* bonding (Q2043973): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
||||||||||||||
label / es | label / es | ||||||||||||||
*individual* INCLUIDO | |||||||||||||||
Property / summary | |||||||||||||||
EL PROYECTO SE INCLUYÓ EN UN PLAN DE ACTIVIDADES CUATRIENAL ARTICULADO EN LOS SIGUIENTES PASOS:1. Instalación de un *individual* INCLUIDO PORTOS A DOS Existentes (2 semestre 2016)2. TRASLADAR LOS MARCOS DEL DEPARTAMENTO DE ENSAMBLE A UN NUEVO LUGAR DE PRODUCCIÓN Y LA CONSIGUIENTE RECONFIGURACIÓN DE LA DISTRIBUCIÓN DE LA PRODUCCIÓN DEL DEPARTAMENTO DE MONTAJE FINAL DE LAS PUERTAS (1 SEMESTRE DE 2017)3. SUSTITUCIÓN DE UNA DE LAS DOS ISLAS DE UNIÓN ROBÓTICA EXISTENTES (Spanish) | |||||||||||||||
Property / summary: EL PROYECTO SE INCLUYÓ EN UN PLAN DE ACTIVIDADES CUATRIENAL ARTICULADO EN LOS SIGUIENTES PASOS:1. Instalación de un *individual* INCLUIDO PORTOS A DOS Existentes (2 semestre 2016)2. TRASLADAR LOS MARCOS DEL DEPARTAMENTO DE ENSAMBLE A UN NUEVO LUGAR DE PRODUCCIÓN Y LA CONSIGUIENTE RECONFIGURACIÓN DE LA DISTRIBUCIÓN DE LA PRODUCCIÓN DEL DEPARTAMENTO DE MONTAJE FINAL DE LAS PUERTAS (1 SEMESTRE DE 2017)3. SUSTITUCIÓN DE UNA DE LAS DOS ISLAS DE UNIÓN ROBÓTICA EXISTENTES (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: EL PROYECTO SE INCLUYÓ EN UN PLAN DE ACTIVIDADES CUATRIENAL ARTICULADO EN LOS SIGUIENTES PASOS:1. Instalación de un *individual* INCLUIDO PORTOS A DOS Existentes (2 semestre 2016)2. TRASLADAR LOS MARCOS DEL DEPARTAMENTO DE ENSAMBLE A UN NUEVO LUGAR DE PRODUCCIÓN Y LA CONSIGUIENTE RECONFIGURACIÓN DE LA DISTRIBUCIÓN DE LA PRODUCCIÓN DEL DEPARTAMENTO DE MONTAJE FINAL DE LAS PUERTAS (1 SEMESTRE DE 2017)3. SUSTITUCIÓN DE UNA DE LAS DOS ISLAS DE UNIÓN ROBÓTICA EXISTENTES (Spanish) / qualifier | |||||||||||||||
point in time: 25 January 2022
|
Revision as of 23:56, 24 January 2022
Project Q2043973 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | * bonding |
Project Q2043973 in Italy |
Statements
22,500.0 Euro
0 references
45,000.0 Euro
0 references
50.0 percent
0 references
1 October 2017
0 references
30 January 2019
0 references
28 June 2018
0 references
CISAPLAST S.P.A.
