Communication of the bridge on the Oder river in Brzeg Dolny with national road No. 94 and voivodeship road No. 340 in the scope – section from voivodeship road No. 341 to district road No. 1353D in Radecz – as a continuation of the construction of the crossing through the Oder (Q95953): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
(‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
label / eslabel / es
 
Comunicación del puente sobre el río Oder en Brzeg Dolny con la carretera nacional 94 y la carretera voivoda n.º 340 en el rango — tramo de la carretera voivoda n.º 341 a la carretera distrital n.º 1353D en Radecz — como continuación de la construcción del cruce a través de Odra
Property / summary
 
El objeto de la inversión es la construcción de un tramo de la carretera que constituye la «carretera de aglomeración A4-S5» — Comunicación del puente sobre el río Oder en Brzeg Dolny con la carretera nacional n.º 94 y carretera voivoda n.º 340 en el área de — tramo de la carretera voivodato n.º 341 (km 12 + 547,80) a la carretera de distrito n.º 1353D en Radecz (km aprox. 17+ 940.00) — como continuación de la construcción de cruces a través de Odra. El objetivo general de la acción es garantizar la coherencia espacial en la red vial existente. El proyecto forma parte de la carretera de circunvalación de la aglomeración, que es también la circunvalación de la ciudad de Brzeg Dolny en el Voivodato de Baja Silesia. Por lo tanto, la acción permitirá retirar el tránsito de la zona urbanizada de la localidad antes mencionada. Además, el objetivo del proyecto es también aliviar el cruce de carreteras de Wrocław generado en municipios adyacentes y del tráfico exterior, cuyo destino son esos municipios. El tramo previsto enriquecerá el sistema de transporte del distrito y del voivodato al oeste de Wrocław, lo que reducirá y mejorará la calidad de los servicios de transporte en el lado occidental de la aglomeración de Wrocław. La creación de una nueva carretera mejorará la seguridad vial en los tramos concurridos de la red vial existente y mejorará la accesibilidad del transporte de los centros regionales. En última instancia, al conectarse a la red existente de carreteras nacionales e internacionales, mejorará la calidad de las conexiones con la red RTE-T. El proyecto se ejecutará en la fórmula «diseño/optimizar y construir». La carretera prevista con una longitud aproximada de 5,4 km será un nuevo elemento del sistema de comunicación con los siguientes parámetros: carretera clase G 1/2, carga 115 kN/eje, categoría de tráfico KR 5, incluidas las carreteras de servicio. Como parte de la inversión, se prevé la construcción de cruces de rotonda y un puente sobre la línea ferroviaria. El grupo destinatario son los usuarios públicos de la vía pública (transporte individual y público), en particular de la zona de inversión, así como del tránsito. (Spanish)
Property / summary: El objeto de la inversión es la construcción de un tramo de la carretera que constituye la «carretera de aglomeración A4-S5» — Comunicación del puente sobre el río Oder en Brzeg Dolny con la carretera nacional n.º 94 y carretera voivoda n.º 340 en el área de — tramo de la carretera voivodato n.º 341 (km 12 + 547,80) a la carretera de distrito n.º 1353D en Radecz (km aprox. 17+ 940.00) — como continuación de la construcción de cruces a través de Odra. El objetivo general de la acción es garantizar la coherencia espacial en la red vial existente. El proyecto forma parte de la carretera de circunvalación de la aglomeración, que es también la circunvalación de la ciudad de Brzeg Dolny en el Voivodato de Baja Silesia. Por lo tanto, la acción permitirá retirar el tránsito de la zona urbanizada de la localidad antes mencionada. Además, el objetivo del proyecto es también aliviar el cruce de carreteras de Wrocław generado en municipios adyacentes y del tráfico exterior, cuyo destino son