Installation of the FVE at the premises of HESTEGO a.s. (Q16766): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 59.9999997068201 percent) |
(Changed an Item) |
||||||
Property / co-financing rate | |||||||
60.0 percent
| |||||||
Property / co-financing rate: 60.0 percent / rank | |||||||
Normal rank |
Revision as of 15:05, 19 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of the FVE at the premises of HESTEGO a.s. |
Project in Czech Republic financed by DG Regio |
Statements
1,227,914.85 Czech koruna
0 references
2,046,524.76 Czech koruna
0 references
60.0 percent
0 references
27 April 2020
0 references
HESTEGO a.s.
0 references
68201
0 references
Předmětem projektu je fotovoltaická elektrárna FVE, která bude připojena k distribuční síti do stávajícího hlavního rozvaděče RH, který je umístěn v hlavní rozvodně objektu.FV systém je navržen na ploše jedné střechy výrobní haly v šestnácti řadách za sebou v celkovém počtu 336 ks FV monokrystalických panelů o jmenovitém výkonu jednotlivého panelu 295 Wp, rozdělených do osmi samostatných stringů. a. (Czech)
0 references
The subject of the project is the photovoltaic power plant, FVE, which will be connected to the distribution network in the existing main switchboard of the RH, which is located in the main distribution station in question. the system is designed for one roof of the production hall in sixteen series in succession in a total number of 336 FV mono-crystalline panels of rated output of an individual panel 295 Wp divided into eight separate units. (English)
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_178/0013558
0 references