INTERMODAL PASSENGER CENTRE OF NUORO (Q4109489): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en, and other parts: Adding English translations) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
CENTRE INTERMODAL DE PASSAGERS DE NUORO | |||||||||||||||
Property / summary | |||||||||||||||
CETTE ACTION COMPLÈTE LE CENTRE INTERMODAL DE PASSAGERS DE NUORO, RÉALISÉ ET EN COURS D’ACHÈVEMENT ET D’ESSAI, À TRAVERS LE DEUXIÈME LOT D’UNE INTERVENTION UNIQUE VISANT À RÉAMÉNAGER L’ENSEMBLE DE LA ZONE. ALORS QUE LE PREMIER LOT A PROCÉDÉ À LA RÉNOVATION DU BÂTIMENT, DE LA PLACE COUVERTE INTÉRIEURE ET DU PARKING À PLUSIEURS ÉTAGES, LE DEUXIÈME LOT FINANCÉ PAR L’ACTION RECONFIGURE LES LIAISONS ROUTIÈRES (RAMPES D’ACCÈS, TABLIER), LE NOUVEAU BÂTIMENT DE PASSAGERS ET LES ÉLÉMENTS SUPPLÉMENTAIRES DU PARC AUTOMOBILE À PLUSIEURS ÉTAGES, NONCHÊ AUTRES BÂTIMENTS DE SERVICE (TELS QUE LA SALLE DE STOCKAGE) ET DES SYSTÈMES (VENTILATION, PHOTOVOLTAÏQUE SOLAIRE ET THERMIQUE). (French) | |||||||||||||||
Property / summary: CETTE ACTION COMPLÈTE LE CENTRE INTERMODAL DE PASSAGERS DE NUORO, RÉALISÉ ET EN COURS D’ACHÈVEMENT ET D’ESSAI, À TRAVERS LE DEUXIÈME LOT D’UNE INTERVENTION UNIQUE VISANT À RÉAMÉNAGER L’ENSEMBLE DE LA ZONE. ALORS QUE LE PREMIER LOT A PROCÉDÉ À LA RÉNOVATION DU BÂTIMENT, DE LA PLACE COUVERTE INTÉRIEURE ET DU PARKING À PLUSIEURS ÉTAGES, LE DEUXIÈME LOT FINANCÉ PAR L’ACTION RECONFIGURE LES LIAISONS ROUTIÈRES (RAMPES D’ACCÈS, TABLIER), LE NOUVEAU BÂTIMENT DE PASSAGERS ET LES ÉLÉMENTS SUPPLÉMENTAIRES DU PARC AUTOMOBILE À PLUSIEURS ÉTAGES, NONCHÊ AUTRES BÂTIMENTS DE SERVICE (TELS QUE LA SALLE DE STOCKAGE) ET DES SYSTÈMES (VENTILATION, PHOTOVOLTAÏQUE SOLAIRE ET THERMIQUE). (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: CETTE ACTION COMPLÈTE LE CENTRE INTERMODAL DE PASSAGERS DE NUORO, RÉALISÉ ET EN COURS D’ACHÈVEMENT ET D’ESSAI, À TRAVERS LE DEUXIÈME LOT D’UNE INTERVENTION UNIQUE VISANT À RÉAMÉNAGER L’ENSEMBLE DE LA ZONE. ALORS QUE LE PREMIER LOT A PROCÉDÉ À LA RÉNOVATION DU BÂTIMENT, DE LA PLACE COUVERTE INTÉRIEURE ET DU PARKING À PLUSIEURS ÉTAGES, LE DEUXIÈME LOT FINANCÉ PAR L’ACTION RECONFIGURE LES LIAISONS ROUTIÈRES (RAMPES D’ACCÈS, TABLIER), LE NOUVEAU BÂTIMENT DE PASSAGERS ET LES ÉLÉMENTS SUPPLÉMENTAIRES DU PARC AUTOMOBILE À PLUSIEURS ÉTAGES, NONCHÊ AUTRES BÂTIMENTS DE SERVICE (TELS QUE LA SALLE DE STOCKAGE) ET DES SYSTÈMES (VENTILATION, PHOTOVOLTAÏQUE SOLAIRE ET THERMIQUE). (French) / qualifier | |||||||||||||||