esos municipios. El tramo previsto enriquecerá el sistema de transporte del distrito y del voivodato al oeste de Wrocław, lo que reducirá y mejorará la calidad de los servicios de transporte en el lado occidental de la aglomeración de Wrocław. La creación de una nueva carretera mejorará la seguridad vial en los tramos concurridos de la red vial existente y mejorará la accesibilidad del transporte de los centros regionales. En última instancia, al conectarse a la red existente de carreteras nacionales e internacionales, mejorará la calidad de las conexiones con la red RTE-T. El proyecto se ejecutará en la fórmula «diseño/optimizar y construir». La carretera prevista con una longitud aproximada de 5,4 km será un nuevo elemento del sistema de comunicación con los siguientes parámetros: carretera clase G 1/2, carga 115 kN/eje, categoría de tráfico KR 5, incluidas las carreteras de servicio. Como parte de la inversión, se prevé la construcción de cruces de rotonda y un puente sobre la línea ferroviaria. El grupo destinatario son los usuarios públicos de la vía pública (transporte individual y público), en particular de la zona de inversión, así como del tránsito. (Spanish) / rank
 
Normal rank
Property / summary: El objeto de la inversión es la construcción de un tramo de la carretera que constituye la «carretera de aglomeración A4-S5» — Comunicación del puente sobre el río Oder en Brzeg Dolny con la carretera nacional n.º 94 y carretera voivoda n.º 340 en el área de — tramo de la carretera voivodato n.º 341 (km 12 + 547,80) a la carretera de distrito n.º 1353D en Radecz (km aprox. 17+ 940.00) — como continuación de la construcción de cruces a través de Odra. El objetivo general de la acción es garantizar la coherencia espacial en la red vial existente. El proyecto forma parte de la carretera de circunvalación de la aglomeración, que es también la circunvalación de la ciudad de Brzeg Dolny en el Voivodato de Baja Silesia. Por lo tanto, la acción permitirá retirar el tránsito de la zona urbanizada de la localidad antes mencionada. Además, el objetivo del proyecto es también aliviar el cruce de carreteras de Wrocław generado en municipios adyacentes y del tráfico exterior, cuyo destino son esos municipios. El tramo previsto enriquecerá el sistema de transporte del distrito y del voivodato al oeste de Wrocław, lo que reducirá y mejorará la calidad de los servicios de transporte en el lado occidental de la aglomeración de Wrocław. La creación de una nueva carretera mejorará la seguridad vial en los tramos concurridos de la red vial existente y mejorará la accesibilidad del transporte de los centros regionales. En última instancia, al conectarse a la red existente de carreteras nacionales e internacionales, mejorará la calidad de las conexiones con la red RTE-T. El proyecto se ejecutará en la fórmula «diseño/optimizar y construir». La carretera prevista con una longitud aproximada de 5,4 km será un nuevo elemento del sistema de comunicación con los siguientes parámetros: carretera clase G 1/2, carga 115 kN/eje, categoría de tráfico KR 5, incluidas las carreteras de servicio. Como parte de la inversión, se prevé la construcción de cruces de rotonda y un puente sobre la línea ferroviaria. El grupo destinatario son los usuarios públicos de la vía pública (transporte individual y público), en particular de la zona de inversión, así como del tránsito. (Spanish) / qualifier
 
point in time: 19 January 2022
Timestamp+2022-01-19T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:03, 19 January 2022

Project Q95953 in Poland
Language Label Description Also known as
English
Communication of the bridge on the Oder river in Brzeg Dolny with national road No. 94 and voivodeship road No. 340 in the scope – section from voivodeship road No. 341 to district road No. 1353D in Radecz – as a continuation of the construction of the crossing through the Oder
