggel 90 m2 Üvegtégla bontás helyette új ablak beépítése 51 m2 PVC padlóburkolat csere Folyosói szekrények felújítása 71 db "Elektromos hálózat felújítása Gépészet - Fűtés korszerűsítés "Sportudvar kialakítása sporteszközök beszerzése és telepítse (Hungarian)
    0 references
    Selection of a language lab in the institution and general renovation works: Refurbishment of a sanitary block with fixtures, buckle, painting, heating engineering, window shrub 185 m² Dryboard ceiling making 133 m² Window replacement 270*180 windows in plastic design with 3 layers of glass 90 m² Installation of new window 51 m² PVC floor covering replacement Corridor cabinets 71 pcs “Renovation of electric network Mechanical Engineering — Heating modernisation” construction of sports yard (English)
    8 February 2022
    0 references
    Gyula, Békés
    0 references

    Identifiers

    EFOP-4.1.3-17-2017-00408
    0 references