point in time: 28 January 2022
|
Revision as of 15:07, 28 January 2022
Project Q4109489 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | INTERMODAL PASSENGER CENTRE OF NUORO |
Project Q4109489 in Italy |
Statements
2,000,000.0 Euro
0 references
4,000,000.0 Euro
0 references
50.0 percent
0 references
COMUNE DI NUORO
0 references
CON QUESTA AZIONE SI COMPLETA IL CENTRO INTERMODALE PASSEGGERI DI NUORO, REALIZZATO E IN FASE DI ULTIMAZIONE E COLLAUDO, TRAMITE IL SECONDO LOTTO DI UN UNICO INTERVENTO VOLTO ALLA RIQUALIFICAZIONE DELL'INTERA AREA. MENTRE IL PRIMO LOTTO HA REALIZZATO LA RISTRUTTURAZIONE DEL FABBRICATO, LA PIAZZA COPERTA INTERNA E IL PARCHEGGIO MULTIPIANO, TRAMITE IL SECONDO LOTTO FINANZIATO DALL'AZIONE SI RICONFIGURANO I COLLEGAMENTI STRADALI (RAMPE DI ACCESSO, PIAZZALE), SI REALIZZA IL NUOVO FABBRICATO PASSEGGERI E ULTERIORI COMPONENTI DEL PARCHEGGIO MULTIPIANO, NONCHÊ ALTRI FABBRICATI DI SERVIZIO (COME IL LOCALE DEPOSITO) E IMPIANTI (DI VENTILAZIONE, SOLARE FOTOVOLTAICO E TERMICO). (Italian)
0 references
THIS ACTION COMPLETES THE INTERMODAL PASSENGER CENTRE OF NUORO, REALISED AND UNDER COMPLETION AND TESTING, THROUGH THE SECOND BATCH OF A SINGLE INTERVENTION AIMED AT THE REDEVELOPMENT OF THE ENTIRE AREA. WHILE THE FIRST LOT HAS CARRIED OUT THE RENOVATION OF THE BUILDING, THE INDOOR COVERED SQUARE AND THE MULTI-STOREY PARKING LOT, THE SECOND LOT FINANCED BY THE ACTION RECONFIGURES THE ROAD CONNECTIONS (ACCESS RAMPS, APRON), THE NEW PASSENGER BUILDING AND ADDITIONAL COMPONENTS OF THE MULTI-STOREY CAR PARK, NONCHÊ OTHER SERVICE BUILDINGS (SUCH AS THE STORAGE ROOM) AND SYSTEMS (VENTILATION, SOLAR PHOTOVOLTAIC AND THERMAL). (English)
27 January 2022
0 references
CETTE ACTION COMPLÈTE LE CENTRE INTERMODAL DE PASSAGERS DE NUORO, RÉALISÉ ET EN COURS D’ACHÈVEMENT ET D’ESSAI, À TRAVERS LE DEUXIÈME LOT D’UNE INTERVENTION UNIQUE VISANT À RÉAMÉNAGER L’ENSEMBLE DE LA ZONE. ALORS QUE LE PREMIER LOT A PROCÉDÉ À LA RÉNOVATION DU BÂTIMENT, DE LA PLACE COUVERTE INTÉRIEURE ET DU PARKING À PLUSIEURS ÉTAGES, LE DEUXIÈME LOT FINANCÉ PAR L’ACTION RECONFIGURE LES LIAISONS ROUTIÈRES (RAMPES D’ACCÈS, TABLIER), LE NOUVEAU BÂTIMENT DE PASSAGERS ET LES ÉLÉMENTS SUPPLÉMENTAIRES DU PARC AUTOMOBILE À PLUSIEURS ÉTAGES, NONCHÊ AUTRES BÂTIMENTS DE SERVICE (TELS QUE LA SALLE DE STOCKAGE) ET DES SYSTÈMES (VENTILATION, PHOTOVOLTAÏQUE SOLAIRE ET THERMIQUE). (French)
28 January 2022
0 references
NUORO
0 references