Remediation of the former Exatherm site, Rail Brod; (Q62356): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The status of a complex situated in the city’s wider city and the associated contamination of Hg (in walls and floor as well as in the atmosphere) entirely excludes any form of use in the future. Remediation represents the removal of buildings and contaminated earths, including drains with a displacement tank downstream of the range. The project includes in particular a detailed design of the method of remediation work, including waste managemen...) |
(Removed claim: co-financing rate (P837): 84.99999998869 percent) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 84.99999998869 percent / rank | |||||||
Revision as of 17:51, 19 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Remediation of the former Exatherm site, Rail Brod; |
Project in Czech Republic financed by DG Regio |
Statements
7,515,500.3 Czech koruna
0 references
8,841,765.06 Czech koruna
0 references
1 December 2016
0 references
21 January 2019
0 references
27 January 2019
0 references
Město Železný Brod
0 references
46822
0 references
Stav areálu, který se nachází v širším středu města, a související kontaminace Hg (jak ve stěnách a podlaze, tak v ovzduší) zcela vylučuje jakýkoli způsob jeho využívání v budoucnosti. Sanace představuje odstranění budov a kontaminovaných zemin, včetně kanalizace s odsazovací nádrží za areálem. Součástí projektu je zejména podrobně zpracovaný návrh způsobu sanačně-demoličních prací včetně řešení nakládání s odpady, řešení problematiky BOZP, řízení akce, monitoring a průkaz dosažení cílů sanace. (Czech)
0 references
The status of a complex situated in the city’s wider city and the associated contamination of Hg (in walls and floor as well as in the atmosphere) entirely excludes any form of use in the future. Remediation represents the removal of buildings and contaminated earths, including drains with a displacement tank downstream of the range. The project includes in particular a detailed design of the method of remediation work, including waste management, OSH solutions, management of the action, monitoring and demonstration of the objectives of remediation. (English)
0 references
Identifiers
CZ.05.3.24/0.0/0.0/16_036/0002493
0 references