Project Q95953 in Poland

    Statements

    0 references
    22,501,073.77 zloty
    0 references
    5,400,257.70 Euro
    13 January 2020
    0 references
    26,471,851.5 zloty
    0 references
    6,353,244.36 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    13 January 2015
    0 references
    16 August 2019
    0 references
    WOJEWÓDZTWO DOLNOŚLĄSKIE REPREZENTOWANE PRZEZ DOLNOŚLĄSKĄ SŁUŻBĘ DRÓG I KOLEI WE WROCŁAWIU
    0 references
    0 references
    Przedmiotem inwestycji jest budowa odcinka drogi stanowiącego „Łącznik Aglomeracyjny A4-S5" -Skomunikowanie mostu na rzece Odrze w miejscowości Brzeg Dolny z drogą krajową nr 94 i drogą wojewódzką nr 340 w zakresie – odcinek od drogi wojewódzkiej nr 341 (km 12+547,80) do drogi powiatowej nr 1353D w m. Radecz (km ok. 17+940,00) - jako kontynuacja budowy przepraw przez Odrę. Celem nadrzędnym działania jest zapewnienie spójności przestrzennej w zakresie sieci drogowej już istniejącej. Projekt stanowi realizację części obwodnicy aglomeracyjnej, będącej jednocześnie obwodnicą miejscowości Brzegu Dolnego w Województwie Dolnośląskim. Działanie pozwoli zatem na wyprowadzenie tranzytu z obszaru zabudowanego ww. miejscowości. Ponadto celem projektu jest również odciążenie wrocławskiego węzła drogowego od ruchu generowanego w obrębie przyległych gmin a także od ruchu zewnętrznego, którego punktem docelowym są owe gminy. Projektowany odcinek wzbogaci układ komunikacyjny powiatu i województwa na zachód od Wrocławia przez co skróci i poprawi jakość obsługi transportowej po zachodniej stronie aglomeracji Wrocławskiej. Powstanie nowej drogi wpłynie na poprawę bezpieczeństwa ruchu drogowego na obciążonych ruchem odcinkach istniejącej sieci dróg i poprawi dostępność transportową ośrodków regionalnych. Docelowo, przez powiązanie z istniejącą siecią dróg krajowych i międzynarodowych, wpłynie na poprawę jakości połączeń z siecią TEN-T. Realizacja projektu nastąpi w formule „zaprojektuj/zoptymalizuj i wybuduj”. Projektowana droga o długości ok 5,4 km stanowić będzie nowy element układu komunikacyjnego o parametrach: klasa drogi G 1/2, obciążenie 115 kN/oś, kategoria ruchu KR 5 wraz z drogami serwisowymi. W ramach inwestycji przewiduje się budowę skrzyżowań typu rondo i obiektu mostowego nad linią kolejową. Grupą docelową są użytkownicy dróg publicznych (transportu indywidualnego i publicznego) w szczególności z obszaru objętego inwestycją jak również przemieszczających się tranzytem. (Polish)
    0 references
    The subject of the investment is the construction of a section of the road constituting “Agglomeration Connection A4-S5” -Communication of the bridge on the river Oder in Brzeg Dolny with national road No.94 and Voivodeship road No.340 in the scope – section from the voivodeship road No. 341 (km 12 + 547.80) to the district road No. 1353D in Radecz (km approx. 17 + 940,00) – as a continuation of the construction of crossings through the Oder. The overarching objective is to ensure spatial cohesion in the area of the existing road network. The project is a part of the agglomeration ring road, which is also the ring road of the town of Brzeg Dolny in the Lower Silesian Voivodeship. The action will therefore allow transit from the built-up area of the locality. Moreover, the aim of the project is also to relieve the load on the road junction in Wrocław from traffic generated within adjacent municipalities and also from external traffic, whose destination is those municipalities. The planned section will enrich the communication system of the county and the voivodship west of Wrocław, thereby shortening and improving the quality of transport services on the western side of the Wrocław agglomeration. The creation of a new road will improve road safety on traffic-loaded sections of the existing road network and improve the transport accessibility of regional centres. Ultimately, by linking with the existing network of national and international roads, it will improve the quality of connections to the TEN-T network. The project will be implemented under the formula “design/optimise and build”. The projected road with a length of approx. 