SCHOOL ON LINEE (Q1869541): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
(Changed an Item: import item from Italy) |
||
Property / location (string) | |||
FABRIANO | |||
Property / location (string): FABRIANO / rank | |||
Normal rank |
Revision as of 19:20, 7 February 2022
Project Q1869541 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | SCHOOL ON LINEE |
Project Q1869541 in Italy |
Statements
18,500.0 Euro
0 references
18,500.0 Euro
0 references
100.0 percent
0 references
9 February 2016
0 references
26 September 2016
0 references
11 November 2016
0 references
FABRIANO "F. IMONDI ROMAGNOLI"
0 references
IL PROGETTO PREVEDE LA CONNESSIONE DI TRE EDIFICI SCOLASTICI CHE OSPITANO COMPLESSIVAMENTE DUE SCUOLE DELLINFANZIA DUE SCUOLE PRIMARIE UNA SCUOLA SECONDARIA DI I GRADO E GLI UFFICI DI PRESIDENZA E SEGRETERIA PLESSO GENTILE DA FABRIANO SCUOLA SECONDARIA GENTILE DA FABRIANO UFFICI DI SEGRETERIA E PRESIDENZA PLESSO ALLEGRETTO DI NUZIO SCUOLA DELLINFANZIA ANNA MALFAIERA E SCUOLA PRIMARIA ALLEGRETTO DI NUZIO PLESSO CARLO COLLODI SCUOLA DELLINFANZIA PLE MILIANI E SCUOLA PRIMARIA CARLO COLLODI (Italian)
0 references
THE PROJECT WILL CONNECT THREE SCHOOL BUILDINGS TOGETHER WITH TWO PRIMARY SCHOOLS DELLINFANZIA, TWO PRIMARY SCHOOLS, A SECONDARY SCHOOL OF THE GRADE, THE BUREAUX AND THE SECRETARIAT, WHICH WILL BE ATTACHED TO IT BY FABRIANO SECONDARY SCHOOL FROM FABRIANO SECONDARY SCHOOL, ATTACHED TO THE NUZIO SCHOOLS DELLINFANZIA ANNA MALFAIERA AND THE PRIMARY SCHOOL ATTACHED TO A NUMBER OF SCHOOLS OF DELLINFAIZIA SCHOOL IN THE MILIANI, AND THE PRIMARY SCHOOL CARLO COLLODI (English)
0 references
LE PROJET PRÉVOIT LA CONNEXION DE TROIS BÂTIMENTS SCOLAIRES QUI ABRITENT UN TOTAL DE DEUX JARDINS D’ENFANTS DEUX ÉCOLES PRIMAIRES, UNE ÉCOLE SECONDAIRE DE NIVEAU SECONDAIRE ET LE BUREAU ET LE SECRÉTARIAT DU PLEXUS DE L’ÉCOLE SECONDAIRE MATERNELLE FABRIANO DES BUREAUX DE SECRÉTARIAT DE FABRIANO ET DU PLEXUS PRÉSIDENCE ALLEGRETTO DE LA MATERNELLE NUZIO MATERNELLE ANNA MALFAIERA ET DE L’ÉCOLE PRIMAIRE ALLEGRETTO DI NUZIO PLESSO CARLO COLLODI PRÉSCOLAIRE PLE MILIANI ET ÉCOLE PRIMAIRE CARLO COLLODI (French)
10 December 2021
0 references
HET PROJECT VOORZIET IN DE VERBINDING VAN DRIE SCHOOLGEBOUWEN WAAR IN TOTAAL TWEE KLEUTERSCHOLEN TWEE BASISSCHOLEN EEN MIDDELBARE SCHOOL VAN DE RANGEN EN HET BUREAU EN HET PLEXUS-SECRETARIAAT VAN FABRIANO SOORT MIDDELBARE SCHOOL VAN FABRIANO SECRETARIËLE BUREAUS EN PLEXUS VOORZITTERSCHAP ALLEGRETTO VAN NUZIO KLEUTERSCHOOL ANNA MALFAIERA EN BASISSCHOOL ALLEGRETTO DI NUZIO PLESSO CARLO COLLODI PRESCHOOL PLE MILIANI EN BASISSCHOOL CARLO COLLODI (Dutch)
22 December 2021
0 references
DAS PROJEKT SIEHT DIE VERBINDUNG VON DREI SCHULGEBÄUDEN VOR, IN DENEN INSGESAMT ZWEI KINDERGÄRTEN ZWEI GRUNDSCHULEN EINE SEKUNDARSCHULE DER NOTEN UND DAS BUREAU UND DAS PLEXIUS-SEKRETARIAT VON FABRIANO ART SEKUNDARSCHULE AUS FABRIANO SEKRETARIATSBÜROS UND PLEXIUS PRÄSIDENTSCHAFT ALLEGRETTO VON NUZIO KINDERGARTEN ANNA MALFAIERA UND GRUNDSCHULE ALLEGRETTO DI NUZIO PLESSO CARLO COLLODI PRESCHOOLPLE MILIANI UND GRUNDSCHULE CARLO COLLODI (German)
23 December 2021
0 references
EL PROYECTO PREVÉ LA CONEXIÓN DE TRES EDIFICIOS ESCOLARES QUE ALBERGAN UN TOTAL DE DOS JARDINES DE INFANCIA DOS ESCUELAS PRIMARIAS UNA ESCUELA SECUNDARIA DE LOS GRADOS Y LA OFICINA Y EL TIPO DE SECRETARÍA DEL PLEXO DE LA ESCUELA SECUNDARIA TIPO FABRIANO DE FABRIANO OFICINAS SECRETARIALES Y PLEXO PRESIDENCIA ALLEGRETTO DE NUZIO KINDERGARTEN ANNA MALFAIERA Y ESCUELA PRIMARIA ALLEGRETTO DI NUZIO PLESSO CARLO COLLODI PREESCOLAR PLE MILIANI Y ESCUELA PRIMARIA CARLO COLLODI (Spanish)
23 January 2022
0 references
FABRIANO
0 references
Identifiers
J96J15000660007
0 references