INTEGRATED MEASURES FOR THE COMPLETION OF COASTAL DEFENCE WORKS (BETWEEN THE MOUTH OF THE RIVER NETO AND THE COASTAL ZONE OF CAPO RIZZUTO) (Q2013144): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
||||||||||||||
label / es | label / es | ||||||||||||||
INTERVENCIONES INTEGRADAS PARA LA FINALIZACIÓN DE LAS OBRAS DE DEFENSA COSTERA (ENTRE LA DESEMBOCADURA DEL RÍO NETO Y LA COSTA DE ISOLA CAPO RIZZUTO) | |||||||||||||||
Property / summary | |||||||||||||||
INTERVENCIONES INTEGRADAS PARA LA FINALIZACIÓN DE LAS OBRAS DE DEFENSA COSTERA (ENTRE LA DESEMBOCADURA DEL RÍO NETO Y LA COSTA DE ISOLA CAPO RIZZUTO) (Spanish) | |||||||||||||||
Property / summary: INTERVENCIONES INTEGRADAS PARA LA FINALIZACIÓN DE LAS OBRAS DE DEFENSA COSTERA (ENTRE LA DESEMBOCADURA DEL RÍO NETO Y LA COSTA DE ISOLA CAPO RIZZUTO) (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INTERVENCIONES INTEGRADAS PARA LA FINALIZACIÓN DE LAS OBRAS DE DEFENSA COSTERA (ENTRE LA DESEMBOCADURA DEL RÍO NETO Y LA COSTA DE ISOLA CAPO RIZZUTO) (Spanish) / qualifier | |||||||||||||||
point in time: 24 January 2022
|
Revision as of 20:23, 24 January 2022
Project Q2013144 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | INTEGRATED MEASURES FOR THE COMPLETION OF COASTAL DEFENCE WORKS (BETWEEN THE MOUTH OF THE RIVER NETO AND THE COASTAL ZONE OF CAPO RIZZUTO) |
Project Q2013144 in Italy |
Statements
1,200,000.0 Euro
0 references
1,600,000.0 Euro
0 references
75.0 percent
0 references
30 June 2017
0 references
31 December 2021
0 references
REGIONE CALABRIA - DIPARTIMENTO 9 - INFRASTRUTTURE - LAVORI PUBBLICI
0 references
INTERVENTI INTEGRATI PER IL COMPLETAMENTO DELLE OPERE DI DIFESA COSTIERA (TRA FOCE DEL FIUME NETO E LITORALE DI ISOLA CAPO RIZZUTO) (Italian)
0 references
INTEGRATED MEASURES FOR THE COMPLETION OF COASTAL DEFENCE WORKS (BETWEEN THE MOUTH OF THE RIVER NETO AND THE COASTAL ZONE OF CAPO RIZZUTO) (English)
0 references
INTERVENTIONS INTÉGRÉES POUR L’ACHÈVEMENT DES TRAVAUX DE DÉFENSE CÔTIÈRE (ENTRE L’EMBOUCHURE DU FLEUVE NETO ET LA CÔTE D’ISOLA CAPO RIZZUTO) (French)
14 December 2021
0 references
GEÏNTEGREERDE INTERVENTIES VOOR DE VOLTOOIING VAN KUSTVERDEDIGINGSWERKEN (TUSSEN DE MONDING VAN DE RIVIER DE NETO EN DE KUST VAN ISOLA CAPO RIZZUTO) (Dutch)
22 December 2021
0 references
INTEGRIERTE INTERVENTIONEN ZUR FERTIGSTELLUNG DER KÜSTENSCHUTZARBEITEN (ZWISCHEN DER MÜNDUNG DES FLUSSES NETO UND DER KÜSTE VON ISOLA CAPO RIZZUTO) (German)
24 December 2021
0 references
INTERVENCIONES INTEGRADAS PARA LA FINALIZACIÓN DE LAS OBRAS DE DEFENSA COSTERA (ENTRE LA DESEMBOCADURA DEL RÍO NETO Y LA COSTA DE ISOLA CAPO RIZZUTO) (Spanish)
24 January 2022
0 references
Identifiers
J75B17000600006
0 references