Infrastructure development at Eötvös József Eötvös Elementary School of Csurgó (Q3902830): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
The Eötvös József Eötvös Primary School in Csurgó is divided into 2 wings: the so-called “old” building, consecrated on 8 September 1910 as a Roman Catholic elementary school, and the so-called “new” building, which was handed over in 1977. The building of the institution has undergone only minor refurbishments in 1991, 1997, 2009 and 2015. Replacement of doors and windows, external, interior painting has become necessary today. Today, the school needs to be refurbished and modernised. It is urgent to upgrade the electrical wiring, which are in a very bad condition, stick out of the wall, cause short circuits, and the outlets are not considered safe. In addition, the modernisation and refurbishment of the equipment and flooring of the chemistry/physics room on the ground floor is one of the intended objectives, as they are old, outdated, and do not satisfy the current educational standard. The room’s furnishings are worn out, as they are currently in a state damaged and damaged over the years due to the use of a large number of students, which currently does not fully serve the students’ education. In addition, cleaning up the changing rooms’ sanitary facilities is a priority for maintaining basic hygiene. There are 9 classrooms at the disposal of the pupils, 2 study rooms. In addition, there are a development room and a hall used for acting. The cellar room has a burning furnace for the (former) ceramic class. Physical education classes take place both in the gym and in the jumbo (due to the breakdown of the group of boys and girls). From year to year, the insulation of the flat roof is a recurring problem due to wetting. Although wetting is not yet a problem every day of the year, the building is soaked in during rains, resulting in a deterioration of the quality of the roof structure of the building from time to time, including further high-risk inflows. The soaking of the roof in the classrooms results in damp, humid air, which has a particularly harmful effect on health. CXC 2011 In accordance with the Act on National Public Education, specialisation is provided with retraining and lecturers at school. The specialisation of vocal-music and technology teaching in 7th and 8th grades is unresolved. The staff of the institution is 17 educators. The status of János Arany Eötvös Eötvös Elementary School of the Eötvös József Primary School of Csurgó is filled here by a teacher in the 2015/2016 and 2016/2017 academic years, so 17 teachers and 1 school secretary work at the school. The consolidated institution shall be managed by 1 head of institution and a head of a member institution shall be appointed in the member institution. There are inter-institutional retrainings (working communities, holding meetings, entertaining and visiting hours). Currently, 1 teacher is retraining, according to his status, he is an employee of the Eötvös József Eötvös Primary School of Csurgó. Five teachers from the institution teach to another school. Developer pedagogical work is done by a lecturer at school. The teaching of drawing and visual culture is also provided by a lecturer. In the single institution, one educator performs child and youth welfare responsibilities. With this investment, the institution of the school aims to remedy and solve a problem that has been going on for many years. The aim of the development can therefore be interpreted as providing the right environment for the pupils, which cannot be solved without problems with regard to the institution of the Eötvös József Eötvös Eötvös Primary School of Csurgó. With regard to the replacement of the roof structure, renovation is inevitable for the building, as in the long term, the safety and health of the students can be influenced by a series of intakes and humid air, which may also cause allergies in the pupils. The toilet in the gym cannot be used, which is essential for physical education lessons and for the provision of hygiene equipment. The replacement of the wired network is essential specifically to preserve the safety of students, as there is a risk that anyone may get accidental due to the malfunction of outdated wiring and light switches. The equipment of the physics and chemistry classrooms on the ground floor is worn out, which is no longer suitable for students’ learning environments. PVC flooring is old, which is not a beautiful sight from an aesthetic point of view, and the old PVC materials have much more harmful substances than new products. The maintenance and maintenance costs of the renovations are financed by the Kaposvár School District Centre. (English) | |||||||||||||||
