PROJECT TO RESTORE THE SHORES OF THE RIVER RIVER FONTANA — WEAPONS — COMPLETION (Q4112813): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
||||||||||||||
label / es | label / es | ||||||||||||||
PROYECTO PARA RESTAURAR LAS ORILLAS DEL RÍO FONTANA — ARMAS — FINALIZACIÓN | |||||||||||||||
Property / summary | |||||||||||||||
PROYECTO PARA RESTAURAR LAS DEFENSAS COSTERAS DEL RÍO FONTANA — ARMAS — FINALIZACIÓN*C.DA FONTANA — ARMAS* SISTEMA HIDRÁULICO DE LAS ARMAS DEL ARROYO DEL VALLE CON LA REORGANIZACIÓN DE UN NUEVO PERFIL DE EQUILIBRIO HIDRÁULICO Y LA DEFENSA DE LA COSTA, A TRAVÉS DE OBRAS DE INGENIERÍA NATURAL (Spanish) | |||||||||||||||
Property / summary: PROYECTO PARA RESTAURAR LAS DEFENSAS COSTERAS DEL RÍO FONTANA — ARMAS — FINALIZACIÓN*C.DA FONTANA — ARMAS* SISTEMA HIDRÁULICO DE LAS ARMAS DEL ARROYO DEL VALLE CON LA REORGANIZACIÓN DE UN NUEVO PERFIL DE EQUILIBRIO HIDRÁULICO Y LA DEFENSA DE LA COSTA, A TRAVÉS DE OBRAS DE INGENIERÍA NATURAL (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PROYECTO PARA RESTAURAR LAS DEFENSAS COSTERAS DEL RÍO FONTANA — ARMAS — FINALIZACIÓN*C.DA FONTANA — ARMAS* SISTEMA HIDRÁULICO DE LAS ARMAS DEL ARROYO DEL VALLE CON LA REORGANIZACIÓN DE UN NUEVO PERFIL DE EQUILIBRIO HIDRÁULICO Y LA DEFENSA DE LA COSTA, A TRAVÉS DE OBRAS DE INGENIERÍA NATURAL (Spanish) / qualifier | |||||||||||||||
point in time: 30 January 2022
|
Revision as of 09:03, 30 January 2022
Project Q4112813 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | PROJECT TO RESTORE THE SHORES OF THE RIVER RIVER FONTANA — WEAPONS — COMPLETION |
Project Q4112813 in Italy |
Statements
3,600,000.0 Euro
0 references
4,500,000.0 Euro
0 references
80.0 percent
0 references
COMUNE DI FIUMEDINISI
0 references
PROGETTO DI RIPRISTINO DELLE DIFESE SPONDALI DEL TORRENTE FIUMEDINISI CONTRADA FONTANA- ARMI - COMPLETAMENTO*C.DA FONTANA - ARMI*SISTEMAZIONE IDRAULICA DEL TORRENTE VALLONE ARMI CON LA RIMODULAZIONE DI UN NUOVO PROFILO DI EQUILIBRIO IDRAULICO E LA DIFESA SPONDALE, MEDIANTE OPERE DI INGEGNERIA NATURALISTICA (Italian)
0 references
PROJECT TO RESTORE THE SHORE DEFENCES OF THE RIVER RIVER FONTANA — WEAPONS — COMPLETION*C.DA FONTANA — WEAPONS*HYDRAULIC SYSTEM OF THE VALLEY STREAM WEAPONS WITH THE REORGANISATION OF A NEW HYDRAULIC BALANCE PROFILE AND THE SHORE DEFENSE, THROUGH NATURAL ENGINEERING WORKS (English)
28 January 2022
0 references
PROJET VISANT À RESTAURER LES DÉFENSES RIVERAINES DE LA RIVIÈRE FONTANA — ARMES — ACHÈVEMENT*C.DA FONTANA — ARMES*SYSTÈME HYDRAULIQUE DES ARMES DU COURS D’EAU DE LA VALLÉE AVEC LA RÉORGANISATION D’UN NOUVEAU PROFIL D’ÉQUILIBRE HYDRAULIQUE ET LA DÉFENSE CÔTIÈRE, GRÂCE À DES TRAVAUX D’INGÉNIERIE NATURELLE (French)
28 January 2022
0 references
PROJEKT ZUR WIEDERHERSTELLUNG DER UFERABWEHR DES FLUSSES FONTANA – WAFFEN – FERTIGSTELLUNG*C.DA FONTANA – WAFFEN*HYDRAULISCHES SYSTEM DER TALSTROMWAFFEN MIT DER REORGANISATION EINES NEUEN HYDRAULISCHEN GLEICHGEWICHTSPROFILS UND DER KÜSTENVERTEIDIGUNG, DURCH NATURTECHNISCHE ARBEITEN (German)
28 January 2022
0 references
PROJECT VOOR HET HERSTEL VAN DE VERDEDIGING VAN DE OEVER VAN DE RIVIER DE FONTANA — WAPENS — VOLTOOIING*C.DA FONTANA — WAPENS*HYDRAULISCH SYSTEEM VAN DE DALSTROOM WAPENS MET DE REORGANISATIE VAN EEN NIEUW HYDRAULISCH EVENWICHT PROFIEL EN DE VERDEDIGING VAN DE KUST, DOOR MIDDEL VAN NATUURTECHNISCHE WERKEN (Dutch)
29 January 2022
0 references
PROYECTO PARA RESTAURAR LAS DEFENSAS COSTERAS DEL RÍO FONTANA — ARMAS — FINALIZACIÓN*C.DA FONTANA — ARMAS* SISTEMA HIDRÁULICO DE LAS ARMAS DEL ARROYO DEL VALLE CON LA REORGANIZACIÓN DE UN NUEVO PERFIL DE EQUILIBRIO HIDRÁULICO Y LA DEFENSA DE LA COSTA, A TRAVÉS DE OBRAS DE INGENIERÍA NATURAL (Spanish)
30 January 2022
0 references
FIUMEDINISI
0 references