5.4 km will be a new element of the communication system with parameters: road class G 1/2, load 115 kN/axle, traffic category KR 5 and service roads. The investment envisages the construction of junctions of a roundabout and a bridge facility over the railway line. The target group shall be users of public roads (individual and public transport) in particular from the area covered by the investment as well as transit. (English)
    15 October 2020
    0 references
    L’objet de l’investissement est la construction d’un tronçon de la route constituant la «route d’agglomération A4-S5» — Communication du pont sur la rivière Oder à Brzeg Dolny avec la route nationale no 94 et la route voïvodie no 340 dans la zone de — tronçon de la route voïvodie no 341 (km 12 + 547.80) à la route de district no 1353D à Radecz (km env. 17+ 940.00) — comme suite à la construction de passages à niveau à travers Odra. L’objectif principal de l’action est d’assurer la cohérence spatiale du réseau routier existant. Le projet fait partie du périphérique d’agglomération, qui est également le contournement de la ville de Brzeg Dolny dans la Voïvodie de Basse-Silésie. L’action permettra donc de retirer le transit de la zone bâtie de la localité susmentionnée. En outre, l’objectif du projet est également de soulager le carrefour routier de Wrocław du trafic généré à l’intérieur des municipalités adjacentes et du trafic extérieur, dont la destination est celle de ces communes. La section prévue enrichira le système de transport du district et de la voïvodie à l’ouest de Wrocław, ce qui permettra de raccourcir et d’améliorer la qualité des services de transport du côté ouest de l’agglomération de Wrocław. La création d’une nouvelle route améliorera la sécurité routière sur les tronçons occupés du réseau routier existant et améliorera l’accessibilité des centres régionaux aux transports. En fin de compte, en reliant le réseau existant de routes nationales et internationales, il améliorera la qualité des connexions au réseau RTE-T. Le projet sera mis en œuvre dans la formule «conception/optimisation et construction». La route prévue d’une longueur d’environ 5,4 km constituera un nouvel élément du système de communication avec les paramètres suivants: classe de route G 1/2, charge 115 kN/essieu, catégorie de circulation KR 5 y compris routes de service. Dans le cadre de l’investissement, la construction de passages à niveau giratoires et d’un pont au-dessus de la ligne de chemin de fer est envisagée. Le groupe cible est constitué des usagers de la route publique (transports individuels et publics), en particulier de la zone d’investissement ainsi que du transport en commun. (French)
    1 December 2021
    0 references
    Gegenstand der Investition ist der Bau eines Abschnitts der Straße, der die „Agglomerationsstraße A4-S5“ bildet – Kommunikation der Brücke über die Oder in Brzeg Dolny mit der Nationalstraße 94 und der Woiwodschaftsstraße Nr. 340 im Gebiet von – Abschnitt von der Woiwodschaft Straße Nr. 341 (km 12 + 547.80) zur Kreisstraße Nr. 1353D in Radecz (km ca. 17+ 940.00) – als Fortsetzung des Baus von Kreuzungen über Odra. Übergeordnetes Ziel der Maßnahme ist es, die räumliche Kohärenz des bestehenden Straßennetzes zu gewährleisten. Das Projekt ist Teil der Agglomerationsringstraße, die auch die Umgehung der Stadt Brzeg Dolny in der Woiwodschaft Niederschlesien ist. Die Maßnahme wird es daher ermöglichen, den Transit aus dem bebauten Gebiet der oben genannten Ortschaft zu entfernen. Darüber hinaus zielt das Projekt darauf ab, den Straßenkreuz Wrocław vom Verkehr innerhalb benachbarter Gemeinden und vom externen Verkehr zu entlasten, dessen