(10360.14072017.115000153) EF_EN_MUTTI (Q2057044): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
||||||||||||||
label / es | label / es | ||||||||||||||
(10360.14072017.115000153) EF_EN_MUTTI | |||||||||||||||
Property / summary | |||||||||||||||
EFICIENCIA ENERGÉTICA DE LA ESCUELA PRIMARIA MUTTI. SOLO UN EDIFICIO Y UN LOTE DE INTERVENCIÓN, QUE SE LLEVARÁ A CABO EN LA ESCUELA NO UTILIZADA (VERANO). SE HAN PREVISTO LAS SIGUIENTES ACCIONES: —COIBENTACIÓN TEJADO-COIBENTACIÓN PAREDES EXTERNAS-ACCESORIOS DE SUSTITUCIÓN-CALOR CENTRAL REFACIACIÓN-MODIFICACIÓN DE LOS DETALLES DEL SISTEMA TÉRMICO INTERNO SE DETALLAN EN EL INFORME GENERAL DEL PROYECTO, ANEXO A LA PRESENTE SOLICITUD. (Spanish) | |||||||||||||||
Property / summary: EFICIENCIA ENERGÉTICA DE LA ESCUELA PRIMARIA MUTTI. SOLO UN EDIFICIO Y UN LOTE DE INTERVENCIÓN, QUE SE LLEVARÁ A CABO EN LA ESCUELA NO UTILIZADA (VERANO). SE HAN PREVISTO LAS SIGUIENTES ACCIONES: —COIBENTACIÓN TEJADO-COIBENTACIÓN PAREDES EXTERNAS-ACCESORIOS DE SUSTITUCIÓN-CALOR CENTRAL REFACIACIÓN-MODIFICACIÓN DE LOS DETALLES DEL SISTEMA TÉRMICO INTERNO SE DETALLAN EN EL INFORME GENERAL DEL PROYECTO, ANEXO A LA PRESENTE SOLICITUD. (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: EFICIENCIA ENERGÉTICA DE LA ESCUELA PRIMARIA MUTTI. SOLO UN EDIFICIO Y UN LOTE DE INTERVENCIÓN, QUE SE LLEVARÁ A CABO EN LA ESCUELA NO UTILIZADA (VERANO). SE HAN PREVISTO LAS SIGUIENTES ACCIONES: —COIBENTACIÓN TEJADO-COIBENTACIÓN PAREDES EXTERNAS-ACCESORIOS DE SUSTITUCIÓN-CALOR CENTRAL REFACIACIÓN-MODIFICACIÓN DE LOS DETALLES DEL SISTEMA TÉRMICO INTERNO SE DETALLAN EN EL INFORME GENERAL DEL PROYECTO, ANEXO A LA PRESENTE SOLICITUD. (Spanish) / qualifier | |||||||||||||||
point in time: 25 January 2022
|
Revision as of 06:59, 25 January 2022
Project Q2057044 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (10360.14072017.115000153) EF_EN_MUTTI |
Project Q2057044 in Italy |
Statements
143,100.83 Euro
0 references
409,444.44 Euro
0 references
34.95 percent
0 references
3 April 2018
0 references
3 April 2020
0 references
16 November 2020
0 references
COMUNE DI PIETRASANTA
0 references
EFFICIENTAMENTO ENERGETICO DELLA SCUOLA PRIMARIA MUTTI. UN SOLO EDIFICIO E UN SOLO LOTTO DI INTERVENTO, DA ESEGUIRE A SCUOLA NON UTILIZZATA (ESTATE). PREVISTI I SEGUENTI INTERVENTI: -COIBENTAZIONE TETTI-COIBENTAZIONE PARETI ESTERNE-SOSTITUZIONE INFISSI-RIFACIMENTO CENTRALE TERMICA-MODIFICA IMPIANTO TERMICO INTERNOI DETTAGLI SONO ESPOSTI NELLA RELAZIONE GENERALE DEL PROGETTO, ALLEGATA ALLA PRESENTE DOMANDA. (Italian)
