Design and reconstruction of heat supply networks Gardino str. — Dainai str. — Architektų g. — Gegužiai str., Šiauliai (hereinafter — Project) (Q3778415): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: import item from Lithuania)
(‎Changed an Item: Adding English translations)
Property / summary
 
Taking into account the high prices of fuel and other resources used for the production of thermal energy, significant heat transfer losses in district heating networks managed by AB Å iauliÅ3iÅ3 Energija and the lack of energy transmission and distribution efficiency, AB Å iauliø Energija decided to initiate a project for the reconstruction of the heating supply network of Šiauliai city Pietinis boiler house Grodno g. — Dainai str. — Architektų g. — Gegužiai str., Šiauliai, which is managed by AB “Šiauliai Energija”. The project, which is scheduled for 2016-2019, provides for the installation, instead of 6 189.67 m DN70-500 mm diameter of old, underground, impassable ducts, of new heat supply networks with a total length of 5 427.16 m DN50-500 mm diameterless, optimised diameter and laying trajectory, industrially insulated heat supply networks with fault monitoring system. On the modernised tracks, heat transfer losses will be reduced by 2 412.17 MWh: from 4 779.86 MWh to 2 367.69 MWh/year, i.e. 50.47 %. Reduced fuel consumption will reduce greenhouse gas emissions (an estimated annual reduction in greenhouse gas emissions of 66.19 tCO2ek). The reconstructed routes will provide more reliable heat and the quality of heat supply will improve 14 225 connected customers. (English)
Property / summary: Taking into account the high prices of fuel and other resources used for the production of thermal energy, significant heat transfer losses in district heating networks managed by AB Å iauliÅ3iÅ3 Energija and the lack of energy transmission and distribution efficiency, AB Å iauliø Energija decided to initiate a project for the reconstruction of the heating supply network of Šiauliai city Pietinis boiler house Grodno g. — Dainai str. — Architektų g. — Gegužiai str., Šiauliai, which is managed by AB “Šiauliai Energija”. The project, which is scheduled for 2016-2019, provides for the installation, instead of 6 189.67 m DN70-500 mm diameter of old, underground, impassable ducts, of new heat supply networks with a total length of 5 427.16 m DN50-500 mm diameterless, optimised diameter and laying trajectory, industrially insulated heat supply networks with fault monitoring system. On the modernised tracks, heat transfer losses will be reduced by 2 412.17 MWh: from 4 779.86 MWh to 2 367.69 MWh/year, i.e. 50.47 %. Reduced fuel consumption will reduce greenhouse gas emissions (an estimated annual reduction in greenhouse gas emissions of 66.19 tCO2ek). The reconstructed routes will provide more reliable heat and the quality of heat supply will improve 14 225 connected customers. (English) / rank
 
Normal rank
Property / summary: Taking into account the high prices of fuel and other resources used for the production of thermal energy, significant heat transfer losses in district heating networks managed by AB Å iauliÅ3iÅ3 Energija and the lack of energy transmission and distribution efficiency, AB Å iauliø Energija decided to initiate a project for the reconstruction of the heating supply network of Šiauliai city Pietinis boiler house Grodno g. — Dainai str. — Architektų g. — Gegužiai str., Šiauliai, which is managed by AB “Šiauliai Energija”. The project, which is scheduled for 2016-2019, provides for the installation, instead of 6 189.67 m DN70-500 mm diameter of old, underground, impassable ducts, of new heat supply networks with a total length of 5 427.16 m DN50-500 mm diameterless, optimised diameter and laying trajectory, industrially insulated heat supply networks with fault monitoring system. On the modernised tracks, heat transfer losses will be reduced by 2 412.17 MWh: from 4 779.86 MWh to 2 367.69 MWh/year, i.e. 50.47 %. Reduced fuel consumption will reduce greenhouse gas emissions (an estimated annual reduction in greenhouse gas emissions of 66.19 tCO2ek). The reconstructed routes will provide more reliable heat and the quality of heat supply will improve 14 225 connected customers. (English) / qualifier
 
point in time: 1 February 2022
Timestamp+2022-02-01T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:59, 1 February 2022