Ziel diese Gemeinden sind. Der geplante Abschnitt wird das Verkehrssystem des Bezirks und der Woiwodschaft westlich von Wrocław bereichern, wodurch die Qualität der Verkehrsdienste auf der westlichen Seite des Ballungsraums Breslau verkürzt und verbessert wird. Die Schaffung einer neuen Straße wird die Straßenverkehrssicherheit auf befahrenen Abschnitten des bestehenden Straßennetzes verbessern und die Verkehrsanbindung regionaler Zentren verbessern. Durch die Anbindung an das bestehende Netz nationaler und internationaler Straßen wird die Qualität der Verbindungen zum TEN-V-Netz verbessert. Das Projekt wird in der Formel „Design/optimieren und bauen“ umgesetzt. Die geplante Straße mit einer Länge von etwa 5,4 km wird ein neues Element des Kommunikationssystems mit folgenden Parametern sein: Straßenklasse G 1/2, Last 115 kN/Achs, Verkehrsklasse KR 5 inklusive Servicestraßen. Im Rahmen der Investition ist der Bau von Kreisverkehrsübergängen und einer Brücke über die Eisenbahnstrecke vorgesehen. Zielgruppe sind die öffentlichen Straßenverkehrsteilnehmer (Einzel- und ÖPNV), insbesondere aus dem Investitions- und Transitbereich. (German)
    7 December 2021
    0 references
    Het doel van de investering is de aanleg van een weggedeelte dat de „Agglomatieweg A4-S5” vormt — Mededeling van de brug over de rivier de Oder in Brzeg Dolny met nationale weg nr. 94 en woiwodschapsweg nr. 340 in het gebied — van woiwodschapsweg nr. 341 (km 12 + 547,80) tot districtsweg nr. 1353D in Radecz (km ca. 17+ 940,00) — als voortzetting van de aanleg van kruisingen over Odra. De overkoepelende doelstelling van de actie is te zorgen voor ruimtelijke samenhang in het bestaande wegennet. Het project maakt deel uit van de agglomeratiering, die ook de omweg is van de stad Brzeg Dolny in het woiwodschap Neder-Silezië. De actie zal het dus mogelijk maken de doorvoer uit het bebouwde gebied van bovengenoemde plaats te verwijderen. Bovendien heeft het project ook tot doel de wegverbinding Wrocław te ontlasten van het verkeer dat wordt gegenereerd binnen aangrenzende gemeenten en van het externe verkeer, waarvan de bestemming deze gemeenten is. Het geplande traject zal het vervoerssysteem van het district en het woiwodschap ten westen van Wrocław verrijken, waardoor de kwaliteit van de vervoersdiensten aan de westelijke kant van de agglomeratie Wrocław wordt verkort en verbeterd. De totstandbrenging van een nieuwe weg zal de verkeersveiligheid op drukke gedeelten van het bestaande wegennet verbeteren en de toegankelijkheid van het vervoer van regionale centra verbeteren. Uiteindelijk zal de verbinding met het bestaande netwerk van nationale en internationale wegen de kwaliteit van de verbindingen met het TEN-T-netwerk verbeteren. Het project zal worden uitgevoerd in de formule „ontwerp/optimaliseren en bouwen”. De geplande weg met een lengte van ongeveer 5,4 km zal een nieuw element van het communicatiesysteem zijn met de volgende parameters: wegklasse G 1/2, belasting 115 kN/as, verkeerscategorie KR 5 inclusief dienstwegen. In het kader van de investering is de aanleg van rotondeovergangen en een brug over de spoorlijn gepland. De doelgroep is openbare weggebruikers (individueel en openbaar vervoer), met name uit het investeringsgebied en de doorvoer. (Dutch)
    16 December 2021
    0 references