Property / summary: The Eötvös József Eötvös Primary School in Csurgó is divided into 2 wings: the so-called “old” building, consecrated on 8 September 1910 as a Roman Catholic elementary school, and the so-called “new” building, which was handed over in 1977. The building of the institution has undergone only minor refurbishments in 1991, 1997, 2009 and 2015. Replacement of doors and windows, external, interior painting has become necessary today. Today, the school needs to be refurbished and modernised. It is urgent to upgrade the electrical wiring, which are in a very bad condition, stick out of the wall, cause short circuits, and the outlets are not considered safe. In addition, the modernisation and refurbishment of the equipment and flooring of the chemistry/physics room on the ground floor is one of the intended objectives, as they are old, outdated, and do not satisfy the current educational standard. The room’s furnishings are worn out, as they are currently in a state damaged and damaged over the years due to the use of a large number of students, which currently does not fully serve the students’ education. In addition, cleaning up the changing rooms’ sanitary facilities is a priority for maintaining basic hygiene. There are 9 classrooms at the disposal of the pupils, 2 study rooms. In addition, there are a development room and a hall used for acting. The cellar room has a burning furnace for the (former) ceramic class. Physical education classes take place both in the gym and in the jumbo (due to the breakdown of the group of boys and girls). From year to year, the insulation of the flat roof is a recurring problem due to wetting. Although wetting is not yet a problem every day of the year, the building is soaked in during rains, resulting in a deterioration of the quality of the roof structure of the building from time to time, including further high-risk inflows. The soaking of the roof in the classrooms results in damp, humid air, which has a particularly harmful effect on health. CXC 2011 In accordance with the Act on National Public Education, specialisation is provided with retraining and lecturers at school. The specialisation of vocal-music and technology teaching in 7th and 8th grades is unresolved. The staff of the institution is 17 educators. The status of János Arany Eötvös Eötvös Elementary School of the Eötvös József Primary School of Csurgó is filled here by a teacher in the 2015/2016 and 2016/2017 academic years, so 17 teachers and 1 school secretary work at the school. The consolidated institution shall be managed by 1 head of institution and a head of a member institution shall be appointed in the member institution. There are inter-institutional retrainings (working communities, holding meetings, entertaining and visiting hours). Currently, 1 teacher is retraining, according to his status, he is an employee of the Eötvös József Eötvös Primary School of Csurgó. Five teachers from the institution teach to another school. Developer pedagogical work is done by a lecturer at school. The teaching of drawing and visual culture is also provided by a lecturer. In the single institution, one educator performs child and youth welfare responsibilities. With this investment, the institution of the school aims to remedy and solve a problem that has been going on for many years. The aim of the development can therefore be interpreted as providing the right environment for the pupils, which cannot be solved without problems with regard to the institution of the Eötvös József Eötvös Eötvös Primary School of Csurgó. With regard to the replacement of the roof structure, renovation is inevitable for the building, as in the long term, the safety and health of the students can be influenced by a series of intakes and humid air, which may also cause allergies in the pupils. The toilet in the gym cannot be used, which is essential for physical education lessons and for the provision of hygiene equipment. The replacement of the wired network is essential specifically to preserve the safety of students, as there is a risk that anyone may get accidental due to the malfunction of outdated wiring and light switches. The equipment of the physics and chemistry classrooms on the ground floor is worn out, which is no longer suitable for students’ learning environments. PVC flooring is old, which is not a beautiful sight from an aesthetic point of view, and the old PVC materials have much more harmful substances than new products. The maintenance and maintenance costs of the renovations are financed by the Kaposvár School District Centre. