UPGRADING OF THE BT ELECTRICITY NETWORK IN THE MUNICIPALITY OF CASTIGLIONE DI SICILIA AND THE IMPLEMENTATION OF SMART GRIDS ON THE DISTRIBUTION NETWORK TO ENSURE THE MANAGEMENT OF BIDIRECTIONAL ELECTRICITY FLOWS FROM DISTRIBUTED GENERATION AND FAVOUR THE PRODUCTION OF ENERGY FROM RENEWABLE SOURCES. (Q2017740): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 73.8759511268397 percent)
(‎Changed an Item)
Property / co-financing rate
 
73.88 percent
Amount73.88 percent
Unitpercent
Property / co-financing rate: 73.88 percent / rank
 
Normal rank

Revision as of 03:45, 20 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
UPGRADING OF THE BT ELECTRICITY NETWORK IN THE MUNICIPALITY OF CASTIGLIONE DI SICILIA AND THE IMPLEMENTATION OF SMART GRIDS ON THE DISTRIBUTION NETWORK TO ENSURE THE MANAGEMENT OF BIDIRECTIONAL ELECTRICITY FLOWS FROM DISTRIBUTED GENERATION AND FAVOUR THE PRODUCTION OF ENERGY FROM RENEWABLE SOURCES.
Project in Italy financed by DG Regio

    Statements

    0 references
    2,110,523.78 Euro
    0 references
    2,856,848.2 Euro
    0 references
    73.88 percent
    0 references
    15 June 2018
    0 references
    7 April 2020
    0 references
    COMUNE DI CASTIGLIONE DI SICILIA
    0 references

    37°52'55.42"N, 15°7'17.00"E
    0 references
    L'IMPLEMENTAZIONE DELLE SMART GRID SULLA RETE DI DISTRIBUZIONE ELETTRICA Ê INDISPENSABILE NELL'ATTUALE CONTESTO DI CRESCITA DELLE ENERGIE RINNOVABILI, PER GARANTIRE UNA GESTIONE DEI FLUSSI ENERGETICI ORMAI NON PIù ASSUMIBILI COME UNIDIREZIONALI. IL PROGETTO PREVEDE, LA PREDISPOSIZIONE SULLA RETE DI APPARATI DI MONITORAGGIO IN GRADO DI RILEVARE IN TEMPO REALE INFORMAZIONI RELATIVE AL FUNZIONAMENTO DELLA RETE, E APPARATI DI TELECONTROLLO OPPORTUNAMENTE COORDINATI (SULLA BASE DELLE INFORMAZIONI ACQUISITE) AL FINE DI MIGLIORARE SIA LA CONTINUITà CHE LA QUALITà DEL SERVIZIO ELETTRICO ED AUMENTARE L'EFFICIENZA ENERGETICA DELLA RETE STESSA MINIMIZZANDONE LE PERDITE TECNICHE.IL PROGETTO Ê SVILUPPATO SECONDO 4 MACRO-AZIONI COSì ELENCATE: -SOSTITUZIONE E POTENZIAMENTO DELLE ATTUALI CABINE ELETTRICHE DI TRASFORMAZIONE MTBT IN LINEA CON LA NORMATIVA VIGENTE.-SOSTITUZIONE DI PORZIONI DI RETE DI DISTRIBUZIONE CON CAVI DI SEZIONI ADEGUATE AI FLUSSI ENERGETICI ATTUALI E IN PREVISIONE DI SVILUPPI (Italian)
    0 references

    Identifiers

    H53H17000010001
    0 references