PLANT WORKS AT THE PRIMARY AND SECONDARY SCHOOL OF SAN LEONARDO FOR REDUCTION (Q2031101): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 50.00000049408526 percent)
(‎Changed an Item)
Property / co-financing rate
 
50.0 percent
Amount50.0 percent
Unitpercent
Property / co-financing rate: 50.0 percent / rank
 
Normal rank

Revision as of 04:19, 20 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
PLANT WORKS AT THE PRIMARY AND SECONDARY SCHOOL OF SAN LEONARDO FOR REDUCTION
Project in Italy financed by DG Regio

    Statements

    0 references
    505,985.55 Euro
    0 references
    1,011,971.09 Euro
    0 references
    50.0 percent
    0 references
    14 March 2016
    0 references
    20 September 2018
    0 references
    13 August 2018
    0 references
    UFFICIO TECNICO
    0 references
    0 references

    46°3'39.24"N, 13°14'21.34"E
    0 references
    SI PREVEDE LA REALIZZAZIONE DI UN CAPPOTTO SU TUTTE LE PARETI PERIMETRALI NONCHé UN ISOLAMENTO DELLA COPERTURA NEL LATO INTERNO CON DELLA LANA DI ROCCIA IMBUSTATA DA PORRE IN OPERA SOPRA IL CONTROSOFFITTO ESISTENTE, E DELL¿ISOLAMENTO DELL¿INTERCAPEDINE DI PAVIMENTO NELL¿INFERNOTTO DOVE PASSANO I CAVIDOTTI OVVERO NEL SOLAIO NON RISCALDATO VERSO IL TERRENO; SI PREVEDE LA SOSTITUZIONE DELLE PARETI VETRATE DI FACCIATA E DEGLI INFISSI IN GENERE E L¿INSTALLAZIONE DI SISTEMI DI SCHERMATURA A (Italian)
    0 references

    Identifiers

    J29D16000020002
    0 references