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The Eötvös József Eötvös Primary School in Csurgó is divided into 2 wings: the so-called “old” building, consecrated on 8 September 1910 as a Roman Catholic elementary school, and the so-called “new” building, which was handed over in 1977. The building of the institution has undergone only minor refurbishments in 1991, 1997, 2009 and 2015. Replacement of doors and windows, external, interior painting has become necessary today. Today, the school needs to be refurbished and modernised. It is urgent to upgrade the electrical wiring, which are in a very bad condition, stick out of the wall, cause short circuits, and the outlets are not considered safe. In addition, the modernisation and refurbishment of the equipment and flooring of the chemistry/physics room on the ground floor is one of the intended objectives, as they are old, outdated, and do not satisfy the current educational standard. The room’s furnishings are worn out, as they are currently in a state damaged and damaged over the years due to the use of a large number of students, which currently does not fully serve the students’ education. In addition, cleaning up the changing rooms’ sanitary facilities is a priority for maintaining basic hygiene. There are 9 classrooms at the disposal of the pupils, 2 study rooms. In addition, there are a development room and a hall used for acting. The cellar room has a burning furnace for the (former) ceramic class. Physical education classes take place both in the gym and in the jumbo (due to the breakdown of the group of boys and girls). From year to year, the insulation of the flat roof is a recurring problem due to wetting. Although wetting is not yet a problem every day of the year, the building is soaked in during rains, resulting in a deterioration of the quality of the roof structure of the building from time to time, including further high-risk inflows. The soaking of the roof in the classrooms results in damp, humid air, which has a particularly harmful effect on health. CXC 2011 In accordance with the Act on National Public Education, specialisation is provided with retraining and lecturers at school. The specialisation of vocal-music and technology teaching in 7th and 8th grades is unresolved. The staff of the institution is 17 educators. The status of János Arany Eötvös Eötvös Elementary School of the Eötvös József Primary School of Csurgó is filled here by a teacher in the 2015/2016 and 2016/2017 academic years, so 17 teachers and 1 school secretary work at the school. The consolidated institution shall be managed by 1 head of institution and a head of a member institution shall be appointed in the member institution. There are inter-institutional retrainings (working communities, holding meetings, entertaining and visiting hours). Currently, 1 teacher is retraining, according to his status, he is an employee of the Eötvös József Eötvös Primary School of Csurgó. Five teachers from the institution teach to another school. Developer pedagogical work is done by a lecturer at school. The teaching of drawing and visual culture is also provided by a lecturer. In the single institution, one educator performs child and youth welfare responsibilities. With this investment, the institution of the school aims to remedy and solve a problem that has been going on for many years. The aim of the development can therefore be interpreted as providing the right environment for the pupils, which cannot be solved without problems with regard to the institution of the Eötvös József Eötvös Eötvös Primary School of Csurgó. With regard to the replacement of the roof structure, renovation is inevitable for the building, as in the long term, the safety and health of the students can be influenced by a series of intakes and humid air, which may also cause allergies in the pupils. The toilet in the gym cannot be used, which is essential for physical education lessons and for the provision of hygiene equipment. The replacement of the wired network is essential specifically to preserve the safety of students, as there is a risk that anyone may get accidental due to the malfunction of outdated wiring and light switches. The equipment of the physics and chemistry classrooms on the ground floor is worn out, which is no longer suitable for students’ learning environments. PVC flooring is old, which is not a beautiful sight from an aesthetic point of view, and the old PVC materials have much more harmful substances than new products. The maintenance and maintenance costs of the renovations are financed by the Kaposvár School District Centre. (English) / qualifier | |||||||||||||||
point in time: 8 February 2022
|
Revision as of 13:44, 8 February 2022
Project Q3902830 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Infrastructure development at Eötvös József Eötvös Elementary School of Csurgó |
