TO BE LINKED AT ALL TIMES (Q1874359): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Education - IT - ESF/ERDF / rank | |||
Normal rank |
Revision as of 02:44, 21 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | TO BE LINKED AT ALL TIMES |
Project in Italy financed by DG Regio |
Statements
7,500.0 Euro
0 references
7,500.0 Euro
0 references
100.0 percent
0 references
26 January 2016
0 references
14 December 2016
0 references
14 December 2016
0 references
" ATERNO - MANTHONE' "
0 references
IL PROGETTO PREVEDE LA REALIZZAZIONE DI 1 CABLAGGIO IN CAT 6 COMPLETO DI RACK 19 POLLICI E 20 POSTAZIONI NEL LABORATORIO GEOMETRI DEL SECONDO PIANO DELLA PALAZZINA VICE PRESIDENZA 2 NUOVE DORSALI GIGABIT DAL CENTRO STELLA ESISTENTE VERSO I 6 LABORATORI DEL 2 PIANO VERSO IL LABORATORIO DEL 1 PIANO ED AL PIANO TERRA IN AULA MAGNA E LABORATORIO DI SOSTEGNO 3 NUOVE DORSALI NELLEDIFICIO PRESIDENZA DAL CENTRO STELLA DEL PIANO TERRA VERSO LAULA MAGNA ED IL RACK DEL SECONDO PIANO 4 DORSALE DAL RACK 2 PIANO ALLAULA 5 REALIZZAZIONE DEL CABLAGGIO STRUTTURATO APPARATI PASSIVI IL DIMENSIONAMENTO DEL PROGETTO E LE CARATTERISTICHE DELLA SOLUZIONE SARANNO TALI DA ASSICURARE UNA ELEVATA SCALABILIT E FLESSIBILIT CHE TENGA CONTO DELLEVOLUZIONE PRESUNTA SUL CARICO DI LAVORO DELLAMMINISTRAZIONE NELLA FASE DI PROGETTAZIONE SI TENUTO CONTO DELLE POSSIBILI OTTIMIZZAZIONI IN TERMINI DI EFFICIENZA E DI RISPARMIO ENERGETICO DELLA RETE LOCALE E DELLE INFRASTRUTTURE COLLEGATE O FORNITURA DI MATERIALI ED ATTREZZAG (Italian)
0 references
Identifiers
G26J16000040007
0 references