    Oggetto dell'investimento è la costruzione di un tratto della strada che costituisce la "Strada Agglomerazione A4-S5" — Comunicazione del ponte sul fiume Oder a Brzeg Dolny con la strada nazionale n. 94 e la strada voivodata n. 340 nella zona di — tratto dalla strada voivodata n. 341 (km 12 + 547,80) alla strada distrettuale n. 1353D a Radecz (km ca. 17+ 940,00) — come continuazione della costruzione di attraversamenti attraverso Odra. L'obiettivo generale dell'azione è garantire la coerenza territoriale della rete stradale esistente. Il progetto fa parte della circonvallazione dell'agglomerato, che costituisce anche la circonvallazione della città di Brzeg Dolny nel voivodato della Bassa Slesia. L'azione consentirà pertanto di eliminare il transito dall'area edificata della suddetta località. Inoltre, l'obiettivo del progetto è anche quello di alleviare il raccordo stradale di Breslavia dal traffico generato all'interno dei comuni limitrofi e dal traffico esterno, la cui destinazione sono tali comuni. La sezione prevista arricchirà il sistema di trasporto del distretto e del voivodato a ovest di Breslavia, accorciando e migliorando così la qualità dei servizi di trasporto sul lato occidentale dell'agglomerato di Breslavia. La creazione di una nuova strada migliorerà la sicurezza stradale sui tratti trafficati della rete stradale esistente e migliorerà l'accessibilità dei trasporti dei centri regionali. Infine, collegandosi alla rete esistente di strade nazionali e internazionali, migliorerà la qualità dei collegamenti con la rete TEN-T. Il progetto sarà attuato nella formula "progettazione/ottimizzazione e costruzione". La strada progettata con una lunghezza di circa 5,4 km sarà un nuovo elemento del sistema di comunicazione con i seguenti parametri: classe stradale G 1/2, carico 115 kN/asse, categoria di traffico KR 5 comprese le strade di servizio. Nell'ambito dell'investimento, è prevista la costruzione di attraversamenti di rotatoria e di un ponte sulla linea ferroviaria. Il gruppo destinatario è costituito dagli utenti pubblici della strada (trasporti individuali e pubblici), in particolare dal settore degli investimenti e dal transito. (Italian)
    16 January 2022
    0 references
    El objeto de la inversión es la construcción de un tramo de la carretera que constituye la «carretera de aglomeración A4-S5» — Comunicación del puente sobre el río Oder en Brzeg Dolny con la carretera nacional n.º 94 y carretera voivoda n.º 340 en el área de — tramo de la carretera voivodato n.º 341 (km 12 + 547,80) a la carretera de distrito n.º 1353D en Radecz (km aprox. 17+ 940.00) — como continuación de la construcción de cruces a través de Odra. El objetivo general de la acción es garantizar la coherencia espacial en la red vial existente. El proyecto forma parte de la carretera de circunvalación de la aglomeración, que es también la circunvalación de la ciudad de Brzeg Dolny en el Voivodato de Baja Silesia. Por lo tanto, la acción permitirá retirar el tránsito de la zona urbanizada de la localidad antes mencionada. Además, el objetivo del proyecto es también aliviar el cruce de carreteras de Wrocław generado en municipios adyacentes y del tráfico exterior, cuyo destino son esos municipios. El tramo previsto enriquecerá el sistema de transporte del distrito y del voivodato al oeste de Wrocław, lo que reducirá y mejorará la calidad de los servicios de transporte en el lado occidental de la aglomeración de Wrocław. La creación de una nueva carretera mejorará la seguridad vial en los tramos concurridos de la red vial existente y mejorará la accesibilidad del transporte de los centros regionales. En última instancia, al conectarse a la red existente de carreteras nacionales e internacionales, mejorará la calidad de las conexiones con la red RTE-T. El proyecto se ejecutará en la fórmula «diseño/optimizar y construir». La carretera prevista con una longitud aproximada de 5,4 km será un nuevo elemento del sistema de comunicación con los siguientes parámetros: carretera clase G 1/2, carga 115 kN/eje, categoría de tráfico KR 5, incluidas las carreteras de servicio. Como parte de la inversión, se prevé la construcción de cruces de rotonda y un puente sobre la línea ferroviaria. El grupo destinatario son los usuarios públicos de la vía pública (transporte individual y público), en particular de la zona de inversión, así como del tránsito. (Spanish)
    19 January 2022
    0 references

    Identifiers

    RPDS.05.01.01-02-0002/16