MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED INLAND WATERWAY SYSTEM OF THE EASTERN PART OF THE EASTERN AREA OF NAPLES, SITUATED AT THE DISPOSAL OF THE EAST AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA (Q2150680): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 75.00000001486976 percent) |
(Changed an Item) |
||||||
Property / co-financing rate | |||||||
75.0 percent
| |||||||
Property / co-financing rate: 75.0 percent / rank | |||||||
Normal rank |
Revision as of 07:14, 20 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED INLAND WATERWAY SYSTEM OF THE EASTERN PART OF THE EASTERN AREA OF NAPLES, SITUATED AT THE DISPOSAL OF THE EAST AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA |
Project in Italy financed by DG Regio |
Statements
25,218,993.5 Euro
0 references
33,625,324.66 Euro
0 references
75.0 percent
0 references
20 December 2001
0 references
9 February 2019
0 references
AUTORITA' DI SISTEMA PORTUALE DEL MAR TIRRENO CENTRALE
0 references
LA REALIZZAZIONE DEI LAVORI DI ESCAVO PERMETTE IL MIGLIORAMENTO DELLE CONDIZIONI DI SICUREZZA PER LE NAVI CHE ATTUALMENTE FANNO SCALO NEL PORTO DI NAPOLI, CONSENTENDO UN NOTEVOLE MIGLIORAMENTO DELLA MANOVRE E DELL'ORMEGGIO DELLE STESSE. SI TRATTA DI DRAGAGGIO DI MATERIALE DEPOSITATO NEI DECENNI CHE SARà DEPOSITATO NELLA CASSA DI COLMATA REALIZZATA ALLA DARSENA DI LEVANTE DEL PORTO DI NAPOLI.NELL'AMBITO DEI LAVORI DI DRAGAGGIO Ê PREVISTA LA DEMOLIZIONE DEL PONTILE ESISTENTE ALLA DARSENA MARINELLA UTILIZZATO PER IL CARICO DELLE RINFUSE ASSERVITE AL SILOS GRANARIO, ATTUALMENTE INUTILIZZATO E FATISCENTE. (Italian)
0 references
Identifiers
I67E12000290007
0 references