(A19_093_2016_0930052_1049) AL.IT.E.E. (Q2066482): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
(‎Changed an Item: import item from Italy)
Property / location (string)
 
POGGIBONSI
Property / location (string): POGGIBONSI / rank
 
Normal rank

Revision as of 06:30, 4 February 2022

Project Q2066482 in Italy
Language Label Description Also known as
English
(A19_093_2016_0930052_1049) AL.IT.E.E.
Project Q2066482 in Italy

    Statements

    0 references
    15,600.0 Euro
    0 references
    31,200.0 Euro
    0 references
    50.0 percent
    0 references
    28 July 2016
    0 references
    7 August 2018
    0 references
    28 July 2018
    0 references
    ALBERGO ITALIA DI NARDI RENZO E C. SNC
    0 references
    0 references
    0 references

    43°27'54.11"N, 11°8'54.02"E
    0 references
    L?INTERVENTO PROPOSTO, SI RIFERISCE ALLA COMPLETA SOSTITUZIONE DELLA STRUTTURA DELLA COPERTURA DELL?EDIFICIO, STRUTTURA IN PRECARIO STATO DI MANUTENZIONE. ATTUALMENTE, IL CORPO DI FABBRICA E COPERTO NELLA MAGGIOR PARTE DA UN TETTO CON STRUTTURA IN LEGNO, TAVELLE IN LATERIZIO E MANTO DI TEGOLE MARSIGLIESI, E IN PARTE DA COPERTURA IN ETERNIT POSTA SU STRUTTURA METALLICA DI MODESTA FATTURA. L?INTERVENTO PROPOSTO SARA QUINDI ARTICOLATO NELLA MANIERA SEGUENTE: 1) CANTIERIZZAZIONE DEL LUOGO DELL?INTERVENTO, CON MONTAGGIO DEL PONTEGGIO ESTERNO, SERVIZI IGIENICI, BARACCHE, GRU A TORRE 2) SMONTAGGIO DELL?ATTUALE STRUTTURA DI COPERTURA, CON CONFERIMENTO A DISCARICA DEI MATERIALI DI RESULTA 3) SMALTIMENTO DI LASTRE DI COPERTURA IN CEMENTO-AMIANTO (ETERNIT), COMPRENSIVO DELLA REDAZIONE DEL PIANO DI LAVORO ALLA ASL COMPETENTE PER ZONA, CON CONFERIMENTO A DISCARICA AUTORIZZATA 4) FORNITURA E POSA IN OPERA DI STRUTTURA METALLICA PORTANTE , OPPORTUNAMENTE FISSATA ALLA MURATURA ESISTENTE 5) FORNITURA E (Italian)
    0 references
    THE PROPOSED INTERVENTION, REFERS TO THE COMPLETE REPLACEMENT OF THE STRUCTURE OF COVER FOR THE BUILDING, WHICH IS IN A PRECARIOUS STATE OF MAINTENANCE. AT PRESENT, THE FACTORY AND COVERED MOST BY A WOODEN STRUCTURE, TAVELLE IN BRICK ROOF AND TILES OF MARSILIESI ROOFING TILES, AND PARTLY BY COVER IN ETERNIT COVER PLACED ON A SMALL METAL INVOICE. THE PROPOSED INTERVENTION WILL THEREFORE BE ARTICULATED IN THE FOLLOWING WAY: (1) CONSTRUCTION OF THE SITE OF THE OPERATION, WITH ASSEMBLY