CONSTANT DEVELOPMENT AND GROWTH POSTIR — NEW PAINTING PLANT (Q4051646): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en, and other parts: Adding English translations)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
DÉVELOPPEMENT CONSTANT ET CROISSANCE POSTIR — NOUVELLE USINE DE PEINTURE
Property / summary
 
AU COURS DES DEUX DERNIÈRES ANNÉES, POSTIR SRL A AUGMENTÉ SES REVENUS DE PRODUCTION DE 20 %, CE QUI A CONDUIT À LA DÉCISION D’ACHETER EN 2017 DEUX BÂTIMENTS ADJACENTS À CELUI EXISTANT LE 2 JUIN, EN DÉCIDANT ENTRE AUTRES DE DÉPLACER LA PHASE DE PEINTURE ACTUELLE QUI EST MAINTENANT SITUÉE DANS VIA PEDRET. CETTE OPÉRATION ENTRAÎNERA DES ÉCONOMIES DE TEMPS ET DE COÛTS CONSIDÉRABLES EN RAISON DU MOUVEMENT DES PIÈCES PRODUITES À PEINDRE. EN OUTRE, ENTRE LES TROIS HANGARS ADJACENTS SITUÉS LE 2 JUIN 13/12 ET LE 8 PE (French)
Property / summary: AU COURS DES DEUX DERNIÈRES ANNÉES, POSTIR SRL A AUGMENTÉ SES REVENUS DE PRODUCTION DE 20 %, CE QUI A CONDUIT À LA DÉCISION D’ACHETER EN 2017 DEUX BÂTIMENTS ADJACENTS À CELUI EXISTANT LE 2 JUIN, EN DÉCIDANT ENTRE AUTRES DE DÉPLACER LA PHASE DE PEINTURE ACTUELLE QUI EST MAINTENANT SITUÉE DANS VIA PEDRET. CETTE OPÉRATION ENTRAÎNERA DES ÉCONOMIES DE TEMPS ET DE COÛTS CONSIDÉRABLES EN RAISON DU MOUVEMENT DES PIÈCES PRODUITES À PEINDRE. EN OUTRE, ENTRE LES TROIS HANGARS ADJACENTS SITUÉS LE 2 JUIN 13/12 ET LE 8 PE (French) / rank
 
Normal rank
Property / summary: AU COURS DES DEUX DERNIÈRES ANNÉES, POSTIR SRL A AUGMENTÉ SES REVENUS DE PRODUCTION DE 20 %, CE QUI A CONDUIT À LA DÉCISION D’ACHETER EN 2017 DEUX BÂTIMENTS ADJACENTS À CELUI EXISTANT LE 2 JUIN, EN DÉCIDANT ENTRE AUTRES DE DÉPLACER LA PHASE DE PEINTURE ACTUELLE QUI EST MAINTENANT SITUÉE DANS VIA PEDRET. CETTE OPÉRATION ENTRAÎNERA DES ÉCONOMIES DE TEMPS ET DE COÛTS CONSIDÉRABLES EN RAISON DU MOUVEMENT DES PIÈCES PRODUITES À PEINDRE. EN OUTRE, ENTRE LES TROIS HANGARS ADJACENTS SITUÉS LE 2 JUIN 13/12 ET LE 8 PE (French) / qualifier
 
point in time: 28 January 2022
Timestamp+2022-01-28T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:40, 28 January 2022

Project Q4051646 in Italy
Language Label Description Also known as
English
CONSTANT DEVELOPMENT AND GROWTH POSTIR — NEW PAINTING PLANT
Project Q4051646 in Italy

    Statements

    0 references
    24,387.59 Euro
    0 references
    48,775.18 Euro
    0 references
    50.0 percent
    0 references
    POSTIR SRL
    0 references
    0 references
    NELL¿ULTIMO BIENNIO POSTIR SRL HA INCREMENTATO I RICAVI DA PRODUZIONE DEL 20% E QUESTO HA PORTATO ALLA DECISIONE DI ACQUISTARE NEL 2017 BEN DUE IMMOBILI ADIACENTI A QUELLO ESISTENTE IN VIA 2 GIUGNO, DECIDENDO TRA L¿ALTRO DI SPOSTARE L¿ATTUALE FASE DI VERNICIATURA CHE OGGI SI TROVA IN VIA PEDRET. TALE OPERAZIONE PORTERà A UN NOTEVOLE RISPARMIO DI COSTI E TEMPO DOVUTI ALLO SPOSTAMENTO DI PARTI PRODOTTE DA VERNICIARE. INOLTRE TRA I TRE CAPANNONI ADIACENTI SITI IN VIA 2 GIUGNO 13 / 12 E 8 PE (Italian)
    0 references
    IN THE LAST TWO YEARS POSTIR SRL HAS INCREASED PRODUCTION REVENUES BY 20 % AND THIS LED TO THE DECISION TO BUY IN 2017 TWO BUILDINGS ADJACENT TO THE ONE EXISTING ON 2 JUNE, DECIDING AMONG OTHER THINGS TO MOVE THE CURRENT PAINTING PHASE THAT IS NOW LOCATED IN VIA PEDRET. THIS OPERATION WILL LEAD TO CONSIDERABLE COST AND TIME SAVINGS DUE TO THE MOVEMENT OF PARTS PRODUCED TO BE PAINTED. IN ADDITION, BETWEEN THE THREE ADJACENT SHEDS LOCATED IN VIA 2 JUNE 13/12 AND 8 EP (English)
    27 January 2022
    0 references
    AU COURS DES DEUX DERNIÈRES ANNÉES, POSTIR SRL A AUGMENTÉ SES REVENUS DE PRODUCTION DE 20 %, CE QUI A CONDUIT À LA DÉCISION D’ACHETER EN 2017 DEUX BÂTIMENTS ADJACENTS À CELUI EXISTANT LE 2 JUIN, EN DÉCIDANT ENTRE AUTRES DE DÉPLACER LA PHASE DE PEINTURE ACTUELLE QUI EST MAINTENANT SITUÉE DANS VIA PEDRET. CETTE OPÉRATION ENTRAÎNERA DES ÉCONOMIES DE TEMPS ET DE COÛTS CONSIDÉRABLES EN RAISON DU MOUVEMENT DES PIÈCES PRODUITES À PEINDRE. EN OUTRE, ENTRE LES TROIS HANGARS ADJACENTS SITUÉS LE 2 JUIN 13/12 ET LE 8 PE (French)
    28 January 2022
    0 references
    ROMANS D'ISONZO
    0 references