Energy optimisation of the production process in Pyrotek CZ, s.r.o. (Q18625): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The main objective of the project is to reduce the energy performance of the production operations of Pyrotek CZ, s.r.o.. The purpose of the project is to upgrade the existing tunnel furnace Technochemica TSX/42/1500 in order to optimise combustion and tensile ratios of the tunnel furnace and, by extension, to refine the management of the heating system., Adding English summary)
(‎Removed claim: co-financing rate (P837): 30.9017057676686 percent)
Property / co-financing rate
30.9017057676686 percent
Amount30.9017057676686 percent
Unitpercent
 
Property / co-financing rate: 30.9017057676686 percent / rank
Normal rank
 

Revision as of 15:06, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy optimisation of the production process in Pyrotek CZ, s.r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,901,999.99 Czech koruna
    0 references
    76,079.9996 Euro
    10 January 2020
    0 references
    6,155,000.0 Czech koruna
    0 references
    246,200.0 Euro
    10 January 2020
    0 references
    31 December 2019
    0 references
    PYROTEK CZ, s.r.o.
    0 references
    0 references

    49°21'47.20"N, 16°39'12.74"E
    0 references
    67801
    0 references
    Hlavním cílem projektu je snížení energetické náročnosti ve výrobním provozu společnosti PYROTEK CZ, s.r.o.. Předmětem projektu je modernizace stávající tunelové pece Technochemica TSX/42/1500 s cílem optimalizovat spalovací a tahové poměry tunelové pece a potažmo zpřesnit řízení topného systému. a. (Czech)
    0 references
    The main objective of the project is to reduce the energy performance of the production operations of Pyrotek CZ, s.r.o.. The purpose of the project is to upgrade the existing tunnel furnace Technochemica TSX/42/1500 in order to optimise combustion and tensile ratios of the tunnel furnace and, by extension, to refine the management of the heating system. (English)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/18_183/0017729
    0 references