OF THE OUTER SCAFFOLDING, SANITARY FACILITIES, SHAKERS, TOWER CRANES, 2) DISMANTLING OF THE CURRENT COVER STRUCTURE, WITH THE TRANSFER TO LANDFILL OF THE REFERENCE MATERIALS OF 3) DISPOSAL OF COVER SHEETS IN CEMENT ASBESTOS (ETERNIT), INCLUDING THE DRAWING UP OF THE WORK PLAN FOR THE ASL RESPONSIBLE FOR THE AREA, WITH AUTHORISED LANDFILL 4) TO SUPPLY AND LAY DOWN THE METAL FRAME, APPROPRIATELY FIXED TO EXISTING MASONRY 5), AND (English)
    0 references
    L’INTERVENTION PROPOSÉE PORTE SUR LE REMPLACEMENT COMPLET DE LA STRUCTURE DU TOIT DU BÂTIMENT, QUI EST DANS UN ÉTAT D’ENTRETIEN PRÉCAIRE. ACTUELLEMENT, LE CORPS DE L’USINE EST RECOUVERT DANS LA PLUPART D’UN TOIT AVEC UNE STRUCTURE EN BOIS, DES TAVELURES DE BRIQUES ET DES TUILES DE TOITURE MARSIGLIESE, ET EN PARTIE PAR UN REVÊTEMENT ETERNIT PLACÉ SUR UNE PETITE STRUCTURE MÉTALLIQUE. L’INTERVENTION PROPOSÉE SERA DONC STRUCTURÉE COMME SUIT: 1) LA CONSTRUCTION DU SITE DE L’OPÉRATION, AVEC L’ASSEMBLAGE DES ÉCHAFAUDAGES EXTÉRIEURS, DES TOILETTES, DES CASERNES, DES GRUES À TOUR 2) LE DÉMONTAGE DE LA STRUCTURE DE TOITURE ACTUELLE, AVEC LE TRANSFERT À LA DÉCHARGE DES MATÉRIAUX RÉSULTANTS 3) L’ÉLIMINATION DES TOITURES EN BÉTON-AMIANTE (ETERNIT), Y COMPRIS L’ÉLABORATION DU PLAN DE TRAVAIL À L’ASL COMPÉTENT POUR LA ZONE, AVEC TRANSFERT À LA DÉCHARGE AUTORISÉE 4) LA FOURNITURE ET L’INSTALLATION D’UNE STRUCTURE MÉTALLIQUE DE SUPPORT, FIXÉE DE MANIÈRE APPROPRIÉE À LA MAÇONNERIE EXISTANTE 5) ET (French)
    16 December 2021
    0 references
    DE VOORGESTELDE MAATREGEL HEEFT BETREKKING OP DE VOLLEDIGE VERVANGING VAN DE STRUCTUUR VAN HET DAK VAN HET GEBOUW, DAT ZICH IN EEN PRECAIRE STAAT VAN ONDERHOUD BEVINDT. MOMENTEEL IS HET FABRIEKSLICHAAM BEDEKT IN DE MEESTE DOOR EEN DAK MET HOUTEN STRUCTUUR, BAKSTENEN TAVELS EN MARSIGLIESE DAKPANNEN, EN DEELS DOOR ETERNIT BEKLEDING GEPLAATST OP EEN KLEINE METALEN STRUCTUUR. DE VOORGESTELDE INTERVENTIE ZAL DAAROM ALS VOLGT WORDEN GESTRUCTUREERD: 1) DE BOUW VAN DE PLAATS VAN DE EXPLOITATIE, MET DE MONTAGE VAN DE EXTERNE STEIGERS, TOILETTEN, KAZERNES, TORENKRANEN 2) DEMONTAGE VAN DE HUIDIGE DAKCONSTRUCTIE, MET DE OVERBRENGING NAAR HET STORTEN VAN DE RESULTERENDE MATERIALEN 3) VERWIJDERING VAN BETON-ASBEST DAKPLATEN (ETERNIT), MET INBEGRIP VAN HET OPSTELLEN VAN HET WERKPLAN AAN DE VOOR HET GEBIED BEVOEGDE ASL, MET OVERDRACHT NAAR TOEGELATEN STORTPLAATS 4) LEVERING EN INSTALLATIE VAN EEN ONDERSTEUNENDE METALEN CONSTRUCTIE, DIE OP PASSENDE WIJZE IS BEVESTIGD AAN DE BESTAANDE METSELWERK 5) EN (Dutch)
