(‎Created claim: summary (P836): The object of the dossier is the construction of a dry reservoir (polder), a water work for flood protection. It is created by redirecting the watercourse to the Dětkovaný potoka, but the water does not accumulate at all under normal conditions. The water is stored during floods, thus transforming the flood tide. The surface of the polder will remain in its original use and will serve as a natural biotope. The area of the receiver at hx is 0.978...)
(‎Removed claim: co-financing rate (P837): 84.9999999726472 percent)
Property / co-financing rate
84.9999999726472 percent
Amount84.9999999726472 percent
Unitpercent
 
Property / co-financing rate: 84.9999999726472 percent / rank
Normal rank
 

Revision as of 17:16, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Implementation of flood protection measures by the municipality of Dětkovice
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    10,876,383.68 Czech koruna
    0 references
    435,055.3472 Euro
    10 January 2020
    0 references
    12,795,745.51 Czech koruna
    0 references
    511,829.8204 Euro
    10 January 2020
    0 references
    15 August 2018
    0 references
    2 July 2019
    0 references
    Obec Dětkovice
    0 references
    0 references

    49°18'9.65"N, 17°4'54.52"E
    0 references

    49°17'53.88"N, 17°6'21.31"E
    0 references
    68323
    0 references
    Předmětem dokumentace je stavba suché nádrže (poldru), což je vodní dílo sloužící k protipovodňové ochraně. Je vytvořeno přehrazením vodního toku Dětkovického potoka, za hrází se však voda za běžných podmínek vůbec neakumuluje. K akumulaci vody dochází během povodní, čímž se transformuje povodňová vlna. Plocha poldru zůstane ponechána v původním využití a bude sloužit jako přírodní biotop. Plocha nádrže při Hmax činí 0,9786 ha, objem nádrže při Hmax dosahuje 35.144 m3 zadržené vody. (Czech)
    0 references
    The object of the dossier is the construction of a dry reservoir (polder), a water work for flood protection. It is created by redirecting the watercourse to the Dětkovaný potoka, but the water does not accumulate at all under normal conditions. The water is stored during floods, thus transforming the flood tide. The surface of the polder will remain in its original use and will serve as a natural biotope. The area of the receiver at hx is 0.9786 ha, the volume of the receiver at hx is 35.144 m³ of water retained. (English)
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/16_034/0002386
    0 references