Project Q3902830 in Hungary |
Statements
56,179,759 forint
0 references
180,675.797 Euro
0.0027336256 Euro
14 December 2021
0 references
66,093,834.118 forint
0 references
84.999998 percent
0 references
1 January 2018
0 references
30 November 2018
0 references
Kaposvári Tankerületi Központ
0 references
Q3961531 (Deleted Item)
0 references
A Csurgói Eötvös József Általános Iskola épülete 2 szárnyra tagolódik: az ún. „régi” épületre, (1910. szeptember 8-án szentelték fel római katolikus elemi iskolaként) és az ún. „új” épületre, melyet 1977- ben adtak át. Az intézmény épülete csak kisebb átalakításokon esett át 1991-ben, 1997-ben, 2009-ben és 2015-ben. Nyílászárók cseréje, külső, belső festés vált mára szükségessé. Mára az iskola erősen felújításra, korszerűsítésre szorul. Sürgető az elektromos vezetékek korszerűsítése, melyek kifejezetten rossz állapotban vannak, kilógnak a falból, rövidzárlatot okoznak, a konnektorok sem minősülnek biztonságosnak. Ezen túlmenően a földszinti kémia/fizika szaktanterem berendezésének, padozatának modernizálása, felújítása a tervezett cél között szerepel, mivel azok régiek, korszerűtlenek, nem elégítik ki a jelenlegi oktatási színvonal fenntartását. A terem berendezése elhasználódott, hiszen az évek alatt a rengeteg diák használata miatt megviselt, néhol megrongálódott állapotban vannak jelenleg, ami jelenleg már nem szolgálja ki maximálisan a diákok oktatását. Mindemellett az öltözők vizesblokkjának rendbetétele az alapvető higiénia fenntartásának szempontjából elsődlegesnek minősül. A tanulók rendelkezésére 9 tanterem, 2 szaktanterem áll. Ezen kívül van fejlesztő terem, és egykor színjátszásra használt terem. A pincehelyiségben égető kemence van a (volt) kerámia tanszak számára. A tornateremben és a zsibongóban is folynak testnevelés órák (fiú-lány csoportbontás miatt). Évről évre visszatérő problémát okoz a lapos tető szigetelése a beázások miatt. Bár a beázás jelenleg még nem okoz az év minden napján problémát, de esőzésekkor beázik az épület, melynek hatására az épület tetőszerkezetének minősége időről-időre romlik, ami magában foglalja a további nagyobb kockázatú beázásokat is. A tető beázása az osztálytermek esetében nyirkos, párás levegőt eredményeznek, melynek kifejezetten egészségkárosító hatásai vannak. A 2011. évi CXC. Nemzeti köznevelésről szóló törvénynek megfelelően a szakos ellátottság áttanítással és óraadókkal ellátott az iskolában. Az ének-zene és a technika tanítás szakos ellátása 7. és 8. osztályban viszonyt megoldatlan. Az intézmény személyi állománya 17 pedagógus státusz. A Csurgói Eötvös József Általános Iskola Arany János Általános Iskolájának egy státuszát a 2015/2016-os és a 2016/2017-es tanévben itt tölti be egy pedagógus, így 17 fő pedagógus és 1 fő iskolatitkár dolgozik az iskolában. Az összevont intézményt 1 intézményvezető vezeti, a tagintézményben tagintézmény-vezetőt neveznek ki. Intézmények közötti áttanítások nehezítik a munkát (munkaközösségek munkája, értekezletek megtartása, hospitálások és óralátogatások terén). Jelenleg 1 fő pedagógus végez áttanítást, ő státusz szerint a Csurgói Eötvös József Általános Iskola alkalmazottja. Az intézményből 5 pedagógus tanít át másik iskolába. Fejlesztő pedagógiai munkát végez egy óraadó pedagógus az iskolában. A rajz és vizuális kultúra tantárgy tanítását is óraadó pedagógus látja el. Az egységes intézményben egy pedagógus látja el a gyermek- és ifjúságvédelmi feladatokat. Jelen beruházással már egy sok éve húzódó problémát kíván orvosolni és megoldani az iskola intézménye. A fejlesztés céljaként értelmezhető tehát, a megfelelő környezet biztosítása a tanulók számára, mely a Csurgói Eötvös József Általános Iskola intézményét tekintve jelenleg nem oldható meg problémamentesen. A tetőszerkezet cseréjét tekintve az épület számára elkerülhetetlen a renoválás, ugyanis hosszú távon a diákok biztonságát, illetve egészségét is befolyásolhatja a sorozatos beázás, párás levegő, mely esetlegesen allergiát is kiválthat a tanulóknál. A tornateremben levő öltöző vizesblokkja nem használható, ami elengedhetetlen a testnevelés óra szempontjából és a higiéniai eszközök biztosítása érdekében is. A vezetékes hálózat cseréje kifejezetten a diákok biztonságának megőrzése érdekében nélkülözhetetlen, hiszen fennáll a veszélye annak, hogy bárki balesetet szenvedhet a korszerűtlen vezetékek és a villanykapcsolók rossz működése miatt. A földszinti fizika és kémia tantermek berendezése elhasználódott állapotban van, ami jelenleg már nem szolgálja a diákok megfelelő tanulói környezetét. PVC padlózata régi, mely esztétikai szempontból sem szép látvány, illetve a régi PVC anyagokban sokkal több a káros anyag, mint az új termékekben. A felújítások fenntartási és karbantartási költségeit a Kaposvári Tankerületi Központ finanszírozza. (Hungarian)