Project Q3778415 in Lithuania
Language Label Description Also known as
English
Design and reconstruction of heat supply networks Gardino str. — Dainai str. — Architektų g. — Gegužiai str., Šiauliai (hereinafter — Project)
Project Q3778415 in Lithuania

    Statements

    0 references
    725,000.0 Euro
    0 references
    1,450,000.0 Euro
    0 references
    50.0 percent
    0 references
    2 June 2014
    0 references
    26 April 2019
    0 references
    Akcinė bendrovė "Šiaulių energija"
    0 references
    0 references
    78502
    0 references
    AB „Šiaulių energija”, atsižvelgdama į aukštas kuro ir kitų resursų, naudojamų šilumos energijos gamybai, kainas, didelius šilumos perdavimo nuostolius AB „Šiaulių energija” valdomuose centralizuoto šilumos tiekimo tinkluose ir nepakankamą energijos perdavimo ir paskirstymo efektyvumą, nusprendė inicijuoti AB „Šiaulių energija“ valdomo Šiaulių miesto Pietinės katilinės šilumos tiekimo tinklo Gardino g. – Dainų g. – Architektų g. – Gegužių g., Šiauliuose, rekonstrukcijos projektą. Projekte, kurio vykdymas numatytas 2016–2019 m., numatoma vietoje 6189,67 m DN70–500 mm skersmens senų, požeminiuose, nepraeinamuose kanaluose paklotų šilumos tiekimo tinklų sumontuoti naujus iš viso 5 427,16 m ilgio DN50–500 mm skersmens bekanalinius, optimizuoto diametro ir klojimo trajektorijos, pramoniniu būdu izoliuotus šilumos tiekimo tinklus su gedimų monitoringo sistema. Modernizuojamose trasose šilumos perdavimo nuostoliai sumažės 2 412,17 MWh: nuo 4 779,86 MWh iki 2 367,69 MWh per metus, t. y. 50,47 proc. Dėl mažesnio kuro suvartojimo sumažės išmetamas šiltnamio efektą sukeliančių dujų kiekis (planuojamas metinis išmetamų šiltnamio efektą sukeliančių dujų kiekio sumažėjimas 66,19 tCO2ek). Rekonstruotomis trasomis šiluma bus tiekiama patikimiau ir šilumos tiekimo kokybė pagerės 14 225 prijungtiems vartotojams. (Lithuanian)
    0 references
    Taking into account the high prices of fuel and other resources used for the production of thermal energy, significant heat transfer losses in district heating networks managed by AB Å iauliÅ3iÅ3 Energija and the lack of energy transmission and distribution efficiency, AB Å iauliø Energija decided to initiate a project for the reconstruction of the heating supply network of Šiauliai city Pietinis boiler house Grodno g. — Dainai str. — Architektų g. — Gegužiai str., Šiauliai, which is managed by AB “Šiauliai Energija”. The project, which is scheduled for 2016-2019, provides for the installation, instead of 6 189.67 m DN70-500 mm diameter of old, underground, impassable ducts, of new heat supply networks with a total length of 5 427.16 m DN50-500 mm diameterless, optimised diameter and laying trajectory, industrially insulated heat supply networks with fault monitoring system. On the modernised tracks, heat transfer losses will be reduced by 2 412.17 MWh: from 4 779.86 MWh to 2 367.69 MWh/year, i.e. 50.47 %. Reduced fuel consumption will reduce greenhouse gas emissions (an estimated annual reduction in greenhouse gas emissions of 66.19 tCO2ek). The reconstructed routes will provide more reliable heat and the quality of heat supply will improve 14 225 connected customers. (English)
    1 February 2022
    0 references
    Pramonės g. 10, Šiauliai