Static securing of the Regner rock mass (Q57767): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The aim of the project is to prevent the scaling-down and to ensure the stability of the rock mass at Regner Street, Regner Street, on Land Offices No 382/18. Úpice in a surface area of 2 485 m² (infertile land). There is currently a spontaneous loss of stones and rocks from the rock mass. The drop in power of the rocky parts puts traffic at risk after communication at Regner Street, which is Class II II/304 from the Havlovice Úpice, which is al...)
(‎Removed claim: co-financing rate (P837): 84.9999999841774 percent)
Property / co-financing rate
84.9999999841774 percent
Amount84.9999999841774 percent
Unitpercent
 
Property / co-financing rate: 84.9999999841774 percent / rank
Normal rank
 

Revision as of 17:15, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Static securing of the Regner rock mass
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    8,058,109.13 Czech koruna
    0 references
    322,324.3652 Euro
    10 January 2020
    0 references
    9,480,128.39 Czech koruna
    0 references
    379,205.13560000004 Euro
    10 January 2020
    0 references
    8 December 2016
    0 references
    30 June 2018
    0 references
    30 June 2018
    0 references
    MĚSTO ÚPICE
    0 references
    0 references

    50°30'38.99"N, 16°0'50.22"E
    0 references
    54232
    0 references
    Cílem projektu je zamezit skalnímu řícení a zajistit stabilitu skalního masivu v ulici Regnerova v Úpici na pozemcích p.p.č. 382/18 k.ú. Úpice ve výměře 2485 m2 (neplodná půda). V současné době dochází k samovolnému vypadávání kamenů a bloků ze skalního masivu. Pádová energie uvolněných skalních částí ohrožuje provoz po komunikaci v ulici Regnerova, kterou je silnice II. třídy II/304 směrem z Úpice na Havlovice, po které je také pěší provoz. (Czech)
    0 references
    The aim of the project is to prevent the scaling-down and to ensure the stability of the rock mass at Regner Street, Regner Street, on Land Offices No 382/18. Úpice in a surface area of 2 485 m² (infertile land). There is currently a spontaneous loss of stones and rocks from the rock mass. The drop in power of the rocky parts puts traffic at risk after communication at Regner Street, which is Class II II/304 from the Havlovice Úpice, which is also a pedestrian traffic. (English)
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/15_003/0000415
    0 references