Improvement of the energy performance of the school canteen and the anti-wine satellite (Q72111): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project aims at improving the thermal characteristics of the perimeter building of the school pavilion building (owned by the city), which is located on plot 60/11.Objekt 60/5, was issued in 1964 and reconstructed in 1981. The energy building is currently very wasteful (G) and requires the necessary construction work. The project proposes the replacement of original filling, insulation of facades, roof structures of the ceilings, and the ver...) |
(Removed claim: co-financing rate (P837): 39.9999997892566 percent) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 39.9999997892566 percent / rank | |||||||
Revision as of 18:48, 19 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of the energy performance of the school canteen and the anti-wine satellite |
Project in Czech Republic financed by DG Regio |
Statements
1,518,434.32 Czech koruna
0 references
3,796,085.82 Czech koruna
0 references
16 September 2016
0 references
30 April 2018
0 references
Město Protivín
0 references
39811
0 references
Záměrem projektu je zlepšení tepelně technických vlastností obvodových konstrukcí budovy školního pavilonu(ve vlastnictví města), která se nachází na parcele č. 60/5,60/11.Objekt byl vystaven v roce 1964 a rekonstruován v roce1981. V současné době je budova z energetického hlediska velmi nehospodárná (G) a vyžaduje potřebné stavební úpravy. Projekt navrhuje výměnu původních výplní otvorů, zateplení fasád, střešních konstrukcí stropů a svislé zateplení sklepního kamenného zdiva kamenného soklu. (Czech)
0 references
The project aims at improving the thermal characteristics of the perimeter building of the school pavilion building (owned by the city), which is located on plot 60/11.Objekt 60/5, was issued in 1964 and reconstructed in 1981. The energy building is currently very wasteful (G) and requires the necessary construction work. The project proposes the replacement of original filling, insulation of facades, roof structures of the ceilings, and the vertical insulation of the cellar pit. (English)
0 references
Identifiers
CZ.05.5.18/0.0/0.0/15_019/0001594
0 references