    23 December 2021
    0 references
    DIE VORGESCHLAGENE MASSNAHME BEZIEHT SICH AUF DIE VOLLSTÄNDIGE ERSETZUNG DES DACHES DES GEBÄUDES, DAS SICH IN EINEM PREKÄREN INSTANDHALTUNGSZUSTAND BEFINDET. DERZEIT IST DER FABRIKKÖRPER IN DEN MEISTEN VON EINEM DACH MIT HOLZSTRUKTUR, ZIEGELTAVELS UND MARSIGLIESE DACHZIEGEL BEDECKT, UND TEILWEISE VON ETERNIT ABDECKUNG AUF EINER KLEINEN METALLSTRUKTUR PLATZIERT. DIE VORGESCHLAGENE MASSNAHME WIRD DAHER WIE FOLGT STRUKTURIERT: 1) BAU DER BAUSTELLE, MIT DER MONTAGE DER AUSSENGERÜSTE, TOILETTEN, KASERNEN, TURMKRANE 2) DEMONTAGE DER AKTUELLEN DACHKONSTRUKTION, MIT DER ÜBERTRAGUNG AUF DEPONIEN DER RESULTIERENDEN MATERIALIEN 3) ENTSORGUNG VON BETON-ASBEST-DACHBLECHEN (ETERNIT), EINSCHLIESSLICH DER AUSARBEITUNG DES ARBEITSPLANS AN DIE FÜR DAS GEBIET ZUSTÄNDIGE ASL, MIT ÜBERTRAGUNG AUF DIE GENEHMIGTE DEPONIE 4) LIEFERUNG UND INSTALLATION EINER TRAGENDEN METALLKONSTRUKTION, DIE AUF DAS BESTEHENDE MAUERWERK 5) ANGEMESSEN BEFESTIGT IST, UND (German)
    24 December 2021
    0 references
    LA INTERVENCIÓN PROPUESTA SE REFIERE A LA SUSTITUCIÓN COMPLETA DE LA ESTRUCTURA DEL TECHO DEL EDIFICIO, QUE SE ENCUENTRA EN UN ESTADO DE MANTENIMIENTO PRECARIO. ACTUALMENTE, EL CUERPO DE LA FÁBRICA ESTÁ CUBIERTO EN LA MAYORÍA DE LOS CASOS POR UN TECHO CON ESTRUCTURA DE MADERA, TAVELS DE LADRILLO Y TEJAS MARSIGLIESAS, Y EN PARTE POR EL REVESTIMIENTO ETERNIT COLOCADO SOBRE UNA PEQUEÑA ESTRUCTURA METÁLICA. POR CONSIGUIENTE, LA INTERVENCIÓN PROPUESTA SE ESTRUCTURARÁ DE LA SIGUIENTE MANERA: 1) CONSTRUCCIÓN DEL EMPLAZAMIENTO DE LA OPERACIÓN, CON EL MONTAJE DE LOS ANDAMIOS EXTERNOS, INODOROS, BARRACAS, GRÚAS DE TORRE 2) DESMONTAJE DE LA ESTRUCTURA DE TECHO ACTUAL, CON LA TRANSFERENCIA AL VERTEDERO DE LOS MATERIALES RESULTANTES 3) ELIMINACIÓN DE LÁMINAS PARA TECHOS HORMIGÓN-ASBESTO (ETERNIT), INCLUIDA LA REDACCIÓN DEL PLAN DE TRABAJO A LA ASL COMPETENTE PARA LA ZONA, CON TRANSFERENCIA AL VERTEDERO AUTORIZADO 4) SUMINISTRO E INSTALACIÓN DE UNA ESTRUCTURA METÁLICA DE APOYO, ADECUADAMENTE FIJADA A LA MAMPOSTERÍA EXISTENTE 5) Y (Spanish)
    25 January 2022
    0 references
    POGGIBONSI
    0 references

    Identifiers