0 references
ENERGY EFFICIENCY IN PRIMARY SCHOOL MUTTI. ONLY ONE BUILDING AND ONE LOT OF INTERVENTION, TO BE CARRIED OUT AT SCHOOL NOT IN USE (SUMMER). THE FOLLOWING MEASURES ARE ENVISAGED: — TETI-COIBENTING EXTERNAL WALL TERMA-STITUTION INFISI-REFREMENT CENTRAL TERMICA-AMENDMENTS THERMAL SYSTEM, DETAILS OF WHICH ARE SET OUT IN THE GENERAL REPORT OF THE DRAFT, ATTACHED TO THIS APPLICATION. (English)
0 references
EFFICACITÉ ÉNERGÉTIQUE DE L’ÉCOLE PRIMAIRE MUTTI. UN SEUL BÂTIMENT ET UN LOT D’INTERVENTION, À RÉALISER DANS L’ÉCOLE INUTILISÉE (ÉTÉ). LES ACTIONS SUIVANTES ONT ÉTÉ PRÉVUES: —COIBENTATION TOIT-COIBENTATION PAROIS EXTÉRIEURES-APPAREILS DE REMPLACEMENT-CHAUFFAGE CENTRAL REFACIATION-MODIFIANT LES DÉTAILS DU SYSTÈME THERMIQUE INTERNE SONT REPRIS DANS LE RAPPORT GÉNÉRAL DE PROJET ANNEXÉ À LA PRÉSENTE DEMANDE. (French)
16 December 2021
0 references
ENERGIE-EFFICIËNTIE VAN DE BASISSCHOOL MUTTI. SLECHTS ÉÉN GEBOUW EN ÉÉN PARTIJ INTERVENTIE, TE VERRICHTEN OP ONGEBRUIKTE SCHOOL (ZOMER). DE VOLGENDE ACTIES WAREN GEPLAND: —COIBENTATION DAK-COIBENTATION EXTERNE WANDEN-VERVANGING ARMATUREN-WARMTE CENTRALE REFACIATION-MODIFICERENDE INTERNE THERMISCHE SYSTEEM DETAILS ZIJN OPGENOMEN IN HET ALGEMENE PROJECTRAPPORT, DAT BIJ DEZE AANVRAAG IS GEVOEGD. (Dutch)
23 December 2021
0 references
ENERGIEEFFIZIENZ DER MUTTI-GRUNDSCHULE. NUR EIN GEBÄUDE UND EINE MENGE INTERVENTION, DIE IN UNGENUTZTER SCHULE (SOMMER) DURCHGEFÜHRT WERDEN. FOLGENDE MASSNAHMEN SIND GEPLANT: —COIBENTATION DACH-KOIBENTATION AUSSENWÄNDE-ERSATZVORRICHTUNGEN-WÄRME-ZENTRALE REFACIATION-MODIFIZIERENDE INTERNE WÄRMESYSTEM-DETAILS SIND IM ALLGEMEINEN PROJEKTBERICHT ENTHALTEN, DER DIESER ANWENDUNG BEIGEFÜGT IST. (German)
24 December 2021
0 references
EFICIENCIA ENERGÉTICA DE LA ESCUELA PRIMARIA MUTTI. SOLO UN EDIFICIO Y UN LOTE DE INTERVENCIÓN, QUE SE LLEVARÁ A CABO EN LA ESCUELA NO UTILIZADA (VERANO). SE HAN PREVISTO LAS SIGUIENTES ACCIONES: —COIBENTACIÓN TEJADO-COIBENTACIÓN PAREDES EXTERNAS-ACCESORIOS DE SUSTITUCIÓN-CALOR CENTRAL REFACIACIÓN-MODIFICACIÓN DE LOS DETALLES DEL SISTEMA TÉRMICO INTERNO SE DETALLAN EN EL INFORME GENERAL DEL PROYECTO, ANEXO A LA PRESENTE SOLICITUD. (Spanish)
25 January 2022
0 references
Identifiers
G46C18001520004
0 references