0 references
IL PROGETTO INSERITO ALLINTERNO DI UN PIANO INDUSTRIALE QUADRIENNALE ARTICOLATO NEI SEGUENTI PASSI:1. INSTALLAZIONE DI UNA *individuo* DI INCOLLAGGIO PORTE IN AGGIUNTA ALLE DUE ESISTENTI (2 SEMESTRE 2016)2. SPOSTAMENTO DEL REPARTO DI ASSEMBLAGGIO CORNICI IN UN NUOVO SITO PRODUTTIVO E CONSEGUENTE RICONFIGURAZIONE DEL LAYOUT PRODUTTIVO DEL REPARTO DI ASSEMBLAGGIO FINALE DELLE PORTE (1 SEMESTRE 2017)3. SOSTITUZIONE DI UNA DELLE DUE ISOLE ROBOTIZZATE DI INCOLLAGGIO GI ESISTENTI (Italian)
0 references
THE PROJECT IS PART OF A FOUR-YEAR BUSINESS PLAN WHICH IS DIVIDED INTO THE FOLLOWING STAGES: 1. Installation of an individual * of bonding PORT TO DUE EXISTS (2 SEMESTRE 2016) 2. THE ASSEMBLY OF THE FRAME ASSEMBLY UNIT IN A NEW PRODUCTION SITE AND THE RESULTING RECONFIGURATION OF THE PRODUCTION LAYOUT OF THE FINAL ASSEMBLY OF THE DOORS (1 SEMESTERS 2017) 3. REPLACEMENT OF ONE OF THE TWO EXISTING ROBOT-BONDING ISLANDS (English)
0 references
LE PROJET FAISAIT PARTIE D’UN PLAN D’ACTIVITÉS QUADRIENNAL ARTICULÉ AUX ÉTAPES SUIVANTES:1. Installation D’UN *individuel* INCLUDING PORTS AJOURS À DEUX PORTS existants (2 semestre 2016)2. DÉPLACER LES CADRES DU DÉPARTEMENT DE L’ASSEMBLAGE VERS UN NOUVEAU SITE DE PRODUCTION ET, PAR LA SUITE, RECONFIGURER LA CONFIGURATION DE PRODUCTION DU DÉPARTEMENT DE L’ASSEMBLAGE FINAL DES PORTES (1 SEMESTRE 2017)3. REMPLACEMENT DE L’UNE DES DEUX ÎLES DE LIAISON ROBOTIQUE EXISTANTES (French)
16 December 2021
0 references
HET PROJECT MAAKTE DEEL UIT VAN EEN VIERJARIG BUSINESSPLAN DAT IN DE VOLGENDE STAPPEN IS UITGEWERKT:1. Installatie van een *individuele* INCLUDING PORTS TWEE existents (2 semestre 2016)2. HET VERPLAATSEN VAN DE FRAMES VAN DE AFDELING ASSEMBLAGE NAAR EEN NIEUWE PRODUCTIELOCATIE EN DE DAARUIT VOORTVLOEIENDE HERCONFIGURATIE VAN DE PRODUCTIE-INDELING VAN DE DEFINITIEVE AFDELING ASSEMBLAGE VAN DE DEUREN (1 SEMESTER 2017)3. VERVANGING VAN EEN VAN DE TWEE BESTAANDE ROBOTGEBONDEN EILANDEN (Dutch)
23 December 2021
0 references
DAS PROJEKT WAR IN EINEM VIERJÄHRIGEN GESCHÄFTSPLAN ENTHALTEN, DER IN DEN FOLGENDEN SCHRITTEN:1 FORMULIERT WURDE. Installation von A *individuell* INCLUDING PORTS AN TWO existenten (2 semestre 2016)2. UMZUG DER MONTAGEABTEILUNG AUF EINE NEUE PRODUKTIONSSTÄTTE UND KONSEQUENTE NEUKONFIGURATION DES PRODUKTIONSLAYOUTS DER ENDGÜLTIGEN MONTAGEABTEILUNG DER TÜREN (1 HALBJAHR 2017)3. ERSATZ EINER DER BEIDEN BESTEHENDEN ROBOTIC BONDING ISLANDS (German)
24 December 2021
0 references
EL PROYECTO SE INCLUYÓ EN UN PLAN DE ACTIVIDADES CUATRIENAL ARTICULADO EN LOS SIGUIENTES PASOS:1. Instalación de un *individual* INCLUIDO PORTOS A DOS Existentes (2 semestre 2016)2. TRASLADAR LOS MARCOS DEL DEPARTAMENTO DE ENSAMBLE A UN NUEVO LUGAR DE PRODUCCIÓN Y LA CONSIGUIENTE RECONFIGURACIÓN DE LA DISTRIBUCIÓN DE LA PRODUCCIÓN DEL DEPARTAMENTO DE MONTAJE FINAL DE LAS PUERTAS (1 SEMESTRE DE 2017)3. SUSTITUCIÓN DE UNA DE LAS DOS ISLAS DE UNIÓN ROBÓTICA EXISTENTES (Spanish)
25 January 2022
0 references
Identifiers
E52B18001230006
0 references