0 references
The Eötvös József Eötvös Primary School in Csurgó is divided into 2 wings: the so-called “old” building, consecrated on 8 September 1910 as a Roman Catholic elementary school, and the so-called “new” building, which was handed over in 1977. The building of the institution has undergone only minor refurbishments in 1991, 1997, 2009 and 2015. Replacement of doors and windows, external, interior painting has become necessary today. Today, the school needs to be refurbished and modernised. It is urgent to upgrade the electrical wiring, which are in a very bad condition, stick out of the wall, cause short circuits, and the outlets are not considered safe. In addition, the modernisation and refurbishment of the equipment and flooring of the chemistry/physics room on the ground floor is one of the intended objectives, as they are old, outdated, and do not satisfy the current educational standard. The room’s furnishings are worn out, as they are currently in a state damaged and damaged over the years due to the use of a large number of students, which currently does not fully serve the students’ education. In addition, cleaning up the changing rooms’ sanitary facilities is a priority for maintaining basic hygiene. There are 9 classrooms at the disposal of the pupils, 2 study rooms. In addition, there are a development room and a hall used for acting. The cellar room has a burning furnace for the (former) ceramic class. Physical education classes take place both in the gym and in the jumbo (due to the breakdown of the group of boys and girls). From year to year, the insulation of the flat roof is a recurring problem due to wetting. Although wetting is not yet a problem every day of the year, the building is soaked in during rains, resulting in a deterioration of the quality of the roof structure of the building from time to time, including further high-risk inflows. The soaking of the roof in the classrooms results in damp, humid air, which has a particularly harmful effect on health. CXC 2011 In accordance with the Act on National Public Education, specialisation is provided with retraining and lecturers at school. The specialisation of vocal-music and technology teaching in 7th and 8th grades is unresolved. The staff of the institution is 17 educators. The status of János Arany Eötvös Eötvös Elementary School of the Eötvös József Primary School of Csurgó is filled here by a teacher in the 2015/2016 and 2016/2017 academic years, so 17 teachers and 1 school secretary work at the school. The consolidated institution shall be managed by 1 head of institution and a head of a member institution shall be appointed in the member institution. There are inter-institutional retrainings (working communities, holding meetings, entertaining and visiting hours). Currently, 1 teacher is retraining, according to his status, he is an employee of the Eötvös József Eötvös Primary School of Csurgó. Five teachers from the institution teach to another school. Developer pedagogical work is done by a lecturer at school. The teaching of drawing and visual culture is also provided by a lecturer. In the single institution, one educator performs child and youth welfare responsibilities. With this investment, the institution of the school aims to remedy and solve a problem that has been going on for many years. The aim of the development can therefore be interpreted as providing the right environment for the pupils, which cannot be solved without problems with regard to the institution of the Eötvös József Eötvös Eötvös Primary School of Csurgó. With regard to the replacement of the roof structure, renovation is inevitable for the building, as in the long term, the safety and health of the students can be influenced by a series of intakes and humid air, which may also cause allergies in the pupils. The toilet in the gym cannot be used, which is essential for physical education lessons and for the provision of hygiene equipment. The replacement of the wired network is essential specifically to preserve the safety of students, as there is a risk that anyone may get accidental due to the malfunction of outdated wiring and light switches. The equipment of the physics and chemistry classrooms on the ground floor is worn out, which is no longer suitable for students’ learning environments. PVC flooring is old, which is not a beautiful sight from an aesthetic point of view, and the old PVC materials have much more harmful substances than new products. The maintenance and maintenance costs of the renovations are financed by the Kaposvár School District Centre. (English)
8 February 2022
0 references
Csurgó, Somogy
0 references
Identifiers
EFOP-4.1.3-17-2017-00263
0 references